Skip to the record
Accept no substitutions.

Original source · versioned page text

Decision Notice [As Published]

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                          2009/1512



Stormwater and Soil Quality Protection

27.    Following the third year of operation, annual monitoring within a representative sample of
       soils from beneath the grass pavers must be undertaken for Petroleum Hydrocarbon
       Components, build up. The monitoring must be undertaken by a person suitably qualified
       and experience in monitoring of soil contamination. Monitoring and any required remediation
       actions must be undertaken in accordance with the National Environment Protection Council
       Guideline on the Investigation Levels for Soil and Groundwater. Monitoring is permitted to
       discontinue following receipt of a letter from a person suitably qualified in soil contamination
       which confirms that any future contamination form the car park will not pose a risk to the
       environment or public health.

Sunshine Coast Water
28.    Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade
       personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
29.    All structures must maintain a minimum clearance of 1.5 metres from Council sewer mains,
       and 1.0 metre from sewer manhole chambers.
30.    The level of the existing sewer manholes must be adjusted to suit the proposed finished
       surface levels. Work must be undertaken by Sunshine Coast Water at the applicants cost.
31.    Storm water retention systems, gross pollutant traps and water reservoirs must maintain a
       minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure.
32.    Landscape planting within 1.5 metres of Council sewerage infrastructure must be approved
       varieties and low growing when mature.
33.    Construction works undertaken in the vicinity of Council water supply or sewerage
       infrastructure must not adversely affect the integrity of the infrastructure. All costs
       associated with repair, replacement or alteration of infrastructure must be met by the
       applicant.
Earthworks
34.    Earthworks required on site shall be carried out in accordance with Council’s Planning
       Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
       ponding of water on any adjoining lands or the blockage of, or interference with, any natural
       watercourses.
35.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
       fences and/or structures and/or lands that border the development site. Fences that are
       affected shall be replaced prior to the Building Certifier issuing the Certificate of
       Classification.
Erosion and Sediment Control
36.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
       site. In this regard the site must be managed in accordance with current best practise for
       managing sediment and erosion. At the time of writing these conditions measures detailed in
       the Sunshine Coast Manual for Erosion and Sediment Control Version 1.2 are current best
       management practise.




                                                                                       Page 4 of 10
Log in to download the original file

Decision Notice [As Published].pdf · 522 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.