Decision Notice [As Published]
2009/1512
Stormwater and Soil Quality Protection
27. Following the third year of operation, annual monitoring within a representative sample of
soils from beneath the grass pavers must be undertaken for Petroleum Hydrocarbon
Components, build up. The monitoring must be undertaken by a person suitably qualified
and experience in monitoring of soil contamination. Monitoring and any required remediation
actions must be undertaken in accordance with the National Environment Protection Council
Guideline on the Investigation Levels for Soil and Groundwater. Monitoring is permitted to
discontinue following receipt of a letter from a person suitably qualified in soil contamination
which confirms that any future contamination form the car park will not pose a risk to the
environment or public health.
Sunshine Coast Water
28. Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
29. All structures must maintain a minimum clearance of 1.5 metres from Council sewer mains,
and 1.0 metre from sewer manhole chambers.
30. The level of the existing sewer manholes must be adjusted to suit the proposed finished
surface levels. Work must be undertaken by Sunshine Coast Water at the applicants cost.
31. Storm water retention systems, gross pollutant traps and water reservoirs must maintain a
minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure.
32. Landscape planting within 1.5 metres of Council sewerage infrastructure must be approved
varieties and low growing when mature.
33. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Earthworks
34. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
35. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site. Fences that are
affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification.
Erosion and Sediment Control
36. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. In this regard the site must be managed in accordance with current best practise for
managing sediment and erosion. At the time of writing these conditions measures detailed in
the Sunshine Coast Manual for Erosion and Sediment Control Version 1.2 are current best
management practise.
Page 4 of 10