Council archive · source document
Combined Approved Plans OPW21.0202.01 · OPW21/0202.01
Plans and drawings: the text below has words only, no drawings.
OP WORKS FOR APPROVAL REMOVE INDICATED TREES TO PROVIDE CLEAR LINE OF SIGHT B* B ee 1.25m ed 1.25m | a eee ene ~ [a Re A 1.1m DO NOT SCALE, IF INDOUBT ASK! 1.1m fe : a a: B |10/12/21INFORMATION REQUESTED _| BP|MP 5.480% A |22/11/21|ISSUE FOR OPW BP |MP Rev Date Description By Chk RL_97.000 RL_97.200 Clearance = © 8 3 xz a | be cl s 3 ta = 2 s S Obstruction | * < < < g < Ss < earance = co oO an S m N Obstruction | * < z S * * + Ss S > 3 3 3 a Ss an SIGHT m 2 m co m a ~t me SIGHT Bs R S S 8 8 S LINES S = 8 8 2 a 3 3 LINE 5 5 S 3S m = = = s = = = = = [email protected] = = = 5 = = = core 5 5 8 S S S 37 MARY ST NOOSAVILLE, QLD EXISTING |S = 2 ai RS a m 07 5211 1003 SURFACE |= = = = = = - Ss 3 3 3 s s 3 3 Client Ss Ss 2 2 2 2 = CHAINAGE |? = & a $ g 3 g LISTRA PTY LTD CHAINAGE IP = & a $ A an LONGITUDINAL SECTION ProweiName Alt S1 Ch 0.000 to Ch 65.384 LONGITUDINAL SECTION SCALES: HORIZONTAL 1:250 VERTICAL 1:50 522 COOROY MOUNTAIN ROAD DWAY 1 SSD 1 Ch 0.000 to Ch 58.614 COOROY MOUNTAIN SCALES: HORIZONTAL 1:250 VERTICAL 1:50 Title LINE OF SIGHT ASSESSMENT DRIVEWAY 1 OF 2 LINE OF SIGHT WEST Project No. Discipline Status NOOSA COUNCIL 20210080 CWVIL OPW Designed By Drawn By Scale APPROVED PLAN BP BP 1:250 aan OPW21/0202 24 JAN 2022 co |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
FOR APPROVAL TRIM BANK IN THIS AREA TO ACHIEVE 300MM CLEARANCE FOR LINE OF SIGHT oO 4 = __ = 0 6° 3 s sv Tota _ MY ro oe ON RS J AS e s =< oe C 2 - 7 o a NP Se oe A 1.1m | --_ TRIM BANK IN THIS AREA TO ACHIEVE 300MM CLEARANCE | FOR LINE OF SIGHTI C DO NOT SCALE, IF IN DOUBT ASK! 1.25m a ~ B |10/12/21INFORMATION REQUESTED _|BP|MP A [22/11/21|ISSUE FOR OPW BP |MP Rev Date Description By Chk 6.207% wll, & = QO, RL_91.000 ar Clearance = 5 3 8 z = % ® 8 m g Obstruction | * + + + + * * * * + * [email protected] SIGHT 2 a a = 8 s g x 5 2 eS 37 MARY ST NOOSAVILLE, QLD LINE S S S ” & R m a 8 R in 07 5211 1003 Client EXISTING S 2 = S 2 2 % . " = LISTRA PTY LTD SURFACE = ” ” * > * * * * * Project Name s 3 s s s 3 3 3 s s R 522 COOROY MOUNTAIN ROAD CHAINAGE == 2 g a g g S 2 S g BS COOROY MOUNTAIN LONGITUDINAL SECTION = DWAY1 SSD 2 Ch 0.000 to Ch 97.030 SCALES: HORIZONTAL 1:250 VERTICAL 1:50 LINE OF SIGHT ASSESSMENT DRIVEWAY 1 OF 2 LINE OF SIGHT EAST Project No. Discipline Status NOOSA COUNCIL 20210080 CWVIL OPW Designed By Drawn By Scale APPROVED PLAN BP BP 1:250 aan | OPW21/0202 24 JAN 2022 cr |
Page 3
OP WORKS FOR APPROVAL REMOVE SMALL TREE TO PROVIDE CLEAR LINE OF SIGHT a DO NOT SCALE, IF IN DOUBT ASK! & B |10/12/21,|INFORMATION REQUESTED __|BP|MP A |18/11/21|ISSUE FOR OPW BP [MP Rev Date Description By Chk 5.556% a= RL 95.600 4 ( N Clearance S R 8 = 2 e Ps 5 a Obstruction | * g g + g g 2 + * [email protected] S 3 = = 3 2 = z z 37 MARY ST NOOSAVILLE, QLD SIGHT a 2 3 = x 2 m4 2 3 07 5211 1003 LINE ° = = = = = = = = Client EXISTING |S i S ie 8 & < 8 g LISTRA PTY LTD SURFACE > > = = ~ ~ — = = Project Name g g g g g g g g @ 522 COOROY MOUNTAIN ROAD CHAINAGE | S S S S S S S 3 COOROY MOUNTAIN LONGITUDINAL SECTION Tile DWAY2 SSD 1 Ch 0.000 to Ch 78.978 SCALES: HORIZONTAL 1:250 VERTICAL 1:50 LINE OF SIGHT ASSESSMENT DRIVEWAY 2 OF 2 LINE OF SIGHT WEST Project No. Discipline Status NOOSA COUNCIL 20210080 CWVIL OPW Designed By Drawn By Scale APPROVED PLAN BP BP 1:250 aan OPW21/0202 24 JAN 2022 fa |
Page 4
OP WORKS FOR APPROVAL . DO NOT SCALE, IF IN DOUBT ASK! & B }10/12/21,INFORMATION REQUESTED __|BP|MP A _122/11/21ISSUE FOR OPW BP |MP Rev Date Description By Chk -5.270% REC:<R L_90.400 Th RL_95.600|R 3 & $ " 5 = S e z 3 3 Clearance |= a 3S 3 S S N 5 @ S a Obstruction | * + eg “+ + > > + + + + [email protected] g S 8 s 8 a 2 S + 5 a 37 MARY ST NOOSAVILLE, QLD SIGHT z S R & S 2 8 % 4 = 6 07 5211 1003 a a oo oO mm ~ 2 a wn in st LINE Client EXISTING ey S So cy 3 a m an g = 3 LISTRA PTY LTD R a Ba BR a a a a a gs & SURFACE > Project Name s s s s s s s s s s z 522 COOROY MOUNTAIN ROAD CHAINAGE |S S S 3 $ 3 3 2 3 3 5 COOROY MOUNTAIN LONGITUDINAL SECTION = DWAY 2 SSD 2 Ch 0.000 to Ch 97.019 SCALES: HORIZONTAL 1:250 VERTICAL 1:50 LINE OF SIGHT ASSESSMENT DRIVEWAY 2 OF 2 LINE OF SIGHT EAST NOOSA COUNCIL “mon fom Lot AP P ROV © D P LAN ee. oP. wo 250 (at A1) OPW21/0202 24 JAN 2022
Page 5
0,000
TC 3.200
7
w€€,0S.92)
JOIN NEATLY TO
EXISTING ROAD
491
JOIN NEATLY TO 1638RP902161
EXISTING ROAD
COOROY MOUNTAIN ROAD
0.000 1
UIL 99.41
DIL 99.08
GRADE 3%
DRIVEWAY 2
CONTROL LINE
PROPOSED 375mm DIA CULVERT
PRECAST HEADWALLS
AND ROCK PROTECTION
AT INLET AND OUTLETS
UIL 97.75
DIL 97.46
GRADE 3.4%
DRIVEWAY 1
CONTROL LINE
EXISTING ROAD
CENTRE LINE
EXISTING EDGE OF
UNSEALED ROAD
PROPOSED
TABLE DRAIN
PROPOSED 375mm DIA CULVERT.
JOIN NEATLY TO
EXISTING
DRIVEWAY PROPERTY 25.076
BOUNDARY 522
9RP864130
JOIN NEATLY TO
EXISTING
DRIVEWAY
LEGEND:
— —— _ CONTROLLINE
100 MAJOR DESIGN CONTOUR (0.5m INTERVAL)
ee MINOR DESIGN CONTOUR (0.1m INTERVAL)
—--(D)---{D)---(D)— PROPOSED STORMWATER DRAINAGE,
NOTES:
1. REFER TO DRAWING C010 FOR EXISTING FEATURES LEGEND N OOSA Cc Oo U N Cc | L
2. PROPOSED CULVERTS AND HEADWALLS TO BE
CONSTRUCTED IN ACCORDANCE WITH IPWEAQ STD DWG
Boss APPROVED PLAN
North Point. Approved ST eaTiaa Project Address: Title
522 COOROY MOUNTAIN RD GENERAL ARRANGEMENT PLAN
ICOOROY MOUNTAIN
‘ADAM BROUGHTON RPEQ 8915
For and on behalf of RECOR Pty Lid QUALITY ENVROMIENT OF S|
N Scale EN NSHING GOAST [SRISBANE (Client Details Project Name Sheet Size
B | 10.07.24 | isSUE FOR CONSTRUCTION AB MP SCALE Lepmb pet pet) (mottos) www.recor.au | ABN 89 647 469 707 TRAVIS MCCARTHY PROPOSED DRIVEWAY UPGRADE Al
A | 23.04.24 | ISSUE FOR OPW APPROVAL DK AB 1: 100 (FULL SIZE) COPYRIGT © Ths deawig subject opyghtin accordance wih he agresmertbeveenRECOR Py Lid an RECOR' Project Number Drawing Number Revision
‘lon. This drawing sha oly be used forth space projet. This drawing shall ot be used for constuction uti marked as
Rev | Date Revision Description Drawn | Check DO NOT SCALE, IF IN DOUBT ASK "Issued For Construction’ inthe revision description. 20210080 C020 B
Page 6
DRVIEWAY 1 CONTROL LINE SETOUT
PT CHAINAGE | EASTING | NORTHING | HEIGHT BEARING RAD/SPIRAL | A.LENGTH | DEFL.ANGLE
IP 1 0.000 2381.137 | 8223.556 98.583 177°18'56.66"
TC 5.281 2381.385 | 8218.280 98.265 177°18'56.66"
IP2 8.259 2381.524 8215.301 98.390 R = -40.000 5.955 8°31'49.21"
10.000 2381.883 | 8213.590 98.575 170°33'21.88"
CT 11.236 2382.104 | 8212.374 98.695. 168°47'07.45"
20.000 2383.809 | 8203.778 98.877 168°47'07.45"
IP3 25.076 2384.796 | 8198.799 98.822 168°47'07.45"
DRIVEWAY 2 CONTROL LINE SETOUT
PT CHAINAGE | EASTING | NORTHING HEIGHT BEARING RAD/SPIRAL | A.LENGTH DEFL.ANGLE
IP 1 0.000 2347.775 8223.443 100.204 176°50'32.85"
TC 3.200 2347.951 8220.247 99.972 176°50'32.85"
5.000 2347.969 8218.448 99.908 181°59'56.51"
IP2 7.802 2348.209 8215.570 100.014 R = 20.000 9.203 26°21'54.46"
10.000 2347.175 8213.525 100.273 196°19'22.71"
CT 12.403 2346.363 8211.265 100.633 203°12'27.31"
15.000 2345.340 8208.878 100.980 203°12'27.31"
20.000 2343.369 8204.282 101.292 203°12'27.31"
IP3 22.668 2342.318 8201.830 101.406 203°12'27.31"
NOOSA COUNCIL
APPROVED PLAN
OPW21/0202.01 11 MAR 2025
CONTROL LINE —
I
DRIVEWAY
womens DESIGN SURFACE
I EXISTING SURFACE
3% 3h
a 1in2 BATTER
1 in 4 BATTER 1in4 BATTER
4
I
TURFED SWALE DRAIN |
\
DRIVEWAY TYPICAL SECTION
‘SCALE 1:20
02 02
SCALE
04
TURFED SWALE DRAIN
06 08 10
(metres)
1:20 (FULL SIZE)
8
2
S 28 g
2 2 =Z 3
8 8 8 2 2 8° t 8
2 gS EB g 3 & 3 EB
© S we = 3% & ot 8 E
E _ e Se ox 5 8 3 x§ 3 2
g 8 = SF oe a & z Cs & S
8 S 3s FE 88 = ~ 2 Be = a DESIGN SURFACE
9° S = x<§ KE x iS = as i x
¢ e BS cara & 8 = %o = &
6 x 58 a5 a = ¢ Sa N a
EXISTING SURFACE ——_ sk 2 o2 So
— N go —
a
p$———__ _ rc]
Horiz Curve Data + R-40m
Vertical Geometry Grade (%) ~$.150 % 4 12.000 % 1.000 % -1.163 %
Vertical Grade Length 982m 7 6.0751 6.916m 102m
Vertical Curve Length (m) 7|000m VC 000m VC 5.000m VC
Vertical Curve K Value IK 0.347 K 0.455 K2.311
DATUM R.L. 96.00
DEPTH TO
8 8 3 sala 2 RS 8 8
NATURAL SURFACE |8& S 3 Sis] s 3 S 3 §|§
DESIGN HEIGHT 8 5 g 2lals g 8 3 RIN
s s 8 s{s|s 8 8 8 s 1s
NATURAL SURFACE |g 5 e slals s| 3 z ala
8 8 S 8[8|8 8 8S 8 8 [8
CHAINAGE 3 z glals B} og g g
° a 3 slele = © R 8
DRIVEWAY 1 LONG SECTION
HORIZONTAL SCALE 1-100
VERTICAL SCALE 1:50
2
8
2 =
g 5
S S EB
x
& = & 3 = gi
8 2 » 2 = s é z 5
© s fee § © & S ®
Ss 5S =og 8 s 2 a 2
8 3 Sf 8 b 8 =
Ss & R z= 64 & 2 _—————
? 3 2
3 = 5 g
a = o £ o
a s 6 ——
a
[>——_,.
Horiz Curve Data + R20m
Vertical Geometry Grade (%) 7.291 % 15.000 % 4.281 %
Vertical Grade Length 6.419m 9.091m 7.159m
Vertical Curve Length (m) 7.000m VC 5.000m VC
Vertical Curve K Value K 0.314 K 0.466
TWO COAT (14mm / 7mm) C170 BITUMEN SEAL
DATUM RL. 97.50 125mm TYPE 2.1 CBR 80 BASECOURSE
DEPTH TO
8 sls g E/R 8 8
NATURAL SURFACE |§ sis S 8] 8 S s
DESIGN HEIGHT § B/N 8g 8/8 8 8 Zz
s s/s s s/s S s
s 8/8 s s/s s &
1in4 BATTER
NATURAL SURFACE |& sls B 8/8 8 8
s 8/8 s §|s s &
CHAINAGE 2 2 8/2 8 &
z als 3 s|2 2 g
DRIVEWAY 2 LONG SECTION
HORIZONTAL SCALE 1:100
VERTICAL SCALE 1:50
North Point J Approved lo ceavineay og Cea nex}
My
ii a
‘ADAM BROUGHTON RPEQ 8915 as
For and on behalf of RECOR Pty Ltd. ENVIRONMENT © #4 Be S|
N Scale 10 0 70 ENGINEERING & PROJECT SERVICES
SCALE (metres) SUNSHINE COAST | BRISBANE
B | 10.07.24 | ISSUE FOR CONSTRUCTION AB MP 1 ol 50 (FULL SIZE) 5 www.recor.au | ABN 89 647 469 707
A. | 23.04.24 | ISSUE FOR OPW APPROVAL DK AB SCALE i © (metres) COPYRIGHT © Ths crawing subject o copysightin accordance withthe agreement between RECOR Ply Lis and RECOR’S
72100 (FULL SIZE) Chen. This raving shal ony be used forth specie projet. Ths drawing shal not be use for construction ant marked as
Rev | Date Revision Description Drawn | Check DO NOT SCALE, IF IN DOUBT ASK "sued For Construction n the revision description
Project Address
522 COOROY MOUNTAIN RD
ICOOROY MOUNTAIN
Title
DRIVEWAY LONGITUDINAL AND TYPICAL SECTIONS
Client Details
TRAVIS MCCARTHY
Project Name Sheet Size
PROPOSED DRIVEWAY UPGRADE Al
Project Number Drawing Number Revision
20210080 C030 B
Page 7
COOROY MOUNTAIN ROAD SETOUT TABLE PT [EASTING | NORTH. [LEVEL 2389.167 | 8220.397 | 97.968 2386.964 | 8220.051 | 98.038 2385.132 | 8218.780 | 98.101 2384,036 | 8216.837 | 98.209 2383.895 | 8214.611 | 98.428 2384.193 | 8212.789 | 98.631 2378.743 | 8217.412 | 98.352 2378.135 | 8218.891 | 98.373 2377.092 | 8220.102 | 98.478 2375,719| 8220.922] 98.600 2374.158 | 8221.267] 98.682 2380.016 | 8211.960| 98.759 2379,535 | 8214.018] 98.554 2379.051 | 8216.093] 98.393 2358.421 | 8221.368| 99.394 2356.205 | 8221.047] 99.492 2354.165 | 8220.124] 99.581 2352.461 | 8218.673| 99.716 2351.225 | 8216.806] 99.826 2350.359 | 8214.986] 99.952 2349.399 | 8212.968| 100.192 2348.177 | 8210.401] 100.585 2344.486 | 8211.982] 100.706 2344.746 | 8214.607| 100.297 2343,635 | 8217.000] 100.136 2341.462 | 8218.496] 100.277 2338,830 | 8218.680] 100.475 CONOR WD = RVNONONUNNHNH BSB eee enna a OAR BNHSSSCGCHANATAREWDWH AS NR N North Point [Approved ADAM BROUGHTON RPEQ 8915, For and on behalf of RECOR Pty Ltd. NOOSA COUNCIL APPROVED PLAN OPW21/0202.01 11 MAR 2025 armenian cearnenay N QUALITY ENVIFONWENT OnE S| 10.07.24 ISSUE FOR CONSTRUCTION AB MP 23.04.24 ISSUE FOR OPW APPROVAL Dk AB Rev Date Revision Description Drawn Check Scale 1 22 3 4 «5 SCALE 1: 100 (FULL SIZE) DO NOT SCALE, IF IN DOUBT ASK (metres) Wl, agen - - ee &, ~~ . an mcr ENGINEERING & PROJECT SERVICES SUNSHINE COAST | BRISBANE. www.recor.au | ABN 89 647 469 707 COPYRIGHT © rent between RECOR Py Lid and RECOR's 1g Shall nol be used for construction unt marked as Project Address: 522 COOROY MOUNTAIN RD ICOOROY MOUNTAIN Title DRIVEWAY SETOUT PLAN [Client Details TRAVIS MCCARTHY Project Name PROPOSED DRIVEWAY UPGRADE ‘Sheet Size Al Project Number 20210080 [Drawing Number C033 Revision B
Used in these records
Combined Approved Plans OPW21.0202.01Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.