Council archive · source document
Amended Stormwater Plan · MCU18/0019
Attached to the e-mail Response to Info Request (Amended Proposal Plans Part 2 & Amended Stormwater Plan) - MCU18/0019.
Plans and drawings: the text below has words only, no drawings.
SC7440 – Goodchap St, Noosa 10 4.0 Stormwater Quantity Management 4.1 Background The proposed development has the potential to alter the existing hydrologic and hydraulic characteristics of the subject site unless suitable mitigation is achieved via careful hydraulic design of the proposed stormwater management drainage system. With urbanisation there is potential for sites to create or exacerbate drainage problems to downstream areas and/or drainage infrastructure. The purpose of this section of the SWMP is to determine the general requirements for bulk stormwater management for the proposed development. The design shall ensure that rainfall event discharges are mitigated and conveyed from the site in a manner that complies with Council’s Urban Stormwater Planning Guidelines and does not result in a worsened drainage situation to downstream infrastructure, without causing a nuisance or annoyance to residents/property owners. 4.2 Site Drainage Constraints and Opportunities 4.2.1 Drainage Constraints The increase of impervious areas will impact on the existing downstream boundary condition compared to pre-development peak flows. Therefore, a volume of detention will be required to limit flows to that of pre- development. 4.2.2 Drainage Opportunities The existing drainage in Val Crescent provides sufficient depth for connection to provide quality and quantity objectives. 4.3 Modelling Overview 4.3.1 Methodology The software package XP-STORM V2017.2, has been used to model the site in its current and post- developed state. The modelling has been undertaken to determine detail design parameters of on-site detention to replicate pre-development peak flow rates. As the development falls within the ‘Urban Residential’ development category (QUDM), the minor (10yr ARI) and major (100yr ARI) storm events were primarily sized for underground and overland design flows respectively. All events ranging from 2, 5, 10 20, 50 and up to the 100yr were analysed to compare pre/post development discharges ensuring ‘non-worsening’ discharge. The development modelling and analysis undertaken was based on the information provided by the detailed site survey and preliminary architectural layouts. A Rational Method “check” was conducted and compared with the pre-development model to confirm there were no gross errors, refer to Appendix E for Rational Method results.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Stormwater Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.