Council archive · source document
Amended Stormwater Plan · MCU18/0019
Attached to the e-mail Response to Info Request (Amended Proposal Plans Part 2 & Amended Stormwater Plan) - MCU18/0019.
Plans and drawings: the text below has words only, no drawings.
SC7440 – Goodchap St, Noosa 19
6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies the acceptable solutions set out in Councils planning
scheme policies.
Wastewater minimisation strategies will be adopted to reduce the demand on Council’s existing
infrastructure;
Best practice and practical water quality improvement devices are proposed which includes a
SPEL Environmental system of four (4) STORMFILTER cartridges, three (3) STORMSACK
baskets, and 200kL of stormwater harvesting;
A combined 225kL of detention volume is proposed to mitigate peak flows to that of the pre-
development scenario to ensure a situation of ‘non-worsening’;
The flood hazard overlay mapping does not impact on the subject site or prevent access/egress to
the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Stormwater Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.