SC7440 – Goodchap St, Noosa 2
TABLE OF CONTENTS
1.0 Introduction ............................................................................................................. 3
1.1 Background ......................................................................................................... 3
1.2 Scope .................................................................................................................. 3
1.3 Existing Topography ............................................................................................ 3
1.4 Proposed Development........................................................................................ 4
2.0 Water Cycle Management ....................................................................................... 5
2.1 Background ......................................................................................................... 5
2.2 Wastewater Minimisation ..................................................................................... 5
3.0 Water Quality Management .................................................................................... 5
3.1 Background ......................................................................................................... 5
3.2 Construction Phase.............................................................................................. 5
3.3 Operational Phase ............................................................................................... 6
3.3.1 Water Quality Objectives.................................................................................. 7
3.3.2 Catchment Areas ............................................................................................. 7
3.3.3 Pollutant Export Modelling ............................................................................... 7
3.3.3.1 Rainfall Data................................................................................................ 8
3.3.3.2 Treatment Nodes ......................................................................................... 9
3.3.4 Effectiveness in Pollution Reduction................................................................. 9
4.0 Stormwater Quantity Management....................................................................... 10
4.1 Background ....................................................................................................... 10
4.2 Site Drainage Constraints and Opportunities ...................................................... 10
4.2.1 Drainage Constraints ..................................................................................... 10
4.2.2 Drainage Opportunities .................................................................................. 10
4.3 Modelling Overview............................................................................................ 10
4.3.1 Methodology .................................................................................................. 10
4.3.2 Catchment Areas ........................................................................................... 11
4.3.3 Roughness Coefficients ................................................................................. 11
4.3.4 Storm Events ................................................................................................. 11
4.3.5 Outlet Condition ............................................................................................. 12
4.3.6 On-Site Detention .......................................................................................... 12
4.4 Modelling Results .............................................................................................. 13
4.5 Impacts on Existing Infrastructure ...................................................................... 14
5.0 Flood Hazard Overlay ........................................................................................... 18
6.0 Conclusions .......................................................................................................... 19
APPENDIX A – STORMWATER MANAGEMENT PLAN..................................................... 20
APPENDIX B – STORMWATER QUALITY MUSIC MODELLING ....................................... 21
APPENDIX C – XP-STORM MODELLING .......................................................................... 25
APPENDIX D – SPEL SPECIFICATIONS ........................................................................... 30
APPENDIX E – RATIONAL METHOD CALCULATIONS .................................................... 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Stormwater Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.