Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Amended Stormwater Plan · MCU18/0019

Attached to the e-mail Response to Info Request (Amended Proposal Plans Part 2 & Amended Stormwater Plan) - MCU18/0019.

of 42

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SC7440 – Goodchap St, Noosa                                                                                      8




Under the proposed conditions, the site was ‘split’ into three land use catchment nodes; the roofed area,
driveways and ground level uses. The pollutant export parameters utilised were based on the Urban
Residential pollutant loads, refer Tables 3.4 & 3.5. The pollutants have been generated stochastically in the
modelling scenario.


                      Parameter                                                       Value
               Rainfall threshold (mm)                                                 1
             Soil storage capacity (mm)                                               500
              Initial storage (% capacity)                                             10
                 Field capacity (mm)                                                  200
          Infiltration capacity coefficient (a)                                       211
          Infiltration capacity exponent (b)                                           5.0
                  Initial depth (mm)                                                   50
               Daily recharge rate (%)                                                 28
               Daily baseflow rate (%)                                                 27
             Daily deep seepage rate (%)                                               0
                       Table 3.4 – Rainfall-runoff Parameters Adopted (Urban Residential)



                                             TSS Log                  TP Log                         TN Log
 Flow Type      Surface Type
                                      Mean        Std Dev.    Mean        Std Dev.            Mean       Std Dev.
                      Roof             N/A          N/A        N/A             N/A            N/A             N/A
  Baseflow
                  Driveways            1.00         0.34      -0.97            0.31           0.20            0.20
Parameters
                 Ground Level          1.00         0.34      -0.97            0.31           0.20            0.20
                      Roof             1.30         0.39      -0.89            0.31           0.26            0.23
 Stormflow
                  Driveways            2.43         0.39      -0.30            0.31           0.26            0.23
Parameters
                 Ground Level          2.18         0.39      -0.47            0.31           0.26            0.23
                         Table 3.5 – Pollutant Export Values Adopted (Urban Residential)



3.3.3.1 Rainfall Data
Rainfall data for the site was chosen to give the best representation of actual conditions. A time period of
10 years between 1973 and 1983 was selected from the Cooroy Composite station, using a six minute time
step. The Mean Annual Rainfall for this period is 1595mm, and the Mean Annual ET is 1201mm. See
attached Appendix B for details.

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.