Skip to the record
Accept no imitations.

Original source · versioned page text

Reference Document - Flood & Stormwater Management Plan 28_8_2025

of 56

Page text read automatically using OCR, there may be inaccuracies

                 Item 23 / 24
                 Iss–e - Stormwater Quality

                 It is unclear how compliance with the pollutant load reduction targets have been calculated. The development
                 source node unmitigated loads should be factored by the required pollutant reduction percentages and then
                 compared to the results from the model. It is unclear if this has been done.

                 Information Request:

                 23. Provide a copy of the MUSIC model.

                 24. Provide further reporting of results which shows: the unmitigated loads from the development site(s) nodes
                 only, the required load reductions (kg/yr) from the development site loads in order to meet the targets, and the
                 mitigated results at the receiving node.

                 Response:

                 24. Calculations for mitigated loads are shown in Table 3-8, demonstrating that the bioretention basin
                 meets the target reductions for the development site.




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                  Page 12

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.