Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
Item 23 / 24
Iss–e - Stormwater Quality
It is unclear how compliance with the pollutant load reduction targets have been calculated. The development
source node unmitigated loads should be factored by the required pollutant reduction percentages and then
compared to the results from the model. It is unclear if this has been done.
Information Request:
23. Provide a copy of the MUSIC model.
24. Provide further reporting of results which shows: the unmitigated loads from the development site(s) nodes
only, the required load reductions (kg/yr) from the development site loads in order to meet the targets, and the
mitigated results at the receiving node.
Response:
24. Calculations for mitigated loads are shown in Table 3-8, demonstrating that the bioretention basin
meets the target reductions for the development site.
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 12
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.