Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
Figure 1-3: The development site (current and original developments) source loads from the MUSIC model
Table 1-1: Reformatted MUSIC results
(1) (2)
Development Required (3)
site pollutant load Target Total load Reduction
Pollutant Compliance
unmitigated removal for Reduction removal by Achieved (%)
source load development device (kg/yr)
(kg/yr) (kg/yr)
TSS 4,650 3,720 80% 3750 81% ✓
TP 9.29 5.6 60% 6.9 74% ✓
TN 51.6 23.2 45% 27 53% ✓
GP 485 437 90% 638 100% ✓
Information Request
Provide a copy of the MUSIC model and/or updated reporting addressing the above.
MUSIC results are as per model supplied with SMP-V2.
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 14
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.