Skip to the record
Search everything, all in one place.

Original source · versioned page text

Reference Document - Flood & Stormwater Management Plan 28_8_2025

of 56

Page text read automatically using OCR, there may be inaccuracies

                 Commercial in Confidence
                 This document is commercial-in-confidence. The recipient of this document agrees to hold all information presented
                 within as confidential and agree not to use or disclose or allow to use or disclosure of the said information to
                 unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the presentation or at any time
                 before, during or after an agreement has been reached, without prior written consent.

                 This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No responsibility is accepted
                 for the use of or reliance upon this report in whole or in part by any third party.




                 Limitations
                 The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is to display
                 information in accordance with the scope of services set out in the contract/quotation between Colliers | Engineering &
                 Design and its client. The scope of works and services were defined by the requests of the client, by the time and
                 budgetary constraints imposed by the client, and by the availability of access to site/s and information.

                 This report is prepared with information supplied by the client and possibly others which is presumed to be accurate and
                 complete. No responsibility is accepted for information that is withheld, incorrect or that is inaccurate, nor for changes
                 to the conditions over the passage of time or from latent circumstance or conditions. No warranty or guarantee is made
                 in relation to the data, findings and conclusions expressed in this report.

                 This report has been compiled at the level of detail specified in the report and no responsibility is accepted for
                 interpretations made at more detailed levels than so indicated.



                 Report Contact:

                  Name:                Lochlan Gillis
                  Position             Senior Water Resources Engineer
                  Phone:               (07) 3532 1300




                 Document Control
                 21-0352FSMP02-V3

                  Version         Date            Details       Prepared         Checked         Approved          Signed             RPEQ

                      1        18/07/2023          Issue          BB / LG            LG                KM

                      2        06/10/2023          Issue            LG              KM                 KM

                      3        15/11/2023          Issue            LG              KM                 KM

                      4        15/07/2025          Issue            ER              KM                 KM                             09298




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                              Page i

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.