Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
Commercial in Confidence
This document is commercial-in-confidence. The recipient of this document agrees to hold all information presented
within as confidential and agree not to use or disclose or allow to use or disclosure of the said information to
unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the presentation or at any time
before, during or after an agreement has been reached, without prior written consent.
This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No responsibility is accepted
for the use of or reliance upon this report in whole or in part by any third party.
Limitations
The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is to display
information in accordance with the scope of services set out in the contract/quotation between Colliers | Engineering &
Design and its client. The scope of works and services were defined by the requests of the client, by the time and
budgetary constraints imposed by the client, and by the availability of access to site/s and information.
This report is prepared with information supplied by the client and possibly others which is presumed to be accurate and
complete. No responsibility is accepted for information that is withheld, incorrect or that is inaccurate, nor for changes
to the conditions over the passage of time or from latent circumstance or conditions. No warranty or guarantee is made
in relation to the data, findings and conclusions expressed in this report.
This report has been compiled at the level of detail specified in the report and no responsibility is accepted for
interpretations made at more detailed levels than so indicated.
Report Contact:
Name: Lochlan Gillis
Position Senior Water Resources Engineer
Phone: (07) 3532 1300
Document Control
21-0352FSMP02-V3
Version Date Details Prepared Checked Approved Signed RPEQ
1 18/07/2023 Issue BB / LG LG KM
2 06/10/2023 Issue LG KM KM
3 15/11/2023 Issue LG KM KM
4 15/07/2025 Issue ER KM KM 09298
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page i
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.