                 Table 2-8: Comparison of Peak Flows (Existing Vs. Mitigated)

                       Event AEP             63.2%          50%          20%           10%             5%        2%         1%              1% CC
                    Existing (m3/s)           0.33          0.43         0.72          0.92            1.21      1.55       1.86            2.57
                   Mitigated (m3/s)           0.34          0.43         0.66          0.82            1.04      1.49       1.82            2.46
                    Change (m3/s)             0.01          0.00        -0.06         -0.10            -0.17     -0.06      -0.04           -0.10



                 Table 2-9: Comparison of 1% AEP event across all durations (Existing Vs. Mitigated)

                  Duration
                                   10        15        20          25      30        45        60           90   120     180        270       360
                  (min)
                  Existing
                                  0.98      1.68      2.13      2.45      2.57      2.49      2.45        2.29   2.16    2.04       1.77      2.02
                  (m3/s)
                  Mitigated
                                  0.91      1.53      1.96      2.28      2.38      2.46      2.35        2.20   2.06    1.89       1.69      1.92
                  (m3/s)
                  Change
                                  -0.07     -0.15     -0.17     -0.17     -0.18     -0.03     -0.09      -0.09   -0.11   -0.15      -0.08     -0.10
                  (m3/s)


                 Table 2-7 provides a summary of the basin configuration and it is noted there is 0.19m freeboard from the
                 1% (2100) AEP flood level to the basin crest. A sensitivity analysis was undertaken to assess the impact of
                 100% blockage of both basin outlet configurations. Under this scenario the flood level rose to RL0.89m and
                 demonstrates the spillway is able to convey the 1% (2100) AEP flows under fully blocked conditions without
                 overtopping the embankment crest. Given this and the fact that the land downstream of the detention
                 basin will remain undeveloped it is considered that the 0.08m from the 1% (2100) AEP flood level (and
                 0.37m from spillway level) to basin crest level is acceptable.

                 It is noted that with the inclusion of 0.3m of Extended Detention Depth for the co-located bioretention
                 basin, the total Q20 depth for the basin is expected to be less than the 1.2m recommended by QUDM for
                 safety concerns.

                 Refer to Appendix B for summary of WBNM output.




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                                  Page 24

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.