Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
Table 3-8: MUSIC Results – Portion of total pollutant loads for External Catchment and Site
Total Model Residual External Catchment Site – Mitigated load (less
Pollutant
load (kg/yr) Source Load (kg/yr) external catchment) (kg/yr)
TSS 2190 1290 900
TP 5.3 3.0 2.4
TN 43.5 19.0 24.5
GP 0 153 0
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 34
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025