Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Reference Document - Flood & Stormwater Management Plan 28_8_2025

of 56

Page text read automatically using OCR, there may be inaccuracies

                 5. ESTABLISHMENT AND OPERATIONAL
                    PHASE MANAGEMENT
                 5.1.       Establishment
                 Experience shows that the critical periods in the life of WSUD vegetated stormwater systems are the
                 construction and establishment phases. The timing and approach to these systems must be carefully
                 considered to ensure successful establishment and long-term performance. Bioretention systems are now
                 common stormwater treatment devices for new urban developments in Queensland. Successful
                 construction and allowing adequate time for the systems to establish is critical to their long-term
                 performance and function. Construction of the system is also linked to having suitable bioretention designs
                 in place to ensure, civil contractors have appropriate plans to construct to. Applying due care in the design
                 and construction phase will ensure the function of the system whilst also keeping on-going maintenance to
                 a minimum. It is highly recommended that the constructed activities be completed in accordance with the
                 Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Apr 2010). This will
                 require a sacrificial turf layer to be installed to protect the filter media from the building phase.

                 5.2.       Operational
                 It is not proposed for water quality monitoring of the bioretention system to be undertaken during the
                 operational phase of its life. The “Maintaining Vegetated Asset” guideline highlights that water quality
                 monitoring is not recommended to determine the performance of every vegetated stormwater asset, as it
                 is a specialized field that is complex and costly. In line with this guideline the on-going monitoring of water
                 quality from this device is not considered necessary considering the small size of the development.

                 The bioretention system will be maintained by the NSC, who as the asset custodian, will be responsible for
                 the on-going maintenance of the water quality device. Maintenance for the bioretention basin may involve
                 the following:

                     1.   Scheduled inspections;

                     2.   Removal of noxious plants or weeds;

                     3.   Maintaining the desired vegetation;

                     4.   Repairing erosion;

                     5.   Unblocking inlets and outlets;

                     6.   Removing litter and debris;

                     7.   Managing algal or moss growth; and

                     8.   Maintaining the permeability of the filtration.

                 Operations and maintenance should be conducted in accordance with the Maintaining Vegetated Stormwater
                 Assets (Feb 2012) guideline.




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                              Page 36

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.