Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
3.2.2. MUSIC Parameters ........................................................................... 29
3.2.3. Catchment Areas .............................................................................. 30
3.2.4. MUSIC Model Layout ....................................................................... 31
3.3. Treatment Measures .......................................................................... 32
3.3.1. Bioretention System ......................................................................... 32
3.3.2. Sediment Forebays .......................................................................... 33
3.4. Results 33
4. CONSTRUCTION PHASE MANAGEMENT ...................................... 35
4.1. Erosion and Sediment Control .......................................................... 35
5. ESTABLISHMENT AND OPERATIONAL PHASE
MANAGEMENT ............................................................................... 36
5.1. Establishment ...................................................................................... 36
5.2. Operational .......................................................................................... 36
6. CONCLUSION .................................................................................. 37
7. REFERENCES .................................................................................... 38
List of Tables
Table 1-1: Reformatted MUSIC results ........................................................ 14
Table 1-2: Pavilion St Road capacity calculation using Manning’s’
equation .......................................................................................................... 17
Table 2-1: Summary of Existing Catchment Parameters .......................... 20
Table 2-2: Existing Catchment Peak Flows .................................................. 20
Table 2-3: Comparison of WBNM and Rational Method Peak Flows –
SUB3 ................................................................................................................ 21
Table 2-4: External catchment overland flow (entering site) and pipe
flow (diverted around site via Pavilion St)................................................... 22
Table 2-5: Summary of Developed Catchment Parameters ..................... 22
Table 2-6: Comparison of Peak Flows At Site Outlet (Existing Vs.
Developed)...................................................................................................... 22
Table 2-7: Summary of Basin Structure Details ......................................... 23
Table 2-8: Comparison of Peak Flows (Existing Vs. Mitigated) ................. 24
Table 2-9: Comparison of 1% AEP event across all durations (Existing
Vs. Mitigated) .................................................................................................. 24
Table 2-10: Existing and Proposed Peak discharge at the Site
Boundary. ....................................................................................................... 26
Table 2-11: 1% AEP Flood Storage Comparison. ........................................ 26
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood
Levels............................................................................................................... 27
Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ....... 29
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.