Original source · versioned page text
Reference Document - Flood & Stormwater Management Plan 28_8_2025
LEGEND rm" Site Layout — Lot boundaries --- Easement — Vegetation Covenant Afflux (m) Wl <-0.1 HM -0.075 to -0.1 MB -0.05 to -0.075 || -0.025 to -0.05 -0.01 to -0.025 -0.025 -0.01 to 0.01 0.01 to 0.025 0.025 to 0.05 MM 0.05 to 0.075 HM 0.075 to 0.1 Hl >0.1 ' Was wet now dry MH Was dry now wet DATE: 10/07/2025 CONSULTANT: CREATED BY: _L. GILLIS IN A REVISION: Cc PAGE SIZE: A3 SCALE; |:!,500 N Colliers STATUS: ISSUE COORDINATE SYSTEM: GDA 94 / MGA ZONE 56 ee PROJECT TITLE: 33 PAVILION STREET, POMONA - FLOOD INVESTIGATION PROJECT NO: 23-0167 CLIENT: ocuRIGUBE BU BAEjosghLOOD AFFLUX MAP - PROPOSED (P08) VS EXISTING (E05) - 1% (2100) AEP FIGURE NO: APPENDIX E ersion: t, Version Date: 0270972025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.