Council archive · source document
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa Heads
C~SUPERIOR
OPIJ 14-/02-31
6 December 2013
Assessment Division
Noosa Shire Council
PO Box 141
Tewantin
Old 4565
Dear Sir,
RE: Proposed pontoon & walkway
7 Peza Court, Noosa Heads
Lot 0 on BUP 4114
(11363 Body Corp Pisces Noosa CTS 11069)
Please find attached our application for a Prescribed Tidal Works Approval to be
issued by Council for the above application.
Thank you for your assistance with this matter.
Sincerely,
J~,"
Engineering Department
BOX~ .•...•........ !....
R. .., ..•.. "r.:.1 •
Atlas Marine International Pty ltd tla Superior Jetties Superior Rotomoulding Pty Ltd tJa Superior Plastech
ABN. 94 100 364 254 ABN. 66 101 724 252
T. +61 (0)755948200 E. [email protected] T. +61 (0)75594 B282 E. [email protected]
f. +61 (0)7 5594 8222 PO Box 920. Nerang, Qld, Australia 421 1 f. +61 (0)75594 B288 PO Box 920, Nerang, Qld. Australia 4211
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
I::::=:CC:= __ ==============:::II Department of State Development, Infrastructure and Planning _
IDAS form 1-Application details
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete this form (IDAS form I-Application detaifs)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Pfanning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act t 994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
I use plan for the strategic port land, Brisbane core port land or airport land.
I
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on alilDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Name/s (individual or company name in full) I BODY CORPORATE FOR PISCES NOOSA UNITS CTS 11069
For companies, contact name I c/- APPROVALS COORDINATOR - SUPERIOR JETTIES
Postal address PO BOX 920
Suburb NERANG
State OLD 1 Postcode 14211
Country AUSTRALIA
Contact phone number 107 5594 8200
Mobile number (non-mandatory requirement)
Fax number (non-mandatory requirement)
Great state. Great opportunity.
Queen51and
Government _
Page 3
Email address (non-mandatory requirement) I [email protected]
Applicant's reference number (non-mandatory
requirement) 111363
1. What Is the nature of the development proposed and what type of approval is being sought?
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please oniy tick one box.)
D Material change of use D Reconfiguring a lot D Building work 0 Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval [{] Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
I PONTOON FOR PRIVATE USE
d) What is the level of assessment? (Please only tick one box.)
D Impact assessment [{] Code assessment
Table B-Aspect 2 of the application (If there are add.itional aspects to the application please list in Table e-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work D Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval D Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
D Impact assessment D Code assessment
Table G-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
D Refer attached schedule D Not required
IDAS form I-Applical/on details
VersIOn 3.0-1 July 2013
Page 4
2. Location of the premises (Complete Table D and/or Table E as applicable. Identify each Jot in a separate row.)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
0 Street address and lot on plan (All lots must be listed.)
0 Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/locality name code and plan no.
i) 7 PEZA COURT. NOOSA HEADS 4567 CP BUP 4114 NOOSA
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zonels for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan I precinct Applicable overlayls
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing latitude longitude
0 GDA94
0 WGS84
0 other
3, Total area of the premises on which the development is proposed (indicate square metres)
4, Current usels of the premises (e.g. vacant land, house, apartment building, cane farm etc.)
I PRIVATE RESIDENCES
IDAS form I-ApplicatIOn details
Version 3.0--1 July 20 /3
Page 5
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement)
o No D Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner's consent required for this application? (Refer to notes at the end of this form for more information.)
o No
D Yes--<:omplete either Table F, Table G or Table H as applicable
Table F
Name of owner/s of the land
l!We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table G
Name of owner/s of the land I
o The owner's written consent is attached or will be provided separately to the assessment manager.
Table H
Name of owner/s of the land I
D By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
17. Identify if any of the following apply to the premises (Tick applicable bcxles.)
o Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)--<:omplete Table I
D On strategic port land under the Transport Infrastructure Act 1994----{:omplete Table J
o In a tidal water area--<:omplete Table K
D On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
D On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table I
Name of water body, watercourse or aquifer
CANAL
Table J
Lot on plan description for strategic port land Port authority for the lot
fDAS form I-Application details
Version 3.0-1 July 2013
Page 6
,
• ,- --
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
NOOSA
8. Are there any existing easements on the premises? (e.g. for vehicula r access, electricity, overland flow,
water etc)
[(] No 0 Yes-ensure the type, location and dimension of each easem ent is included in the plans submitted
9. Does the proposal Include new building work or operational work 0 n the premises? (Including any
services)
0 No [(] Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to thl s application? (Refer to notes at the
end of this form for more information.)
[{] No-go to question 12 DYes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)
o No
o Yes-eomplete Table L and submit with this application the yellow local governmenVprivate certifier's copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, B, E, Lor P)
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 20091
[{] No
o Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form l-AppltcatlOn details
VersIOn 3.0-1 July 2013
Page 7
•
13. List below all of the forms and supporting information that accompany this application (Include alilDAS
forms. checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
MSQ CONCURRENCE MAIL
OWNERS CONSENT MAIL
RPEQ CERTIFIED DRAWINGS MAIL
IDAS FORM 23 MAIL
114. Applicant's declaration
lZJ By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information)
Notes for completing this form
• Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009
Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
• Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development"' the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner. or include a declaration by the applicant that the owner has given written consent to the making of the
application. II a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state. as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS lorm l-ApplicailOn delai/s
VersIon 3.0-/ Ju/y 2013
Page 8
Question 12
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800803481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONL Y
Date received ____________ 1 Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the
~--------------- I building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
QLeave project Amount paid form sighted by
Description of the work Date paid who sighted the
number ($) assessment
form
manaqer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
10113 OGOV (137468)
[email protected],au IDAS lorm I-Applicalion derails
Version 3.0--1 Juiy 20 13
www.dsdJp.qld.gov.au
Page 9
11S6S
TO WHOM IT MAY CONCERN
AUTHORITY TO LODGE MARINE BERTHING APPLICATIONS
As the registered owner/s of the property described below, I/we hereby authorise
Superior Jetties to lodge any applications associated with the required approvals for a
marine structure adjacent to the specified land and to make any required enquiries in
regard to such applications on my/our behalf.
Address of Property:
.. ?e.Zro...... L.QJ..l.r::,T ..... N.9g;h ..~~.JS..Post Code: ... 4;{;/.s:. ..
J.....
Lot Number: . Plan Number: .
Registered Owners:
NAME IN FULL SIGNATURE DATE
...........~....lie/IlL;.
Authority to Act. (Private) 2009
Page 10
____________________ Department of State Development, Infrastructure and Planning _
IDAS form 23-Tidal works and development within
coastal management districts
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for:
• operational work that is tidal works (including prescribed tidal works) or operational work within a coastal
management district (mentioned in the Sustainable Planning Regulation 2009, schedule 7, table 2, item 13)
• material change of use that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 3,
item 5 because it involves:
operational work carried out completely or partly in a coastal management district; or
building work carried out completely or partly in a coastal management district that is the construction of a new
premises with a gross floor area (GFA) of at least 1000m' or the enlargement of the GFA of an existing
premises by more than 1000m'
• reconfiguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2, item
14 because the land is situated completely or partly in a coastal management district or the reconfiguration is in
connection with the construction of a canai
• building work that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11
because it is on land completely or partly seaward of a coastal building line.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
Notes for completing this form
For all development applications you must:
• complete IDAS form I-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal
Protection and Management Regulation 2003, the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning
Regulation 2009.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
1. Confirm the following mandatory requirements accompany Confirmation of Method of
this application lodgement lodgement
Written description of the proposal, including a report that addresses any D Confirmed
relevant policies.
2. What is the nature of the work or development proposed by the application? (Tick all applicable boxes.)
[{] Operational work-{;omplete table A D Material Change of UsS-{;omplete table B
D Reconfiguring a Lot-{;omplete table C D Building Work-{;omplete table 0
Great state. Great opportunity.
Queensland
GO\lemment _
Page 11
Table A-operalional Work
Does the operational work involve the following? (Tick all applicable boxes.)
a) Tidal works as defined under the Coastal Protection and Management Act t995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?
D No [{]Yes
If yes, what is the purpose?
I PONTOON FOR PRIVATE USE I
[{] Private purpose (e.g. private pontoon)
D Another purpose (e.g. commercial marina)
Does the tidal works also require resource allocation under the Coastal Protection and Management Act 19957
[(]No DYes
If applicable what is the estimated value of the proposed works?
I I
b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.
o No DYes
If yes, which of the following?
D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.
D For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.
D For other purposes (please state below).
I I
If applicable what is the estimated value of the proposed works?
I I
c) Disposing of dredge spoil or other solid waste material in tidal water?
0 No DYes
If applicable what is the estimated value of the proposed works?
I I
d) Constructing an artificial waterway?
o No DYes
If applicable what is the length of the waterway?
I I
e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegetation on freehold and leasehold land)?
o No DYes
If applicable what is the estimated value of the proposed works?
I I
IDAS form 23-Tidal works anddevelopmenr wlthm
coastal management districts
Version 3.0-1 July 2013
Page 12
Table B-Material change of use
a) Does the material change of use involve the following? (Tick all applicable boxes.)
o Operational work carried out completely or partly in a coastal management district
b) Does the material change of use involve building work carried out completely or partly in a coastal management
district that is:
o the construction of new premises with a gross floor area of at least 1000 m'
o the enlargement of the gross floor area of existing premises by more than 1000 m'
Table C-Reconfiguring a lot
a) Does the reconfiguring a lot involve the following? (Tick all applicable boxes.)
o Land situated completely or partly in a coastal management district
o The construction of a canal
b) How many lots will be created?
I
Table D-Building work
a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection
and Management Act 1995?
o No o Yes
3. Is the tidal works located within a local government tidal area? (Tick all applicable boxes)
o No 0 Yes-provide details below
I Local government: I
I Mandatory supporting information
4. Please provide the following information Confirmation of Method of
lodgement lodgement
For all applications
A statement addressing the relevant part(s) of the State Development
Assessment Provisions (SOAP).
0 Confirmed
0 Not applicable
For applications involving operational work that is tidal works
A copy of the certificate of title for the land (including tidal land) that
would abut or adjoin the proposed works.
0 Confirmed
0 Not applicable
Plans showing: 0 Confirmed
• the real property description and boundaries of the land (including 0 Not applicable
tidal land) that would abut or adjoin the proposed works
• the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)
• the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works.
For tidal work that will occupy a navigable waterway provide a water
allocation area plan providing evidence that the proposed work will not
0 Confirmed
prejudice the access rights of adjoining property owners.
0 Not applicable
IDAS form 23-Tldal works and developmenl within
coastal management districts
VerSion 3 0-1 July 2013
Page 13
Details of the largest vessel, if any, to be moored at the structure. [Z] Confirmed
0 Not applicable
For prescribed tidal works, details of how the proposed work addresses [Z] Confirmed
the IDAS code for prescribed tidal work in the Coastal Protection and
Management Regulation 2003, schedule 4A.
0 Not applicable
If applicable, certification that the design of tidal works is suitable for [Z] Confirmed
intended use, signed by a Registered Professional Engineer of
Queensland (or equivalent).
0 Not applicable
For applications involving material change of use
Plans certified by a registered professional engineer of Queensland
(RPEQ) or a registered surveyor showing:
0 Confirmed
0 Not applicable
• the real property description and boundaries of the land
• the proposed works in relation to the location of the coastal
management district and coastal hazards.
For applications involving reconfiguring a lot
Plans certified by a registered surveyor showing: 0 Confirmed
• the real property description and boundaries of the land 0 Not applicable
• The location of the coastal management district and coastal hazards
in relation to the land being reconfigured
• Any land being surrendered as a separate lot on the plan of
subdivision.
For applications involving building works seaward of a coastal building line
Plans certified by a registered professional engineer of Queensland o Confirmed
(RPEQ):
• the real property description and boundaries of the land
o Not applicable
• the proposed works in relation to the location of the coastal building
line.
Notes for completing this form
• Please ensure all applicable fees are paid, noting that referral agency fees are to be paid to the Department of
Environment and Heritage Protection.
• For an application requiring referral to the Department of Transport and Main Roads (DTMR), it Is recommended
that the applicant contact DTMR to ensure that required information for assessment of the application is provided.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONL V
Date received ____________ 1 Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002 WAS form 23- Tidal works and development Within
10113 QGOV (13 74 68)
coastal management districts
[email protected]
Version 3.0-t July 2013
www.dsdip.qld.gov.au
Page 14
SPL-0514-009997
•...•
,
Queensland
Government
De-partmenl of
State Development.
Infrastruetun! and Planning
Our reference: SPL-0514-Q09997
Your reference: 11363
Date: 26 May 2014
Pisces Noosa Units
C/- Superior Jetties
PO Box 920
Nerang, OLD, 4211
Dear Sir/Madam,
Concurrence agency response before application is made-with conditions
7 Peza Court, Noosa Heads Old 4567
(Related to section 271 and given under section 285 of the Sustainable Planning Act 2009)
Reference is made to your correspondence dated 07/05/2014 requesting the
Department of State Development, Infrastructure and Planning provide a referral
agency response for the proposed development before the development application
is made to the assessment manager.
Applicant details
Applicant name: Pisces Noosa Units C/- Superior Jetties
Applicant contact details: PO Box 920
Nerang, OLD, 4211
Site details
Street address: 7 Peza Court, Noosa Heads Old 4567
Real property description: OBUP4114
Local government area: Noosa Shire Council
Application details
Proposed development: Development Permit for Operational Works - Prescribed
Tidal Works (Pontoon and walkway)
Aspects of development and type of approval being sought
Development type: Operational work
Approval type: Development permit
Department of State Development, Infrastructure and Planning
Page 15
SPl-QS14-Q09997
..
Referral triggers
The development application would be referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger: Schedule 7, Table 2, Item 15 - Maritime Safety matters
Documents supplied to support request
Plan title Author Reference no, date
Site plan, elevation & Superior Jetties 11363 - 001 28/04/2014
general notes
Conditions
Under section 287(1 )(a) of the Sustainable Planning Act 2009, the department
requires that the conditions set out in Attachment 1 attach to any development
approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department is
required to set out the reasons for the decision to impose conditions. These reasons
are set out in Attachment 2.
Further advice
Under section 287(6) of the Sustainable Planning Act 2009, the department offers
advice about the application to the assessment manager-see Attachment 3.
Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be
required to refer your application to the department if you submit this response in its
entirety when making the application to the assessment manager, and the following
conditions are satisfied:
# Any changes to the proposal before the application is made to the
assessment manger do not result in a substantially different development
to that which was presented to the department with the request for a
referral agency response
# The development application must be made to the assessment manager
within 12 months of the date of this referral agency response.
If you require any further information, please contact Blake Petchell, Planning Officer,
on 5352 9707 or via email [email protected] who will be pleased to
assist.
Yours sincerely
Garth Nolan
Manager, Planning
enc: Attachment 1-Conditions to be imposed
Attachment 2-Reasons for decision to impose conditions
Attachment 3-Further advice
Department of State Development. Infrastructure and Planning
Page 16
SPL-OS14-009997
Our reference: SPL-QS14-Q09997
Your reference: 11363
Attachment 1-Conditions to be imposed
No. Conditions I Condition timing
Development Permit for Operational Works - Prescribed Tidal Works (Pontoon and
walkway)
Schedule 7. Table 2. Item 15. Maritime Safety matters - Pursuant to section 2550 of
the Sustainable Planning Act 2009. the chief executive administering the Sustainable
Planning Act 2009 nominates the Director-General of the Department of Transport
and Main Roads (Maritime Safety Queensland) to be the assessing authority for the
development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
1. The applicant must supply the Regional Harbour Master Within two weeks
with completed "As Constructed" drawings. of the completion
of the works.
The required information is to be forwarded to:
Regional Harbour Master
Maritime Safety Queensland
Macarthur Avenue East
Pinkenba. Qld • 4008
2. Development must be carried out generally in accordance Upon the
with the following plans. except as modified by these completion of
concurrence agency conditions: works and to be
maintained at all
# Title: Site plan. elevation & general notes. times
Author: Superior Jetties. Plan: 11363 - 001.
Date: 28/04/2014.
3. Any ship. dry berth or device (including Air Lifting At all times
Pontoons) berthed. moored or attached to the pontoon/
structure must
not exceed the following sizes:
# Wet berth - length overall: 12.0m; beam:
4.0m
# Maximum Vessel Mass - 11.000 Kg
4. No part of any structure or any ship berthed at the At all times
approved structure is to encroach within 1.5metres from
the side boundaries of the allocated water space as shown
on the water allocation plan NQ - 01.
5. The applicant must notify the Regional Harbour Master Notification to be
in writing of the commencement and completion of the given at least two
approved works. weeks prior to the
commencement
of the works
The required information is to be forwarded to:
and within two
Regional Harbour Master weeks after the
Maritime Safety Queensland completion of the
Macarthur Avenue East works.
Department of State Development, Infrastructure and Planning Page1
Page 17
SPL-0514..Q09997
Pinkenba, Old, 4008
6. The structure must be adequately lit and all lighting must At all times
be positioned so that it does not cause a risk to the safe
navigation of other ships. Any freestanding piles must
have retro-reflective tape fitted.
lighting must be provided in accordance with Maritime
Safety Oueensland's requirements and section 3 of AS
4282-1997 'Controi of the obtrusive effects of outdoor
lighting'.
7. The pontoon must be constructed totally within the At all times
approved quayline.
8. The construction, operation or maintenance of the At all times
structure must not impede the safe navigation of other
ships or restrict safe access to or from neighbouring
structures.
9. The applicant must dispose of any obstructions and debris At all times during
encountered while undertaking the works. This work is construction
to be undertaken at no expense to the Department of
Transport and Main Roads and in accordance with any
directions issued by the Regional Harbour Master.
10. Any ship moored at this pontoon/jetty must not impede the At all times
safe navigation of other ships or restrict access to or from
neighbouring structures.
Department of Stale De ..•.
elopment. Infrastructure and Planning Page2
Page 18
SPL-0514-009997
Our reference: SPL-0514-009997
Yourreference: 11363
Attachment 2-Reasons for decision to impose conditions
The reasons for this decision are:
# The Department of Transport and Main Roads through Maritime Safety
Queensland has the responsibility to ensure that any ship, dry berth or device
(including Air Lifting Pontoons) berthed, moored or attached to the pontoon/
structure do not impede navigational safety
# The Department of Transport and Main Roads through Maritime Safety
Queensland is responsible for ensuring that the construction, operation
or maintenance of the approved structure will not adversely impact on
navigational safety.
# If the pontoon is implemented as proposed and in accordance with these
conditions, it will not impede navigational safety.
Findings on material questions offact
# The proposed pontoon does not extend beyond the established quayline or
neighbouring structures.
# A ship up to the maximum size specified can be berthed at this pontoon
without impeding navigational safety.
# Obstruction and debris uncovered or otherwise encountered during the
construction of the approved structure has the potential to interfere with
navigational safety.
# Maritime Safety Queensland needs to maintain the as constructed details of
all structures located within navigable waterways.
Evidence or other material on which the findings were based
# Plan prepared by Superior Jetties,
o Title: Site plan, elevation & general notes
o Reference No: 11363-001
o Dated 28/04/14
# Transport Operations (Marine Safety) Act 1994
# State Development Assessment Provisions published by the Department of
State Development, Infrastructure and Planning
# Sustainable Planning Act 2009
# Sustainable Planning Regulation 2009
Department of State Development, Infrastructure and Planning Page3
Page 19
SPL..Q514-009997
Our reference: SPL-0514-009997
Your reference: 11363
Attachment 3-Further advice
General advice
1. TOMSA AND TOMPA
The Harbour Master directs any ships and equipment you or agent use must
comply with the Transport Operations (Marine Safety) Act 1994. the Transport
Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine
Pollution) Act 1995
Department of State Development, Infrastructure and Planning Page4
Page 20
WET BERTHED VESSEL 10196 10000
MAXIMUM VESSEL LENGTH - 12.0m
MAXIMUM VESSEL BEAM
MAXIMUM VESSEL MASS
to. (jENERAl NOTES
4.0m
11 000 Kg -;;r
QUAYLINE I
EXISTING MOORING
STRUCTURE
o
o
o
M
-
1.1. The works that are the subject of these
dl!taited and certified on thue plans.
plans are structurally adequate for anticipated usage as
1.2. All structures depicted haw! been designed to comply with relevant regulations as set by the local authority,
~ I o
o
o
~ 10m, lm CONCRETE
PONTOON
Queensland Transport and the Prescribed Tidal Work (ode ISchedule 4A of the Coastal Protection &
Management Regulation 2003)
1.3. All structures. depicted herein haVE! be!!n designed in accordance with Australian Standards 06.51110.1
~ I ~ o
o
o
'"
lstructural design actions) AS1110.2lwind loadS) A51664.11Alum structures) 06.51720.1
(timber structuresl
AS2159lpilingJ 06.5)600 (concrete structures) AS3962ldesign of marinasl AS4100 [steel structur(!sl. R(!l(!vant
local cov(!nants, where applicabl(!, have b(!en consid(!red in the design.
I
1.4. Anchorag(! piles where applicabl(! have been design(!d assuming indep(!ndence from any adjacent revdment
structures.
2463m 331- 29'
1,5. Max water level used in th(! design of any piles shown in the structure is RL .2.05 AHOund(!r normal in-service
conditions. The pil(!s have not been designed tor 0100 flood conditions in excess of Rl .2.05 AHDnor scour of
the soil around the base of the piles. 1\400
1.6. Where applicable, the existing revetment wall appears Ito the best (!xtent that could be reasonably determined
via non-dntructive inspection) to be adequal(! for typical service loads (such as live, dead and impact) that may
be imposed by thl!: proposed gangwaylabutm(!nt connection.
LOT 250 CP
1.7. The following d(!sign parameters form the basis for the design of the structure Is depicted herein ~ ON BUP4114
1.1a (Pontoon &- Gangway) Single user piled Structure Design live load - 2.0 kPa
1.1b (Pontoon &- Gangway) Multipll!:unr piled Structur(! Dnign live load - 2.0 kPa
1.1c IDeck or Jettyl Single user piled Structure Design liy(! load - 2.0 kPa
1.1d (Deck or Jettyl Multipll!:user pill!:dStructure Design live load - lD kPa
1.1e Design Wave height - 0,5 m
1.1f Design ultimate wind velocity - 41 mls
1.19 Max stream vl!:locity (2" exceedance probability I .•1.S/s maximum
1.11'1 Anchorage, Mooring. Boardwalk or Jetty (where applicable) to be install(!d in accordancl!: with AS2159
to ensure the following minimum[working) dl!:sign loads are achieved (Unlus Noted Otherwise) :
Bearing Capacity - 5.0 tonnl!:
SITE PLAN 11: 2501
Lateral Capacity - 5,0 tonnl!:
2.0. STEEL
2.1. All steelwork to comply with AS4100. All w(!lds to b(! 6mm continuous tillet welds U.N.O,
2.2. AU steel expond to b(! hot dipped galvanized with coating mass not less than 600g/sq.m.
2.3. Stainless stl!:l!:lrestraint cables to bl!:min Smmdiam, Grade 316 and in accordanCI!: with AS 2831 wherl!: 12000
applicable.
lOOO 9000
10. CONCRETE
11. All concretl!: work to comply with AS3600.
3.2, Pontoon concrete strength to be 50MPa with SOmmslump U.N.O.
r
3.3. Pile concrete 40 HPa &- Abutml!:nt Block concrete 32 HPa.
3.4. Minimumcov(!r to th(! reinforCl!:ment - 40mm U.N,O.
I
TOP OF PILE Rl, .3 100m AHD
9.10m, 1.l2m ALUMINIUM
4.0. ALUMINIUM
HINGEO GANGWAY
4.1. All aluminium to comply with AS1664 and to b(! Iminimum)Grade 6063 T5 U.N.O.
1..2. Butt welds, wher(! specifil!:d, to have tull penetration. CONCRETE ABUTMENT
1..3 Surfaces between aluminium and concrete sl!:parated by bituminous membranl!:.
5.0. FLOATATION
5.1, Design stability load applied across half the width of the floating pontoon and on the I!:ntir(!gangway will H.A.1.1 Rl •• 1.1&m AHO ~_
produce a maximum tilt not exceeding 15 degrl!:es and will not cause any corner to emerge from the water. The
H H.wsl Rl, .O.&&m AHO ~ __
minimumfreeboard under such loading will not be less than 15mm at any point on the pontoon.
5.2. Polystyrenl!: SL gradl!: foam to be encased in high density polyethylene membrane fully w(!lded at the corners
and joins to form a complete seal impervious to marine organisms known to attach to such structures under
typical conditions. Rl: OOOm AHD
II 1=1
6.0. TIMBER
'------- - -=-~
uj-~
6.1. All timbl!:r work to comply with AS t120.1 to bl!!minimumFl1 hardwood. MlwslRl' -074m AHO ~--
6.2. All bolted timber connections, wher(! specifi(!d. to be galvanized lor stainless steel equivalent). LA 1.1 Rl, .112m AHO ~-
1.0. FIXINGS& FINISHINGS
1.1. All fixings to be 316 Grade Stainless Steel U.N.O. :L :L
f'1 EO
1 ::i~
)
IT IS THEOWNERSRESPONSIBILITYTO ENSURETHAT ANY ~lSO CONCRETE U W
VESSEL BERTHEDDOESNOT EXCEEDTHESE MAXIMUMS PILES
DO NOT SCALE ORA WINGS.
ELEV A TION 11: 1001
DArE PROX(r
No: DATE REVISION
A HAS MARINE INTERNA TIONAl PROPOSED PONTOON AND GANGWAY CERTIFIED
TRADI"'G AS 28-04-14 MG. TITLE SITE PLAN, ELEVATION & GENERAL NOTES
MARK WICHLINSKI
lijN~
SUPERIOR JETTIES (LIfNr
DRA filING NO, PISCES APARTMENTS
CoPYRIGHT CO ZO\l,
ATLAS HAAlt€ NTERNAT(WAL PTY. LTD. Hail Address; P.O,Box 910 Nerang 4211 11363-001 ADDRESS
7 PEZA (T
ND PART Of TitS DOCUt'£NT MAY BE CoPIED.
REPRODUCED, STORED IN A RETR(VAlILE SYSTU'I R(VISION NO, NOOSA HEAOS. QLD 4267
IN ANY FOIIH, OR TRAMSltTTEO I't' AltY t'£ANS PIt: (~71
SS94I1~Q
WITHOUT PRIOR WRlTTlH PERItSSIOH Of
AnAS HARNE WTlRNA TIONAl PTY, LTD
Fu: 1,7/55'4 rm
f•• , infothup«ior~tties.co,. ,. NA
RPEQ: 1643
Page 21
10000
SOO 3000 3000 3000
o
o
~
7
Ai """"' :
j't---_-_J~~_-_-_-_-l-_-_-_-_-_X_~-_-_-_-_L-_-_-_-_-l-_~-_-_-_X_-_-_-_-_-_L-_-_-_-_-J \-) ,
;:;J I
1/
r- 1 lAYER DF Sl-82
FABRIC
h I M16 TIE BOl TS - 300 lONG TO FUll lONGITUDINAL STRENGTHENING ""\ '/'T
200 ,~ PERIMETER DF FRAME Iii 1000mm CRS [BEAM "
~~~~~~~~~~~~~~~~
I" U,ND. TIE FABRIC TD BDl TS "
o o
o o
o o
m N
200
I: PRDVIDE EXTRA FRAME TIES :I
I,
" 12S0mm CRS) r~90
BEHIND EACH PilE BRACKET CO D IT
NUll
II
A
e--_-_-_ ---r------------r------------r-(iC===-!i==-~r-----(------------r--o:---------r------------r--r-7--r-TjJie~
"~l--:
W A •... ~ ~J.
-..:::::::/
1250 SOOO
PLAN 11: 401
~ 40 mP, CONCRETE DECK
ALUMINUM PONTOON ---, M16 TIE BOLTS - 300 lONG TO FUll
FRAME PERIMETER OF FRAME Iii 1000mm Cr.. UND ~ Sl-82 FABRIC.
TIE DR WElD FABRIC TO BOLTS SOmm TOP COVER
(
I
r
o
~ /--- lONGITUDINAL ," ,'.~
-~~
N STRENGTHENING BEAM
"- ~90 CDNDUIT
2 ONLY N16 BARS
RIO LIGATURES liiSOOCRS ~
FUll lENGTH OF BEAM "-- Sl CLASS PDl YSTYRENE WRAPPED IN
130 COVER)
1.6mm POL YETHYlENE EXTERNAL SKIN
WITH CDNTINUOUSl Y WELDED JDINTS
3000
SECTION A-A (1: 20)
r~~UP.ERIOR' 28-04-14
No: DATE REVIS/ON OATf PROJECT
A HAS MARINE INTERNA TlONAl PROPOSEDPONTOONAND GANGWAY CERTIFIED
s PONTOONCONSTRUCTIONDETAilS
n.
TR .•••DINCi .••• ORG. TmE
SUPERIDR JETTIES 'y~ JettIes ClIENT
MARK WICHLINSKI
DRA WIN(j NO: PISCES APARTMENTS
CON~~~ENG.
(Of'YRKiHT@ 20\10
..••TLAS M..••RIN( NTEIlH ..••TION..••l PTY.l TO. Hail Address: P.O.801 920 Nerang 4211 11363-002 ADDRESS
7 PEZA CT
ND PAIIT Of TitS OllCUl'lENT KAY BE (OPIED.
RlPROIlUCED, STORED IN A RETIlJEVASlE SYSTEI"I
IN ANY fORI"I. OIl TRANSHlTHD SY ANY H[AJrIS
WITHOUT PIlIOR WRITTEN PEIlI"llSSION Of
PI'" (m SH' '10~
FI{: r~71sm U11
REVISION NO: NODSA HEADS, QlD 4267
I DRAWNSYI DESKiNW I Lt1t.CKl08Y I PAptN 5/Lt I ~[ALt I fILl NAf'ft
3l~(JJ~lM~
AtlAS I"IAIlIHt; INT[IlNAJlONAl PTY.l TO. EJul: infotJSupMor~tfieS.COIl 'w I HW 155 I A3 I AS SHOWN I RPEQ~3
Page 22
GANGWA Y NUHBER HANDRAIL CAP STIFFENER BOTTOH CHORD SOxSOx3.0 SHS PRE-CAHBER
LENGTH OFBAYS SUPPORTS SOxSOx3.0 SHS THICKENER LAC/NG
50 x 50 x 2,0 SHS BOx50x3
100xSOx3.0 RHS SOx6 FLA T BAR
ALUMINIUM POS TS. RHS.
iil50 x 4 TUBE
50 x 50 x 1.6 ALUMINIUM'
BOX CROSSMEMBERS CFW TO
100 x 60 x 2.5 TRUSS BOTTOM
~ T
o
1340mm LONG,
~
CHORD @l400mm CENTRES
50 x 50 x 20 SHS
ALUMINIUM POS TS, ,f- 60---+
1
40 x 10 FLA T BAR,
DETAIL 1 DETAIL 2 DETAIL 3
SCALE 1: 5 SCALE 1: 5 SCALE 1: 3
POSTS 8. LACINGS. 50 x 50 x 3.0 EQUAL SPACED BAYS.
ALUMINIUM SHS, lUND) MAXIMUM 1300
It
oU~
~T-
'" ~ 100 x 60 x 2,5
RHS 11 LEGI
J 50 x 4 BUSHED TUBE HINGE xL 9700
iil65 x 95 HDPE ROLLERS, /
iii 16 SIS AXLES,
,
~
40 x 10 FLAT BAR,
ELEVA TION NTS
iil65 x 95 HDPE ROLLERS, 104 x 54 x 4,0 RADIUS LEG
400mm iii 16 SIS AXLES. CHANNEL END MEMBER.
o CENTRES MAX 50 x 50 x 50mm LONG SHS 100 x 60 x 2.5 104 x 54 x 40 RADIUS LEG
r '" ,f----,t' SADDLES @lBOOCRS ALONG 1 SIDE, RHS (1 LEG! CHANNEL END MEMBER,
,
II II
DETAIL 5
II II SCALE 1: 3
II II
II II
II
II rTOP CHORD
II
TAPERED END LACINGS
55 LCORNER 2,5mm ALUMINIUM PLA TE DECK 50 x 50 x 1.6 SHS
SEE DET AIL 4
ROLLER CORNER J 50 x 50 x 2.0
SEE DET AIL 3 WITH MARINE GRADE CARPET CROSS MEMBERS. SEE DET AIL 5 ALUMINIUM SHS lUND)
l
~ HANDRAIL SUPPORTS
PLAN NTS '" 100 x 50 x 3 ALUMINIUM RHS
N
1205
'" (WHERE REQUIRED - SEE T ABLEI
2.5mm ALUM SHEET DECKING
WITH CARPET GLUED TO TOP
BOTTOM CHORD
104 x 54 x 4,0 100 x 60 x 2,5 ALUMINIUM RHS
TI~~~2~5::~L~~::E~T=r===~T--r~=======~~~~===~=----===~=~~~~~== 0 ~ 1 --t 6B
RADIUS LEG CHANNEL. ~
'"
50 x 50 x 1.6 SHS BOX, ~ .... CROSSMEMBERS. 100 x 50 x 3 ALUMINIUM RHS
N
50 x 50 x 1.6 ALUMINIUM SHS, BEARER WELDED UNDER FRAME
60 x 10 FLAT BAR ------1325 (WHERE REQUIRED - SEE TABLE)
TAPERED END - DETAIL4 CUT 6Bmm LONG FOR 56-+4B
SCALE 1: 5 ROLLER SUPPORTS, SECTION x-x SCALE 1: 20
DATE PROJECT
No: OATE REVISION PROPOSED PONTOONAND GANGWAY CERTIFIED
A HAS MARINE INTERNA T10NAL
TRADING AS ".~ ~UP.ERIOR' 28-04-14 ORr;. rlTU GANGWAY CONSTRUCTIONDETAilS
SUPERIOR JETTIES •.••..
~ JettIes eLICNT
MARK WICHLINSKI
DRAWING NO: PISCES APARTMENTS CONSULTIN NG. ~
COPYRIGHT <D 201~
Hiil Address: P.O.Box 920 Ner<lng 4211 11363-003 ADDRESS
O. ~
ATLAS PlAAlNt: ~TEIlIt"T1OJj"'L PTV.l TO. 7 PEZA CT
NO PART OF THIS DOCt.tIENT HAY BE (OPIED,
IlEPIlOOllCED. STOIlED N" RETRIEVABLE SYSTfI'1
N ANY FOflJ'1. 011 TRANSl1lTnO BY ANY I"lfAIlS Ph, (Q7ISS941m
REvrslON NO: NOOSA HEADS, QLD 4267 I\;i\
WITHOUT PRI011 ••••RITTEN P£RI1ISSJOtI Of Fir: II71S59'1111
ATLAS HARM INT[IlNATlDNAl PlY, LTG fHl: infalisuprriorjetfies.cMt RPEQ, 1643
Page 23
600[ N12 HORIZONT AL BARS
. 30J
'" 50 TUBE WITH
~ @l 300 CRS. MAX.
POL Y BUSHES
-.-- /,/
r
CI
IV
L
L
til
"-'
c:
I-
Z
"-'
u
100 x 50 x 6 ALUM. ANGLE E l-
E ~
GANGWA Y BRACKET <> a
<> o:l
:e E
E
<>
->
->
1 LAYER OF SL-82 FABRIC
M16 SIS NUT -c I r
& WASHER L
I
I
TOP OF ROCK BA HER I
I
PLAN
SCALE 1:20
M16 x 400 SIS BOL TS 30 - 25 MPa CONCRETE
100 X 50 x 6 ALUM ANGLE
GANGWAY BRACKET~
15 COG DOWNf'\ '" r---
Jr I
600 -V-SL-82
/'l
FABRIC
50 Min. COVER
TOP OF ABUTMENT TO BE
cl--5f---- 250mm ABOVE HAT.
&- :~.
;y.~ •
'. ~
:z'
:>:
E
E
'.
<>
'''~'.,~., 'J' <>
•. . "". .i".. '"
~ N12 HORIZONT AL U-BARS
@l 300 CRS MAX.
ELEVA TlON
SCALE 1: 20
r~~UP.ERIOR' 28-04-14
No: DATE REVISION DATe PROlleT
A !LAS MARINE INTERNA TlONAl PROPOSED PONTOON AND GANGWAY CERTIFIED
TR"DIHG AS ORG.TIne ABUTMENT CONSTRUCTION DETAILS
SUPERIOR JETTIES 'y~ JettIes MARK WICHLINSKI
ORA WING NO: am PISCES APARTMENTS
CDPYRllitlT
"n"s
co 2014
I1o\I!INE INTERN" TlONAl PTY,lTO I1dil Address; P,D. Box 910 Nerang 4111 11363-004 .AOOReSS
7 PEZA CT ~;S:LTIN ~
RP~L,
NO PART OF JlofiO~EHT ",""Y liE COPIED,
REPRODUCED, STORED'" A IIElIII£VA8lE SYSTEI1
P1l: {,1Ism InO
NOOSA HEADS, QLD 4267
~~.. I A3
IN ANY fORI1, 011 TIIANSl1ITlED IIY AHY !'lEANS
Fu, {OllSS9.4l1n I.•:~L IrlLt N.AH",
WITHOUl PRIOR WIIITlEH PEIlItSSIOtl Of
"nAS ",""RfE INTERN..••TIONAl PlY,lTD [M: tJ'o~supK'iorfrff~uOfll ~::"T~;""J
A YKtu t1 r rflrt;tf ••/",,,,
I AS SHOWN I
Used in these records
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.