OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa Heads
SPL-OS14-009997
Our reference: SPL-QS14-Q09997
Your reference: 11363
Attachment 1-Conditions to be imposed
No. Conditions I Condition timing
Development Permit for Operational Works - Prescribed Tidal Works (Pontoon and
walkway)
Schedule 7. Table 2. Item 15. Maritime Safety matters - Pursuant to section 2550 of
the Sustainable Planning Act 2009. the chief executive administering the Sustainable
Planning Act 2009 nominates the Director-General of the Department of Transport
and Main Roads (Maritime Safety Queensland) to be the assessing authority for the
development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
1. The applicant must supply the Regional Harbour Master Within two weeks
with completed "As Constructed" drawings. of the completion
of the works.
The required information is to be forwarded to:
Regional Harbour Master
Maritime Safety Queensland
Macarthur Avenue East
Pinkenba. Qld • 4008
2. Development must be carried out generally in accordance Upon the
with the following plans. except as modified by these completion of
concurrence agency conditions: works and to be
maintained at all
# Title: Site plan. elevation & general notes. times
Author: Superior Jetties. Plan: 11363 - 001.
Date: 28/04/2014.
3. Any ship. dry berth or device (including Air Lifting At all times
Pontoons) berthed. moored or attached to the pontoon/
structure must
not exceed the following sizes:
# Wet berth - length overall: 12.0m; beam:
4.0m
# Maximum Vessel Mass - 11.000 Kg
4. No part of any structure or any ship berthed at the At all times
approved structure is to encroach within 1.5metres from
the side boundaries of the allocated water space as shown
on the water allocation plan NQ - 01.
5. The applicant must notify the Regional Harbour Master Notification to be
in writing of the commencement and completion of the given at least two
approved works. weeks prior to the
commencement
of the works
The required information is to be forwarded to:
and within two
Regional Harbour Master weeks after the
Maritime Safety Queensland completion of the
Macarthur Avenue East works.
Department of State Development, Infrastructure and Planning Page1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.