Council archive · source document
Attachment D - Endorsed GIA plans - OPW12 0095 02 · OPW12/0095.03
Plans and drawings: the text below has words only, no drawings.
M1717E5-R02 A Roadworks Details Plan, prepared by JFP 28 February
Consulting Engineers 2018
M1717E5-R03 G Roadworks Intersection Details Plan, 9 August 2021
prepared by JFP Consulting Engineers
M1717E5-R04 A Roadworks Longitudinal Sections 28 February
Swallow Street, prepared by JFP 2018
Consulting Engineers
M1717E5-R05 A Roadworks Cross Sections Swallow 28 February
Street, prepared by JFP Consulting 2018
Engineers
M1717E5-R06 B Roadworks Longitudinal Sections Blue 10 January
Gum Street, prepared by JFP Consulting 2020
Engineers
M1717E5-R07 A Roadworks Cross Sections Blue Gum 28 February
Street, prepared by JFP Consulting 2018
Engineers
M1717E5-R08 B Roadworks Sections Silver Gull 27 April 2018
Boulevard, prepared by JFP Consulting
Engineers
M1717E5-R09 A Roadworks Details, prepared by JFP 28 February
Consulting Engineers 2018
M1717E5-D02 D Drainage Layout Plan, prepared by JFP 4 June 2018
Consulting Engineers
M1717E5-D03 C Drainage Longitudinal Sections, prepared 4 June 2018
by JFP Consulting Engineers
3 OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available
on line at www.noosa.qld.gov.au or at Council offices.
Yours faithfully,
Mark Lewis
Coordinator - Engineering
Enc: Approved Plans
cc: Unitywater
Page 2 of 2
Document Set ID: 21599989
Version: 3, Version Date: 31/08/2021
[OCR of page images]
M1717E5-R02 A
Roadworks Details Plan, prepared by JFP
Consulting Engineers
28 February
2018
M1717E5-R03 G
Roadworks Intersection Details Plan,
prepared by JFP Consulting Engineers
9 August 2021
M1717E5-R04 A
Roadworks Longitudinal Sections
Swallow Street, prepared by JFP
Consulting Engineers
28 February
2018
M1717E5-R05 A
Roadworks Cross Sections Swallow
Street, prepared by JFP Consulting
Engineers
28 February
2018
M1717E5-R06 B
Roadworks Longitudinal Sections Blue
Gum Street, prepared by JFP Consulting
Engineers
10 January
2020
M1717E5-RO7 A
Roadworks Cross Sections Blue Gum
Street, prepared by JFP Consulting
Engineers
28 February
2018
M1717E5-R08 B
Roadworks Sections = Silver — Gull
Boulevard, prepared by JFP Consulting
Engineers
27 April 2018
M1717E5-RO09 A
Roadworks Details, prepared by JFP
Consulting Engineers
28 February
2018
M1717E5-D02 D
Drainage Layout Plan, prepared by JFP
Consulting Engineers
4 June 2018
M1717E5-D03 Cc
Drainage Longitudinal Sections, prepared
by JFP Consulting Engineers
4 June 2018
3 OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available
on line at www.noosa.qgid.gov.au or at Council offices.
Yours faithfully,
2
Mark Lewis
Coordinator - Engineering
Enc: Approved Plans
ce: Unitywater
Document Set ID: 21599989
Version: 3, Version Date: 31/08/2021
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Endorsed GIA plans - OPW12 0095 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 125 KB (small file)
- File type
No other editions are linked here.