Original source · versioned page text
2 Emerald SWMP 2213_Rev1
Attached to the e-mail MCU22/0062 - Response to Council Information Request.
Callaghan & Toth 1. INTRODUCTION The site subject to this report is at No.2 Emerald Street Cooroy. One existing house and shed on the lot has been removed to be replaced by a commercial building and carpark. The stormwater management assessment undertaken in this project considers the increase in impervious area of the lot due to the proposed commercial building and carpark. Then it determines which measures can be incorporated into the design to attenuate the resultant increase in runoff back to predevelopment levels. The existing dwelling catchment drains to Emerald Street. The existing dwelling site currently drains to Emerald Street as shown on Figure 1.1. the proposed new drainage system will replicate the existing catchment. An existing roof water outlet from an adjacent property will be incorporated into the interlot drainage system. 1.1 Response to Conditions of Approval TABLE 1.1: Response to Information Request NUMBER CONDITION RESPONSE 5.1 The design levels for the various structures Details shown on Figure 1.2 5.2 The discharge rates at the kerb and channel outlets. Details shown on Figure Please note that the maximum discharge at any one 1.2 location is 25l/sec 5.3 Clarification on the pipe type within the road reserve. Details shown on Figure Please note that the pipe type must be suitable for use in 1.2 the road reserve 5.4 Demonstrate that the proposed stormwater system will be Details shown on Figure able to convey the stormwater generated by the new 1.2 development on a 20% AEP event 5.5 RPEQ certification that the design is in accordance with Figure 1.1 & 1.2 the Noosa Plan and QUDM SWQMP plans attached are signed by RPEQ and are certified to be in accordance with The Noosa Plan and QUDM 2. DESCRIPTION The site is on a 1,012 m2 parcel of land which has frontage to both Emarald Street and Wimmers Lane. There is an existing underground drainage system with a kerb and a channel in Emerald Street. A property in Wimmers Lane discharges roof water onto the site. 3. FLOODING The existing house drains toward Emerald Street. The downpipes discharge into an existing kerb and channel in Emerald Street. Hafner 2213 SWMP_Rev1.docx July 2022 4 2213
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.