2 Emerald SWMP 2213_Rev1
Attached to the e-mail MCU22/0062 - Response to Council Information Request.
Callaghan & Toth 4. STORMWATER DESIGN AND ASSESSMENT 4.1 Proposed On-Site Stormwater Treatment Process The developed site was divided into Sub-Catchments as shown on Figure 1.1 and the detention system is listed below: 1. An Underground Rainwater Detention Tank will be required to collect water from all the roof area and carpark of the commercial building. A total of one (1) tank 8.73m long with a capacity of 7.4m3 will be provided for the new commercial building. The tank discharge to an overflow pipe discharging to the underground drainage system. The total tank capacity is to be 7,400 litres and is adequate for the approximate attenuation of runoff back to predevelopment concentrations for AEP1%, 10%, 50%. 2. The underground drainage system is designed to convey a 20% AEP event. An overland flow path has been provided to convey large events. 4.1.1 Rainfall Data The meteorological data used for the BOM IFD table for Cooroy was used for the runoff calculations 4.2 HYDROLOGY The site has been modelled using HydroCAD 10 to determine the detention capabilities of the rainwater tanks. The underground rainwater detention tanks adopted have been sized so that runoff concentrations are reduced back to predevelopment levels as shown in our calculations in Appendix 1. As the existing runoff and catchment extents to Emerald Street is not to be affected by this development, there will be no change to the capacity of drainage to Emerald Street. Hafner 2213 SWMP_Rev1.docx July 2022 8 2213
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.