SDAP Code Assessment · MCU18/0084

Attached to the e-mail Visitor Accommodation Type 3 Rural (6 cabins) - MCU18/0084.

of 24

Text shows just the words. Original shows the document exactly as it was published.

State code 1: Development in a state-controlled road environment

Table 1.2.1: Development in a state-controlled road environment
 Performance outcomes                                          Acceptable outcomes                                               Response
 Buildings and structures
 PO1 The location of buildings, structures, infrastructure,    AO1.1 Buildings, structures, infrastructure, services and         Complies
 services and utilities does not create a safety hazard in a   utilities are not located in a state-controlled road.             No buildings, structures, infrastructure, services or utilities
 state-controlled road, or cause damage to, or obstruct road   AND                                                               are located in a state-controlled road.
 transport infrastructure                                      AO1.2 Buildings, structures, infrastructure, services and         Complies
                                                               utilities can be maintained without requiring access to a         Buildings, structures, infrastructure, services or utilities can
                                                               state-controlled road.                                            be maintained without requiring access to a state-controlled
                                                                                                                                 road.
 PO2 The design and construction of Buildings and               AO2.1 Facades of buildings and structures facing a state-        Complies
 structures does not create a safety hazard by distracting      controlled road are made of non-reflective materials.            The building materials are non-reflective and buildings will
 users of a state-controlled road.                              OR                                                               be setback more than 280m from the state-controlled road.
                                                                AO2.2 Facades of buildings and structures do not reflect         Complies
                                                                point light sources into the face of oncoming traffic on a       The buildings will be setback 280m from the state-
                                                                state-controlled road.                                           controlled road.
                                                                AND
                                                                AO2.3 External lighting of buildings and structures is not       Complies
                                                                directed into the face of oncoming traffic on a state-           No external lighting proposed.
                                                                controlled road and does not involve flashing or laser lights.
                                                                AND
                                                                AO2.4 Advertising devices visible from a state-controlled        Not applicable
                                                                road are located and designed in accordance with the             No advertising devices proposed.
                                                                Roadside advertising guide, Department of Transport and
                                                                Main Roads, 2013.

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                      Page 1 of 24
Full text of the other 23 pages

Page 2

 Performance outcomes                                              Acceptable outcomes                                        Response

 PO3 Road, pedestrian and bikeway bridges over a state-            AO3.1 Road, pedestrian and bikeway bridges over a state-   Not applicable
 controlled road are designed and constructed to prevent           controlled road include throw protection screens in        No road, pedestrian or bikeway bridges proposed.
 projectiles from being thrown onto a state-controlled road.       accordance with section 4.9.3 of the Design criteria for
                                                                   bridges and other structures manual, Department of
                                                                   Transport and Main Roads, 2014.
 Filling, excavation and retaining structures
 PO4 Filling and excavation does not interfere with, or result     No acceptable outcome is prescribed.                       Not applicable
 in damage to, infrastructure or services in a state-controlled                                                               No filling or excavation proposed.
 road.

 Note: Information on the location of services and public
 utility plants in a state-controlled road can be obtained
 from the Dial Before You Dig service.

 Where development will impact on an existing or future
 service or public utility plant in a state-controlled road such
 that the service or public utility plant will need to be
 relocated, the alternative alignment must comply with the
 standards and design specifications of the relevant service
 or public utility provider, and any costs of relocation are to
 be borne by the developer.
 PO5 Filling, excavation, building foundations and retaining       No acceptable outcome is prescribed.                       Not applicable
 structures do not undermine, or cause subsidence of, a                                                                       No retaining walls, filling or excavation proposed.
 state-controlled road.


State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                   Page 2 of 24

Page 3

 Performance outcomes                                          Acceptable outcomes                                       Response
 Note: To demonstrate compliance with this performance
 outcome, it is recommended an RPEQ certified geotechnical
 assessment, prepared in accordance with Volume 3 of the
 Road Planning And Design Manual 2nd edition, Department
 of Transport and Main Roads, 2016, is provided.
 PO6 Filling, excavation, building foundations and retaining   No acceptable outcome is prescribed.                      Not applicable
 structures do not cause ground water disturbance in a                                                                   No retaining walls, filling or excavation proposed.
 state-controlled road.

 Note: To demonstrate compliance with this performance
 outcome, it is recommended an RPEQ certified geotechnical
 assessment, prepared in accordance with Volume 3 of the
                                       nd
 Road planning and design manual 2 edition, Department
 of Transport and Main Roads, 2016, is provided.
 PO7 Excavation, boring, piling, blasting or fill compaction   No acceptable outcome is prescribed.                      Not applicable
 during construction of a development does not result in                                                                 No filling or excavation proposed.
 ground movement or vibration impacts that would cause
 damage or nuisance to a state-controlled road, road
 transport infrastructure or road works.

 Note: To demonstrate compliance with this performance
 outcome, it is recommended an RPEQ certified geotechnical
 assessment, prepared in accordance with Volume 3 of the
                                      nd
 Road Planning And Design Manual 2 edition, Department
 of Transport and Main Roads, 2016, is provided.
 PO8 Development involving the haulage of fill, extracted     AO8.1 Fill, extracted material and spoil material is not   Not applicable
 material or excavated spoil material exceeding 10,000        transported to or from the development site on a state-    No filling or excavation proposed.
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                              Page 3 of 24

Page 4

 Performance outcomes                                            Acceptable outcomes                                           Response
 tonnes per year does not damage the pavement of a state-        controlled road.
 controlled road.

 Note: It is recommended a pavement impact assessment is
 provided in accordance with the Guide to Traffic Impact
 Assessment, Department of Transport and Main Roads,
 2017.
 PO9 Filling and excavation associated with the construction     No acceptable outcome is prescribed.                          Not applicable
 of vehicular access to a development does not compromise                                                                      No filling or excavation proposed.
 the operation or capacity of existing drainage infrastructure
 for a state-controlled road.
 PO10 Fill material used on a development site does not          AO10.1 Fill material is free of contaminants including acid   Not applicable
 result in contamination of a state-controlled road.             sulfate content.                                              No filling proposed.

                                                                 Note: Soils and rocks should be tested in accordance with
                                                                 AS 1289.0 – Methods of testing soils for engineering
                                                                 purposes and AS 4133.0-2005 – Methods of testing rocks
                                                                 for engineering purposes.
                                                                 AND
                                                                 AO10.2 Compaction of fill is carried out in accordance with   Not applicable
                                                                 the requirements of AS 1289.0 2000 – Methods of testing       No filling proposed.
                                                                 soils for engineering purposes.
 PO11 Filling and excavation does not cause wind-blown           AO11.1 Compaction of fill is carried out in accordance with   Not applicable
 dust nuisance in a state-controlled road.                       the requirements of AS 1289.0 2000 – Methods of testing       No filling proposed.
                                                                 soils for engineering purposes.
                                                                 AND

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                    Page 4 of 24

Page 5

 Performance outcomes                                          Acceptable outcomes                                             Response
                                                               AO11.2 Dust suppression measures are used during filling        Not applicable
                                                               and excavation activities such as wind breaks or barriers and   No filling or excavation proposed.
                                                               dampening of ground surfaces.
 Stormwater and drainage
 PO12 Development does not result in an actionable             No acceptable outcome is prescribed.                            Complies
 nuisance, or worsening of, stormwater, flooding or drainage                                                                   The proposed development will not discharge stormwater
 impacts in a state-controlled road.                                                                                           to the state controlled road.
 PO13 Run-off from the development site is not unlawfully      AO13.1 Development does not create any new points of            Complies
 discharged to a state-controlled road.                        discharge to a state-controlled road.                           No new points of discharge to the state controlled road are
                                                               AND                                                             proposed.
                                                               AO13.2 Stormwater run-off is discharged to a lawful point       Complies
                                                               of discharge.                                                   Any stormwater will be discharged to the waterways on site
                                                                                                                               and will not impact on the state controlled road.
                                                               Note: Section 3.4 of the Queensland Urban Drainage
                                                               Manual, Department of Energy and Water Supply, 2013,
                                                               provides further information on lawful points of discharge.
                                                               AND

                                                               AO13.3 Development does not worsen the condition of an          Complies
                                                               existing lawful point of discharge to the state-controlled      The proposed development will not discharge water to the
                                                               road.                                                           state controlled road.
 PO14 Run-off from the development site during                 AO14.1 Run-off from the development site during                 Complies
 construction does not cause siltation of stormwater           construction is not discharged to stormwater infrastructure     No stormwater will be discharged to the state controlled
 infrastructure affecting a state-controlled road.             for a state-controlled road.                                    road.

 Vehicular access to a state-controlled road

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                    Page 5 of 24

Page 6

 Performance outcomes                                           Acceptable outcomes                                               Response
 PO15 Vehicular access to a state-controlled road that is a     AO15.1 Development does not require new or changed                Complies
 limited access road is consistent with government policy for   access to a limited access road.                                  The existing access arrangements will be maintained.
 the management of limited access roads.
                                                                Note: Limited access roads are declared by the transport
                                                                chief executive under section 54 of the Transport
                                                                Infrastructure Act 1994 and are identified in the DA
                                                                mapping system.
                                                                OR
                                                                AO15.2 A new or changed access to a limited access road is        Not applicable
                                                                consistent with the limited access policy for the state-          No new access or changes to the access point are proposed.
                                                                controlled road.

                                                                Note: Limited access policies for limited access roads
                                                                declared under the Transport Infrastructure Act 1994 can be
                                                                obtained by contacting the relevant Department of
                                                                Transport and Main Roads regional office.
                                                                AND
                                                                AO15.3 Where a new or changed access is for a service             Not applicable
                                                                centre, access is consistent with the Service centre policy,
                                                                Department of Transport and Main Roads, 2013 and the
                                                                Access policy for roadside service centre facilities on limited
                                                                access roads, Department of Transport and Main Roads,
                                                                2013, and the Service centre strategy for the state-
                                                                controlled road.

                                                                Note: The Service centre policy, Department of Transport
                                                                and Main Roads, 2013, Access policy for roadside service
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                     Page 6 of 24

Page 7

 Performance outcomes                                           Acceptable outcomes                                            Response
                                                                centre facilities, Department of Transport and Main Roads,
                                                                2013 and the relevant Service centre strategy for a state-
                                                                controlled road can be accessed by contacting the relevant
                                                                Department of Transport and Main Roads regional office.
 PO16 The location and design of vehicular access to a state-   AO16.1 Vehicular access is provided from a local road.         Not applicable
 controlled road (including access to a limited access road)                                                                   The existing access will be maintained from Pomona Kin Kin
 does not create a safety hazard for users of a state-                                                                         Road.
 controlled road or result in a worsening of operating          OR all of the following acceptable outcomes apply:
 conditions on a state-controlled road.
                                                                AO16.2 Vehicular access for the development is consistent      Complies
 Note: Where a new or changed access between the                with the function and design of the state-controlled road.     Given the minor nature of the proposed development and
 premises and a state-controlled road is proposed, the          AND                                                            the relatively small amount of traffic it will generate it is
 Department of Transport and Main Roads will need to                                                                           considered to be consistent with the function and design of
 assess the proposal to determine if the vehicular access for                                                                  the state controlled road.
 the development is safe. An assessment can be made by          AO16.3 Development does not require new or changed             Complies
 Department of Transport and Main Roads as part of the          access between the premises and the state-controlled road.     No change to the exiting, long established, access to the
 development assessment process and a decision under                                                                           state controlled road is proposed.
 section 62 of Transport Infrastructure Act 1994 issued.        Note: A decision under section 62 of the Transport
                                                                Infrastructure Act 1994 outlines the approved conditions for
                                                                use of an existing vehicular access to a state-controlled
                                                                road. Current section 62 decisions can be obtained from the
                                                                relevant Department of Transport and Main Roads regional
                                                                office.
                                                                AND
                                                                AO16.4 Use of any existing vehicular access to the             The existing access is long established. It is considered that
                                                                development is consistent with a decision under section 62     the scale of traffic generated by the proposed use will not
                                                                of the Transport Infrastructure Act 1994.                      have an adverse impact on the safe operation of the state
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                    Page 7 of 24

Page 8

 Performance outcomes                                         Acceptable outcomes                                              Response
                                                                                                                               controlled road.
                                                              Note: The development which is the subject of the
                                                              application must be of an equivalent use and intensity for
                                                              which the section 62 approval was issued and the section 62
                                                              approval must have been granted no more than 5 years
                                                              prior to the lodgement of the application.
                                                              AND
                                                              AO16.5 Onsite vehicle circulation is designed to give priority   Complies
                                                              to entering vehicles at all times so vehicles do not queue in    The existing access allows for vehicles entering the property
                                                              a road intersection or on the state-controlled road.             to do so without queuing.
 PO17 Vehicular access to a state-controlled road or local    AO17.1 Vehicular access and associated road access works         Not applicable
 road (and associated road access works) are located and      are not located within 5 metres of existing public passenger
 designed to not damage or interfere with public passenger    transport infrastructure.
 transport infrastructure, public passenger services or       AND
 pedestrian or cycle access to public passenger transport     AO17.2 The location and design of vehicular access for a         Not applicable
 infrastructure and public passenger services.                development does not necessitate the relocation of existing
                                                              public passenger transport infrastructure.
                                                              AND
                                                              AO17.3 On-site vehicle circulation is designed to give           Not applicable
                                                              priority to entering vehicles at all times so vehicles using a
                                                              vehicular access do not obstruct public passenger transport
                                                              infrastructure and public passenger services or obstruct
                                                              pedestrian or cycle access to public passenger transport
                                                              infrastructure and public passenger services.
                                                              AND
                                                              AO17.4 The normal operation of public passenger transport        Not applicable

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                   Page 8 of 24

Page 9

 Performance outcomes                                         Acceptable outcomes                                              Response
                                                              infrastructure or public passenger services is not interrupted
                                                              during construction of the development.
 Vehicular access to local roads within 100 metres of an intersection with a state-controlled road
 PO18 The location and design of vehicular access to a local  AO18.1 Vehicular access is located as far as possible from       Not applicable
 road within 100 metres of an intersection with a state-      the state-controlled road intersection.
 controlled road does not create a safety hazard for users of AND
 a state-controlled road.                                     AO18.2 Vehicular access is in accordance with volume 3,          Not applicable
                                                              parts, 3, 4 and 4A of the Road Planning And Design Manual,
                                                              2nd edition, Department of Transport and Main Roads,
                                                              2016.
                                                              AND
                                                              AO18.3 Onsite vehicle circulation is designed to give priority   Not applicable
                                                              to entering vehicles at all times so vehicles do not queue in
                                                              the intersection or on the state-controlled road.
 Planned upgrades
 PO19 Development does not impede delivery of planned         AO19.1 Development is not located on land identified by          Not applicable
 upgrades of state-controlled roads.                          the Department of Transport and Main Roads as land
                                                              required for the planned upgrade of a state-controlled road.

                                                               Note: Land required for the planned upgrade of a state-
                                                               controlled road is identified in the DA mapping system.
                                                               OR
                                                               AO19.2 Development is sited and designed so that                Not applicable
                                                               permanent buildings, structures, infrastructure, services or
                                                               utilities are not located on land identified by the
                                                               Department of Transport and Main Roads as land required
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                Page 9 of 24

Page 10

 Performance outcomes                                         Acceptable outcomes                                              Response
                                                              for the planned upgrade of a state-controlled road.
                                                              OR all of the following acceptable outcomes apply:

                                                              AO19.3 Structures and infrastructure located on land
                                                              identified by the Department of Transport and Main Roads         Not applicable
                                                              as land required for the planned upgrade of a state-
                                                              controlled road are able to be readily relocated or removed
                                                              without materially affecting the viability or functionality of
                                                              the development.
                                                              AND
                                                              AO19.4 Vehicular access for the development is consistent        Not applicable
                                                              with the function and design of the planned upgrade of the
                                                              state-controlled road.
                                                              AND
                                                              AO19.5 Development does not involve filling and excavation       Not applicable
                                                              of, or material changes to, land required for a planned
                                                              upgrade to a state-controlled road.
                                                              AND
                                                              AO19.6 Land is able to be reinstated to the pre-                 Not applicable
                                                              development condition at the completion of the use.
 Network impacts
 PO20 Development does not result in a worsening of           No acceptable outcome is prescribed.                             Complies
 operating conditions on the state-controlled road network.                                                                    Minimal additional traffic will be generated by the proposal.
                                                                                                                               A traffic impact assessment is considered onerous given the
 Note: To demonstrate compliance with this performance                                                                         low traffic generation of the development.
 outcome, it is recommended that an RPEQ certified traffic

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                   Page 10 of 24

Page 11

 Performance outcomes                                         Acceptable outcomes                                         Response
 impact assessment is provided, prepared in accordance with
 the Guide to Traffic Impact Assessment, Department of
 Transport and Main Roads, 2017.
 PO21 Development does not impose traffic loadings on a       AO21.1 The layout and design of the development directs     Not applicable
 state-controlled road which could be accommodated on the     traffic generated by the development to the local road      There is no option to direct traffic to the local road network.
 local road network.                                          network.
 PO22 Upgrade works on, or associated with, a state-          AO22.1 Upgrade works required as a result of the            Not applicable
 controlled road are built in accordance with Queensland      development are designed and constructed in accordance      Given the minor nature of the proposal no upgrade works
                                                                                                           nd
 road design standards.                                       with the Road planning and design manual, 2 edition,        are considered necessary.
                                                              Department of Transport and Main Roads, 2016.

                                                              Note: Road works in a state-controlled road require
                                                              approval under section 33 of the Transport Infrastructure
                                                              Act 1994 before the works commence.




State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                               Page 11 of 24

Page 12

Table 1.2.2: Environmental emissions
 Performance outcomes                                           Acceptable outcomes                                           Response
 Noise
 Accommodation activities
 PO23 Development involving an accommodation activity or        AO23.1 A noise barrier or earth mound is provided which is    Not applicable
 land for a future accommodation activity minimises noise       designed, sited and constructed:                              The proposed cabins are setback more than 280m from the
 intrusion from a state-controlled road or type 1 multi-modal       1. to meet the following external noise criteria at all   state controlled road. Given the setback distance it is
 corridor in habitable rooms.                                          facades of the building envelope:                      considered that a noise barrier or earth mound is not
                                                                                                                              required to provide acoustic attenuation for road traffic
                                                                                           a.   ≤ 60 dB(A) L10 (18 hour)      noise.
                                                                                                façade corrected (measured
                                                                                                L90 (8 hour) free field
                                                                                                between 10pm and 6am
                                                                                                ≤ 40 dB(A))
                                                                                           b.   ≤ 63 dB(A) L10 (18 hour)
                                                                                                façade corrected (measured
                                                                                                L90 (8 hour) free field
                                                                                                between 10pm and 6am
                                                                                                > 40 dB(A))
                                                                   2.   in accordance with chapter 7 integrated noise
                                                                        barrier design of the Transport Noise Management
                                                                        Code of Practice – Volume 1 Road Traffic Noise,
                                                                        Department of Transport and Main Roads, 2013.

                                                                Note: To demonstrate compliance with the acceptable
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                Page 12 of 24

Page 13

 Performance outcomes                                         Acceptable outcomes                                            Response
                                                              outcome, it is recommended that a RPEQ certified noise
                                                              assessment report is provided, prepared in accordance with
                                                              the State Development Assessment Provisions Supporting
                                                              Information – Community Amenity (Noise), Department of
                                                              Transport and Main Roads, 2013.

                                                              If the building envelope is unknown, the deemed-to-comply
                                                              setback distances for buildings stipulated by the local
                                                              planning instrument or relevant building regulations should
                                                              be used.

                                                              In some instances the design of noise barriers and mounds
                                                              to achieve the noise criteria above the ground floor may not
                                                              be reasonable or practicable. In these instances, any
                                                              relaxation of the criteria is at the discretion of the
                                                              Department of Transport and Main Roads.
                                                              OR all of the following acceptable outcomes apply:

                                                              AO23.2 Buildings which include a habitable room are            Complies
                                                              setback the maximum distance possible from a state-            Sufficient setbacks are provided to the state-controlled road
                                                              controlled road or type 1 multi-modal corridor.                to ensure that traffic noise from Pomona Kin Kin Road will
                                                              AND                                                            not have an adverse impact on the amenity of visitors using
                                                                                                                             the cabins.
                                                              AO23.3 Buildings are designed and oriented so that             Not applicable
                                                              habitable rooms are located furthest from a state-controlled   Sufficient setbacks are provided to the state-controlled
                                                              road or type 1 multi-modal corridor.                           road.
                                                              AND
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                 Page 13 of 24

Page 14

 Performance outcomes                                         Acceptable outcomes                                            Response
                                                              AO23.4 Buildings (other than a relevant residential building   Not applicable
                                                              or relocated building) are designed and constructed using      Sufficient setbacks are provided to the state-controlled road
                                                              materials which ensure that habitable rooms meet the           to mitigate any potential noise impact from traffic using
                                                              following internal noise criteria:                             Pomona Kin Kin Road. .
                                                                   1. ≤ 35 dB(A) Leq (1 hour) (maximum hour over 24
                                                                       hours).

                                                              Statutory note: Noise levels from a state-controlled road or
                                                              type 1 multi-modal corridor are to be measured in
                                                              accordance with AS1055.1–1997 Acoustics – Description and
                                                              measurement of environmental noise.

                                                              Note: To demonstrate compliance with the acceptable
                                                              outcome, it is recommended that a RPEQ certified noise
                                                              assessment report is provided, prepared in accordance with
                                                              the State Development Assessment Provisions Supporting
                                                              Information – Community Amenity (Noise), Department of
                                                              Transport and Main Roads, 2013.
                                                              Habitable rooms of relevant residential buildings located
                                                              within a transport noise corridor must comply with the
                                                              Queensland Development Code MP4.4 Buildings in a
                                                              transport noise corridor, Queensland Government, 2015.
                                                              Transport noise corridors are mapped on the DA mapping
                                                              system.
 PO24 Development involving an accommodation activity or      AO24.1 A noise barrier or earth mound is provided which is     Not applicable
 land for a future accommodation activity minimises noise     designed, sited and constructed:                               The proposed cabins are setback more than 280m from the
 intrusion from a state-controlled road or type 1 multi-modal     1. to meet the following external noise criteria in        state controlled road. Given the setback distance it is
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                 Page 14 of 24

Page 15

 Performance outcomes                                         Acceptable outcomes                                             Response
 corridor in outdoor spaces for passive recreation.                  outdoor spaces for passive recreation:                   considered that a noise barrier or earth mound is not
                                                                                                                              required to provide acoustic attenuation for road traffic
                                                                                         a.   ≤ 57 dB(A) L10 (18 hour) free   noise.
                                                                                              field (measured L90 (18 hour)
                                                                                              free field between 6am and
                                                                                              12 midnight ≤ 45 dB(A))
                                                                                         b.   ≤ 60 dB(A) L10 (18 hour) free
                                                                                              field (measured L90 (18 hour)
                                                                                              free field between 6am and
                                                                                              12 midnight > 45 dB(A))
                                                                   2.   in accordance with chapter 7 integrated noise
                                                                        barrier design of the Transport Noise Management
                                                                        Code of Practice – Volume 1 Road Traffic Noise,
                                                                        Department of Transport and Main Roads, 2013.

                                                              Note: To demonstrate compliance with the acceptable
                                                              outcome, it is recommended that a RPEQ certified noise
                                                              assessment report is provided, prepared in accordance with
                                                              the State Development Assessment Provisions Supporting
                                                              Information – Community Amenity (Noise), Department of
                                                              Transport and Main Roads, 2013.
                                                              OR



State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                  Page 15 of 24

Page 16

 Performance outcomes                                         Acceptable outcomes                                            Response
                                                              AO24.2 Each dwelling has access to an outdoor space for        Complies
                                                              passive recreation which is shielded from a state-controlled   The setbacks to the state controlled road will provide
                                                              road or type 1 multi-modal corridor by a building, solid       sufficient separation between the amenity areas and any
                                                              gap-free fence, or other solid gap-free structure.             potential road traffic noise to avoid the need for further
                                                              AND                                                            mitigation measures. .


                                                              AO24.3 Each dwelling with a balcony directly exposed to        Complies
                                                              noise from a state-controlled road or type 1 multi-modal       As above.
                                                              corridor has a continuous solid gap-free balustrade (other
                                                              than gaps required for drainage purposes to comply with
                                                              the Building Code of Australia).
 Child care centres
 PO25 Development involving a:                                AO25.1 A noise barrier or earth mound is provided which is     Not applicable
                                                              designed, sited and constructed:
          1.   child care centre; or                              1. to meet the following external noise criteria at all
          2.   educational establishment                             facades of the building envelope:
                                                                                         a.   ≤ 58 dB(A) L10 (1 hour)
 minimises noise intrusion from a state-controlled road or
 type 1 multi-modal corridor in indoor education areas and                                    façade corrected (maximum
 indoor play areas.                                                                           hour during normal opening
                                                                                              hours)
                                                                   2.   in accordance with chapter 7 integrated noise
                                                                        barrier design of the Transport Noise Management
                                                                        Code of Practice – Volume 1 Road Traffic Noise,
                                                                        Department of Transport and Main Roads, 2013.
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                 Page 16 of 24

Page 17

 Performance outcomes                                         Acceptable outcomes                                           Response

                                                              Note: To demonstrate compliance with the acceptable
                                                              outcome, it is recommended that a RPEQ certified noise
                                                              assessment report is provided, prepared in accordance with
                                                              the State Development Assessment Provisions Supporting
                                                              Information – Community Amenity (Noise), Department of
                                                              Transport and Main Roads, 2013.

                                                              If the building envelope is unknown, the deemed-to-comply
                                                              setback distances for buildings stipulated by the local
                                                              planning instrument or relevant building regulations should
                                                              be used.
                                                              OR all of the following acceptable outcomes apply:

                                                              AO25.2 Buildings which include indoor education areas and
                                                              indoor play areas are setback the maximum distance            Not applicable
                                                              possible from a state-controlled road or type 1 multi-modal
                                                              corridor.
                                                              AND
                                                              AO25.3 Buildings are designed and oriented so that indoor     Not applicable
                                                              education areas and indoor play areas are located furthest
                                                              from the state-controlled road or type 1 multi-modal
                                                              corridor.
                                                              AND
                                                              AO25.4 Buildings are designed and constructed using           Not applicable
                                                              materials which ensure indoor education areas and indoor
                                                              play areas meet the following internal noise criteria:
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                             Page 17 of 24

Page 18

 Performance outcomes                                         Acceptable outcomes                                             Response
                                                                 1. ≤ 35 dB(A) Leq (1 hour) (maximum hour during
                                                                     opening hours).

                                                              Statutory note: Noise levels from a state-controlled road or
                                                              type 1 multi-modal corridor are to be measured in
                                                              accordance with AS1055.1–1997 Acoustics – Description and
                                                              measurement of environmental noise.

                                                              Note: To demonstrate compliance with the acceptable
                                                              outcome, it is recommended that a RPEQ certified noise
                                                              assessment report, prepared in accordance with the State
                                                              Development Assessment Provisions Supporting
                                                              Information – Community Amenity (Noise), Department of
                                                              Transport and Main Roads, 2013, is provided.
 PO26 Development involving a:                                AO26.1 A noise barrier or earth mound is provided which is      Not applicable
     1. child care centre; or                                 designed, sited and constructed:
     2. educational establishment                                 1. to meet the following external noise criteria in each
 minimises noise intrusion from a state-controlled road or            outdoor education area or outdoor play area:
 type 1 multi-modal corridor in outdoor education areas and
 outdoor play areas.                                                                     a.   ≤ 63 dB(A) L10 (12 hour) free
                                                                                              field (between 6am and
                                                                                              6pm)
                                                                   2.   in accordance with chapter 7 integrated noise
                                                                        barrier design of the Transport Noise Management
                                                                        Code of Practice – Volume 1 Road Traffic Noise,
                                                                        Department of Transport and Main Roads, 2013.
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                               Page 18 of 24

Page 19

 Performance outcomes                                           Acceptable outcomes                                            Response

                                                                Note: To demonstrate compliance with the acceptable
                                                                outcome, it is recommended that a RPEQ certified noise
                                                                assessment report is provided, prepared in accordance with
                                                                the State Development Assessment Provisions Supporting
                                                                Information – Community Amenity (Noise), Department of
                                                                Transport and Main Roads, 2013.
                                                                OR
                                                                AO26.2 Each outdoor education area and outdoor play area       Not applicable
                                                                is shielded from noise generated from a state-controlled
                                                                road or type 1 multi-modal corridor by a building, solid
                                                                gap-free fence, or other solid gap-free structure.
 Hospitals
 PO27 Development involving a hospital minimises noise          AO27.1 Hospitals are designed and constructed using            Not applicable
 intrusion from a state-controlled road or type 1 multi-modal   materials which ensure patient care areas meet the
 corridor in patient care areas.                                following internal noise criteria:
                                                                     1. ≤ 35 dB(A) Leq (1 hour) (maximum hour during
                                                                        opening hours).

                                                                Statutory note: Noise levels from a state-controlled road or
                                                                type 1 multi-modal corridor are to be measured in
                                                                accordance with AS1055.1–1997 Acoustics – Description and
                                                                measurement of environmental noise.

                                                                Note: To demonstrate compliance with the acceptable
                                                                outcome, it is recommended that a RPEQ certified noise
                                                                assessment report is provided, prepared in accordance with
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                Page 19 of 24

Page 20

 Performance outcomes                                           Acceptable outcomes                                            Response
                                                                the State Development Assessment Provisions Supporting
                                                                Information – Community Amenity (Noise), Department of
                                                                Transport and Main Roads, 2013.
 Vibration
 Hospitals
 PO28 Development involving a hospital minimises vibration      AO28.1 Hospitals are designed and constructed to ensure        Not applicable
 impacts from vehicles using a state-controlled road or         vibration in the treatment area of a patient care area does
                                                                                                              1.75
 type 1 multi-modal corridor in patient care areas.             not exceed a vibration dose value of 0.1m/s .
                                                                AND
                                                                AO28.2 Hospitals are designed and constructed to ensure        Not applicable
                                                                vibration in the ward area of a patient care area does not
                                                                                                         1.75
                                                                exceed a vibration dose value of 0.4m/s .

                                                                Note: To demonstrate compliance with the acceptable
                                                                outcome, it is recommended that a RPEQ certified vibration
                                                                assessment report is provided.
 Air and light
 PO29 Development involving an accommodation activity           AO29.1 Each dwelling has access to an outdoor space for        Complies
 minimises air quality impacts from a state-controlled road     passive recreation which is shielded from a state-controlled   Farming experiences are proposed on the site for visitors.
 or type 1 multi-modal corridor in outdoor spaces for passive   road or type 1 multi-modal corridor by a building, solid
 recreation.                                                    gap-free fence, or other solid gap-free structure.
 PO30 Development involving a:                                  AO30.1 Each outdoor education area and outdoor play area       Not applicable
     1. child care centre; or                                   is shielded from a state-controlled road or type 1 multi-
     2. educational establishment                               modal corridor by a building, solid gap-free fence, or other
 minimises air quality impacts from a state-controlled road     solid gap-free structure.
 or type 1 multi-modal corridor in outdoor education areas
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                   Page 20 of 24

Page 21

 Performance outcomes                                           Acceptable outcomes                                                Response
 and outdoor play areas.
 PO31 Development involving an accommodation activity           AO31.1 Buildings for an accommodation activity or hospital         Complies
 or hospital minimises lighting impacts from a state-           are designed to minimise the number of windows or                  Minimal windows are provided to buildings which address
 controlled road or type 1 multi-modal corridor.                transparent/translucent panels facing a state-controlled road or   the state-controlled road and the nearest building is setback
                                                                type 1 multi-modal corridor.                                       285m from the road.
                                                                OR

                                                                AO31.2 Windows facing a state-controlled road or type 1            Not applicable
                                                                multi-modal corridor include treatments to block light from
                                                                a state-controlled road or type 1 multi-modal corridor.


Table 1.2.3: Development in a future state-controlled road environment
 Performance outcomes                                            Acceptable outcomes                                               Response
 PO32 Development does not impede delivery of a future           AO32.1 Development is not located in a future state-              Not applicable
 state-controlled road.                                          controlled road.
                                                                 OR



                                                                AO32.2 Development is sited and designed so that                   Not applicable
                                                                permanent buildings, structures, infrastructure, services or
                                                                utilities are not located in a future state-controlled road.




State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                                       Page 21 of 24

Page 22

 Performance outcomes                                            Acceptable outcomes                                           Response
                                                                 OR all of the following acceptable outcomes apply:

                                                                 AO32.3 Structures and infrastructure located in a future
                                                                 state-controlled road are able to be readily relocated or     Not applicable
                                                                 removed without materially affecting the viability or
                                                                 functionality of the development.
                                                                 AND
                                                                 AO32.4 Development does not involve filling and excavation    Not applicable
                                                                 of, or material changes to, a future state-controlled road.
                                                                 AND
                                                                 AO32.5 Land is able to be reinstated to the pre-              Not applicable
                                                                 development condition at the completion of the use.
 PO33 Vehicular access to a future state-controlled road is      AO33.1 Development does not require new or changed            Not applicable
 located and designed to not create a safety hazard for users    access between the premises and a future state-controlled
 of a future state-controlled road or result in a worsening of   road.
 operating conditions on a future state-controlled road.         AND
                                                                 AO33.2 Vehicular access for the development is consistent     Not applicable
 Note: Where a new or changed access between the                 with the function and design of the future state-controlled
 premises and a future state-controlled road is proposed, the    road.
 Department of Transport and Main Roads will need to
 assess the proposal to determine if the vehicular access for
 the development is safe. An assessment can be made by
 Department of Transport and Main Roads as part of the
 development assessment process and a decision under
 section 62 of Transport Infrastructure Act 1994 issued.
 PO34 Filling, excavation, building foundations and retaining No acceptable outcome is prescribed.                             Not applicable
 structures do not undermine, or cause subsidence of, a
State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                                Page 22 of 24

Page 23

 Performance outcomes                                           Acceptable outcomes                                           Response
 future state-controlled road.

 Note: To demonstrate compliance with this performance
 outcome, it is recommended that an RPEQ certified
 geotechnical assessment is provided, prepared in
 accordance with volume 3 of the Road planning and design
 manual, 2nd edition, Department of Transport and Main
 Roads, 2016.
 PO35 Fill material from a development site does not result     AO35.1 Fill material is free of contaminants including acid   Not applicable
 in contamination of land for a future state-controlled road.   sulfate content.

                                                                Note: Soil and rocks should be tested in accordance with
                                                                AS1289 – Methods of testing soils for engineering purposes
                                                                and AS4133 2005 – Methods of testing rocks for
                                                                engineering purposes.
                                                                AND
                                                                AO35.2 Compaction of fill is carried out in accordance with   Not applicable
                                                                the requirements of AS1289.0 2000 – Methods of testing
                                                                soils for engineering purposes.
 PO36 Development does not result in an actionable              No acceptable outcome is prescribed.                          Not applicable
 nuisance, or worsening of, stormwater, flooding or drainage
 impacts in a future state-controlled road.
 PO37 Run-off from the development site is not unlawfully       AO37.1 Development does not create any new points of          Not applicable
 discharged to a future state-controlled road.                  discharge to a future state-controlled road.
                                                                AND
                                                                AO37.2 Stormwater run-off is discharged to a lawful point     Not applicable

State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                               Page 23 of 24

Page 24

 Performance outcomes                                         Acceptable outcomes                                           Response
                                                              of discharge.

                                                              Note: Section 3.4 of the Queensland Urban Drainage
                                                              Manual, Department of Energy and Water Supply, 2013,
                                                              provides further information on lawful points of discharge.
                                                              AND
                                                              AO37.3 Development does not worsen the condition of an        Not applicable
                                                              existing lawful point of discharge to the future state-
                                                              controlled road.




State Development Assessment Provisions – version 2.1
State code 1: Development in a state-controlled road environment                                                                             Page 24 of 24

Used in these records

About this file

File size
278 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SDAP Code Assessment.pdf · 278 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗