Council archive · source document
00156EF0.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Item 1. — Volume of fill
Site area - 675m2
Existing site - 1.50 AHD (average) |
Required AHD site building platform - 2.25 AHD
Required FFL - 2.50 AHD
Fill volume - 675m2 x 0.75 Deep = 506.25m3
Front batter volume reduction — (23.738 x 6.00 ‘setback’) / 2 = 71.214m3
Total fill volume — 506.25m3 — 71.214m3 = 435.036m3 -
Item 2. — Roof plan and Overhangs
a) Roof plan showing roof pitch — As attached plan ‘A’
b) Overhangs to 75% of the dwelling — As attached plan “B’
Calculation — Total perimeter of house walls = 102.016 lin mtrs
Lineal meters of house wall not under eaves = (29.645) lin mtrs
Less (increase garage overhang to 600mm) = _6.910 lin mtrs
Perimeter under eaves = 79.281 lin mtrs
Total % overhang = (79.281 divide 102.016) x 100 = 77.714%
Item 3. - Preliminary storm water drainage plan and final surface levels
Storm water drainage plan - as per attached plan ‘C’ |
Surface water levels — as per attached plan ‘D’
Item 4. - Location of sewer line and zone of influence impact
We have visited the site and determined the location of the manhole on lot 10 as being 4.45
meters from the rear boundary of lot 9 and 2.10 meters deep.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00156EF0.001.pdfRelated documentPublic source context ↗
07/0763 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.