Original source · versioned page text
18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 19, section 7. The text section number identifies this passage in the reader.
9.9
WORKS TO BE SET OUT ACCURATELY. THE ENGINEER SHALL
.20
9.9
9.9
9.9
175 SLAB
9.9
9.9
9.9
9.9
S.J.
S
120
RT1
11
Fall Fall Fall Fall Fall Fall Fall Fall
11
11
11
BE GIVEN THE OPPORTUNITY TO CONFIRM SUCH SETOUT
5
5
5
5
1.8
.47
m
SL92 Mesh BEFORE CONSTRUCTION COMMENCES.
S.J.
120.35 40 Top Cover
SW
BASIN S.L. - 117.80 BASIN S.L. - 118.40 BASIN S.L. - 119.00 F'c = N32
T
450mm sq Pit
1.5m
RT2
with D-Class Grate
S.L. - 119.86
RT2 450mm sq Pit 450mm sq Pit 450mm sq Pit
SW
SITE BM
SW
SW
with D-Class Grate with D-Class Grate with D-Class Grate PM 19089
S
T
S.L. - 119.86 S.L. - 119.86 S.L. - 119.86 SW R.L. - 120.402
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
SW
Issue Made By Date Description PROPOSED COMMERCIAL DEVELOPMENT Scale : 1:200 AT A1 NOTES:
0 PC 06/07/18 Preliminary ONLY - for DA Approval
at NO. 5 TAYLOR COURT, COOROY
REVISION
A PC 06/07/18 Issue for BA Job No.: 18-0165 1. Do not scale drawings.
2. Scale is correct at A1.
B PC 19/10/18 SW tanks changed to blockwork CLIENT: HASS HOLDINGS PTY LTD
Dwg No.: C02 3. Check and verify all dimensions
C PC O6/11/18 Bio-basins updated Designed By : B.J. WINNING BEngTech (Civil) Drawn By : PC Date : 29/05/18 prior to commencement of work.
D BJW O7/11/18 General amendments Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER Date : 11/09/18 Ph: (07) 5444 5578 Email: [email protected] DRIVEWAY DETAILS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.