18-0165B Stormwater Management Report_Issue D

Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 20, section 2. The text section number identifies this passage in the reader.

batter.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        5.     All right angle subsoil pipe bends are to be created using 2x 45°                or approved equivalent for the duration of construction.
                                                                                                                                                                                                            OUTLET 9/1                               Existing Stormwater Pit                                  1 in 2 batter.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SW
                                                                                                                                                                                                                                                     to be removed.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      bends.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              SW
                                                                               Proposed bio-retention basin to
                                                                               accept stormwater discharge from
                                                                               all building roofs, majority hardstands

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SW
                                                                                                                                                                                                                       SW




                                                                               and landscape areas. Refer detail on C04.                                                                                                                  PIT 3/4                              450Ø RCP at 1.5% below bio-basin.                100Ø slotted underdrain collector         PIT 2/4                                                             Sandstone retaining wall.                       PIT 1/4                                                                                                                                                          SW
                                                                               Total surface area = 250m2                                                                                                                                                                      Not shown for clarity. Refer bio-basin           pipes with slotted pipe clean-out
                                                                                                                                                                                                                                                                                                                                                                                                                                              Typical along stepped
                                                                               Filter media Area - 120m2                                                                                                                                                                       details.                                         risers (capped) at ends. Typical.                                                                                                                                                                                                                                                                        SW
                                                                                                                                                                                                                                                                                                                                                                                                                                              bio-retention basin.
                                                                                                                                                                      900Ø                  I.L. - T.B.C.                                                                                                                                                                                                                                                                                     SW               SW                         SW                                   SW                              SW
                                                                                                                                                            SW                              SW                              SW                SW                      SW                  SW                    SW                  SW                SW                      SW                  SW                   SW                  SW                  SW
                                                                                                                                                                                                                                                                                                                                                                                                 450Ø RCP at 1.5% below bio-basin.
                                                                                                                                                                                                                                                                                                                                                                                                 Not shown for clarity. Refer bio-basin
                                                                                                                                                                      EXISTING PIT 4/4                                                                                                                                                                                                           details.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Issue    Made By    Date        Description                                                                            PROPOSED COMMERCIAL DEVELOPMENT                                                                                                                                                                                                  Scale : 1:200 AT A1                                               NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      0        PC         06/07/18    Preliminary ONLY - for DA Approval
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             at NO. 5 TAYLOR COURT, COOROY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           REVISION




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      A        PC         06/07/18    Issue for BA                                                                                                                                                                                                                                                                                                            Job No.: 18-0165                                                  1. Do not scale drawings.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                2. Scale is correct at A1.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      B        PC         19/10/18    SW tanks changed to blockwork                                                          CLIENT: HASS HOLDINGS PTY LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Dwg No.: C03                                                      3. Check and verify all dimensions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      C        BJW        O6/11/18    Bio-basins updated                                                                     Designed By : B.J. WINNING BEngTech (Civil)                        Drawn By : PC                  Date : 29/05/18                                                                                                                                                                                    prior to commencement of work.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      D        BJW        O7/11/18    General amendments                                                                     Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER                               Date : 11/09/18                              Ph: (07) 5444 5578    Email: [email protected]                       STORMWATER DRAINAGE
Log in to download the original file

18-0165B Stormwater Management Report_Issue D.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.