Original source · versioned page text
18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 27, section 1. The text section number identifies this passage in the reader.
Proposed Industrial C
F.F.L. - 121.400m
Proposed Industrial B
F.F.L. - 120.950m
Proposed Industrial A
F.F.L. - 120.500m
Issue Made By Date Description PROPOSED COMMERCIAL DEVELOPMENT Scale : 1:200 AT A1 NOTES:
0 PC 06/07/18 Preliminary ONLY - for DA Approval
at NO. 5 TAYLOR COURT, COOROY
REVISION
A PC 06/07/18 Issue for BA Job No.: 18-0165 1. Do not scale drawings.
2. Scale is correct at A1.
B PC 19/10/18 No changes to sheet. Re-issue CLIENT: HASS HOLDINGS PTY LTD
Dwg No.: C10 3. Check and verify all dimensions
C PC O6/11/18 No changes to sheet. Re-issue Designed By : B.J. WINNING BEngTech (Civil) Drawn By : PC Date : 29/05/18 prior to commencement of work.
D BJW O7/11/18 No changes to sheet. Re-issue Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER Date : 11/09/18 Ph: (07) 5444 5578 Email: [email protected] AV TURNING PATHS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.