Original source · versioned page text
2017-08-17 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 17 AUGUST 2017 GENERAL COMMITTEE RECOMMENDATIONS 14 AUGUST 2017 – Crs. Frank Wilkie (Chair), Ingrid Jackson, Joe Jurisevic, Frank Pardon, Brian Stockwell and Tony Wellington. Apology: Cr Glasgow 1 MCU17/0028, OPW17/0120 & REC17/0012 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING TYPE 1, RECONFIGURE A LOT (1 LOT INTO 2 LOTS) AND OPERATIONAL WORKS (ENGINEERING WORKS) 23 TEWANTIN ROAD COOROY That Council note the report by the Coordinator Planning to the Planning & Environment Committee Meeting dated 8 August 2017 regarding Application No. MCU17/0028, OPW17/0120 and REC17/0012 for a Development Permit for Material Change of use of Premises Multiple Housing Type 1 – Duplex, Operational Works (Engineering Works) and Reconfigure a Lot 1 Lot into 2 Lots situated at 23 Tewantin Road, Cooroy described Lot 102 C5604 and approve the application in accordance with the following conditions: MATERIAL CHANGE OF USE Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date T42S1 Site Plan 15.03.2017 T42E1 Elevations - Existing house 15.03.2017 1 of 6 Site Plan drawn by Ausmar 13.03.2017 2 of 6 Ground Floor drawn by Ausmar 13.03.2017 3 of 6 Elevations drawn by Ausmar 13.03.2017 4 of 6 Elevations drawn by Ausmar 13.03.2017 Dedication 2. Prior to the commencement of the use a two (2.0) metre wide strip extending across the full length of the frontage to Olivine Lane is to be dedicated to Council as ‘Road’. Roof pitch and eaves 3. The roof of the new dwelling must have a roof pitch of no less than 12 degrees and have minimum 600mm eaves to at least 75% of the perimeter of the building. Landscaping 4. The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan for that specific area. 5. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. 6. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Page 10 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.