ORDINARY MEETING AGENDA                                                         17 AUGUST 2017


    17.   The development must be constructed so as not to concentrate or redirect
          stormwater runoff onto neighbouring properties.
          Electricity and Telecommunication Services
    18.   Reticulated electricity and telecommunication services must be provided to each lot in
          accordance with the standards and requirements of the relevant service provider.
    19.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    20.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
          Easements
    21.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    22.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    23.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
          Earthworks and Retaining Walls
    24.   All fill and associated batters must be contained entirely within the subject site unless
          written permission from the respective landowner(s) is provided to Council. All
          earthworks must be undertaken in accordance with the provisions of Australian
          Standard AS3798: Guidelines on Earthworks for Commercial and Residential
          Developments.
    25.   Where the development involves excavation or filling over, or adjacent to, drainage,
          water supply or sewerage infrastructure, all access chamber surface levels must be
          adjusted to provide a freeboard of 100mm above the finished ground surface level.
    26.   All retaining walls must be designed and constructed in accordance with the planning
          scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
          retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
          with a commercial grade safety fence.
          Damage to Services and Assets
    27.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the
                development.
          Any repair work which proposes to alter the alignment or level of existing services
          and assets must first be referred to the relevant service authority for approval.




                                                                                    Page 12 of 89
Log in to download the original file

2017-08-17 Ordinary Meeting Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.