Skip to the record
Search everything, all in one place.

Original source · versioned page text

2017-08-17 Ordinary Meeting Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                    17 AUGUST 2017


              a.   The built form presentation of the commercial building and undercroft car
                   parking area to Doonella Street must maintain the 3 building forms, but
                   the façade treatments must be amended to reflect and complement the
                   heritage character of the locality by incorporating materials, finishes and
                   colours consistent with the Tewantin domestic vernacular. The façade
                   treatment of the 3 building forms must also complement and be
                   compatible with each other.;
              b.   The eastern and western elevations of the residential building must be
                   provided with roof overhangs that are a minimum 600mm wide, with
                   sunhoods provided to lower storey windows; and
              c.   The full extent of the walkway adjacent to the western elevation of the
                   residential building must be covered with an awning or the like. The
                   device must be situated at least 2.40 metres above the height of the
                   walkway.
              Amended plans demonstrating compliance with this condition must be lodged
              with Council prior to issue of a Development Permit for Operational Works.
        4.    Additional details of the proposed finished ground levels and treatment to
              boundaries must be lodged with Council prior to issue of a development permit
              for operational works. These additional details must demonstrate that the
              basement and car parking areas are appropriately screened and landscaped to
              the adjoining properties.
        Building Height
        5.    The maximum height of the development must not exceed 8 metres above the
              natural ground level and finished ground level (with the exception of the
              driveway entrance to the basement carpark and refuse store area).
        6.    Certification must be submitted to Council from a Licensed Surveyor which
              certifies that the building does not exceed the maximum height requirement of
              this Decision Notice.
        Performance Bond
        7.    Security in the form of a cash bond or trading bank guarantee to the sum of
              $20,000 must be submitted to Council, to secure performance of all conditions
              of this approval, prior to the site pre-start meeting. The cash bond or trading
              bank guarantee will be returned on performance of the conditions of approval
              less any costs incurred by Council in respect of enforcing performance of this
              permit. Council reserves the right to call upon the bond or guaranteed sum to
              effect compliance with conditions.
        Street Identification
        8.    The street address of the development must be clearly visible and discernible
              from the primary frontage of the site by the provision of a street number and,
              where appropriate, the building name.
        Water & Sewer Connections
        9.    An underground connection to reticulated water and sewerage must be
              provided to the development site in accordance with the standards and
              requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
        10.   A Certificate of Completion from the Northern SEQ Distributor–Retailer
              Authority (Unitywater) must be submitted to Council that certifies an
              underground connection to reticulated water and sewerage has been provided
              to the development site.


                                                                               Page 21 of 89
Log in to download the original file

2017-08-17 Ordinary Meeting Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.