NOOSA Checklist - Applications Involving Land
ns Development & Land Use Sections
{DAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

4... APPLICATION FORMS ~ : = se eo ed
1.1 Form PartA
1.1.1 Ensure that the form is fully completed.

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1. If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No. or Company Sea! required.
1.2. Form1 Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]

4.1,2.1. Ensure that each of Forms B-O which are attached are fully completed. [7]
2. REFERRALINFORMATION . _ . re Te
2.14. Ensure that items 1-23 have been checked and/or completed with regard to referrals. :

3. “ENVIRONMENTALLY RELEVANT ACTIVITIES) .. 7° 1S “wl eR

 

 

3.1. Ensure that Part G is completed if EPA referral is required.

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. ° FORM 2 - REQUEST TO CHANGE APPROVAL - so 7 8p fe
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding {|
applicant details and owners consent.
5. PLANS ~ : oo Be , a te ae Tas
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! zg
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
62: ‘SUPPORTING INFORMATION © ne we
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration _
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. L-] J
7. FEE St Te TOU Bs
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, v
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. . “

 

 

 

 

 

Receiving Officer

Having completed this form and accepted the ap cation, please deliver both to the following IDAS Application Receiving

trays:-

e {the application is for a Material Change of Use exclusively ~AOP1’s desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

«  Inail other circumstances - AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 35 pages

Page 2

  
   

INTEGRATED PLANNING ACT 1997 , Part A, Version 2.2, 25 Juty 2005

Common details

 

 

The completion of all.sppiicable questions on Patt As maniatany for altapplications.P Part A must:be diccompdriied by the cartiptated (DAS Assessment Checklist
en fed. ond by ove (1) or mors ether completa pars of the Form as requires. Foc more keformation on the:parts of the. Form réfer to yaww.ipa aid. gov.ey.

fo ene a pn ran elacment tnt epcain Fo itey Rein abou corp te wig dee refer to Gude 4,
Description of land 1. Streetaddress: ¢nciudinghouse number, sireet-narre, suburbrocalty name & postcode} {if applicable)

‘Adland the subject of the appication, muitde

 

 

 
 
   
 

 

    
    
 
      
  

 

 

entitled. However, a description of the land is rict
requires in retalion to a rrobile or temporary
Estrela Ret
L .- QP applets
cece ont Wa . -
: . ‘Lovonrplandes iptiot veg! LotsaFon RP 4587) 1;GPS. coordinates: oo oO
Lior OQ RF IAG YSS 5

 

However, Toto othe din
‘groposéd does sot havea tat on i M
Fer Se nae Do

ctercxnse) prone —
a 1) ve teepn cont Be
apiningagacent

tang or

 

 

 

 

 

 

 

 

   
  
  
  
 
   
 

Feds Sor combina 8 9 dep
development is on sWatopte at lon or Seirtogie |
vat nd Gl rea Far ara dette Gude .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

    

 

 

 

 

 

Proposal detalls of tra! staid: “eg. “Sai nous: aon tc Jo
FL apeeso ei r= Ud Q ro" ivan ke . _ }
a _ ee (auBaNISKiF: ERA for-aquacitture tr
Other spptcable paits of'Form: 4 ;
Pat A must diways be 96001 e ‘iby other |
parts of Foon't. Fi
ben a part of Foe {may fetito * .
“applicant detaits- : 113.” Apolicg snamne: _ 45,
the. The. 1
reat epecmnere™ | UAL WELLE I a _|
).44. Contact: naib : ‘46: Faesiile: umberle-mal ss

 

 

 

 

 

  

 

 

 

 

49.. Date.”

‘faq [sé o7

 

 

 

 

 

 

 

 

 

 

 

 

dot?’O 40 2ny 62

Page 3

KR

INTEGRATED PLANNING ACT 1897
Land owner's consent (if appiicabe)

SecSon 3.2.1(10){a) of the 1PA prescribes tiat 21

appication canviot be taken to be property made.

wihout the kaad owner's corisent

a copteation must ba support by the consent of

af and owner f the eppticalorinvotves:

“@ =~ a material change of user,

a reconfiguration of a lot

Gi) “work 00 land below high-water mark& ot within
acanal es dafinad undér the Coastal Protection’
and Management Act 19350r

ty work on ral comridor land defined under the

 

120. Land owner's.consent to the making of this application:

Part A, Version 2.2, 25 July 2005

 

 

 

 

 

 

 

 

 

 

 

   
  
 
 

“Resource eniillement (7 appécebe)
SecSon 3:2:1[10}(6) of the IPA prescribes that an
‘application cannot be taken to bé property made
without evidence of the resourte entitlement.
Adice fos completing G22

Refer to schedule 10 of tis Integrated Pienaing
Regtation 1998 that prescibes the nature of evidence’
required by she State in support of the lodging of fis
dexelopment application.

The information in ()} - {¥) 5 tear torte
required uniter (22 (8-4

Abe gory ratios be Hoe a0

 

22. Th splatn frei

       
  
 
   

- (i) “Signature of defegatediotiicer:

YES - go f9:022
by: regulationto be accompariied:by ‘evidence:. (ck applicabto Sox)
Ot 0 of the alloca tio: tort i wniilenieat "to, the Feésourcs

  
 

 

 

 

 

-amtach evidence

fésource is satisfied the development is is
fesoutes 38 te 73

 

 

 

 

 

 

 

 

Assessment triggers- Lo.
This checidist does (fot apply i the aipphcation:

the complefon of Parts-A and
_mas be completed for sie, apteaions:

Plans / drawings { réports |

An application shoits be accompatid by details to

 

“applica!

  
  
   

 

 

sipport

umtages, reerrél agencies ond any pinion viowin] -
“the eppficalion dufitig pubic ecrutiny or pubic
on ficaian lo underslaid the stage of the proposal

 

. é06-cary potential impact.

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide ail applicable information required by Part A
and any other relevant part of Farm 1.

OFFICE USE ONLY (appticable to assessment manager's}

[eer b&b So

 

  
 

 

 

 

To. n ertet St the-butdiig: wot referredto in this: sppcton
Date ofengagement / | — Accreditation Nuniber. Name: Signature:
Td dott’0 40 43nu 62

Page 4

w

INTEGRATED PLANNING ACT 1997

Past €, Version 2.1, 18 June 2007

 

Eormbi| DeveloomentfApplication

 

 

Operational &/or building work

assessable against a local government’s planning scheme

 

 

Compretion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises af the same time).

Nature of the works

The types of work that are assessable against!
a planning scheme are determined by the
scheme for a particular local government and
will vary across the State.

To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local
government.

The information in Q2 is necessary for
statistical and planning purposes.

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.

Portable Long Service Leave levy (if
applicable)

Prior to issuing a development permit for the
works, the assessment manager is required
by law to “sight" an approved form, issued by
Qleave, which signifies that the PLSL levy
has been paid.

For further information refer to
hitp/Avww.gleave.qid.gov.au

 

1. The application is seeking approval of (tick one (1) or both if applicable):

M Building work assessable against a planning scheme - provide details of the aspects of building
work (8.9. building height greater than 8.5m, building work on high landslip risk area)

[Deck propsed within Coastal frokecton Arzo. |

C1 Operational work assessable against a planning scheme - provide details of the nature of the
operational work (e.g. roadworks; landscaping; drainage works; stormwater; water infrastructure; sewerage
infrastructure; earthworks; clearing vegetation; signage)

Is the application for operational work involving the creation of new lots?
Ae [DYES - specify number of new lots to be created below

[

Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
Mino = Yes

This

 

 

pplication is for: (tick one (1) or both if applicable)

Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

| ]

/ ldcsopment permit - provide delaits of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

i work WW _coastot

UJ . 5,
Are the works subsequent to a previous development permit or preliminary approval? prottch an
NO (YES - provide details of all previous approvals AVL,
List of approval reference/s Date approved Date approval lapses

t i | t

 

 

 

 

 

 

 

 

 

 

ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
[DYES - complete Q7
EANO - a7, 8&9. do not apply
Has the PLSL levy been paid?
(11 YES - complete a8
Oj NO ~ the applicable tevy must be paid before a development permit can be given for the works

How much was paid?
| |

What is the receipt number of the payment?

 

 

 

Page 5

af l®

INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide al! applicable information
tequested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY jappiicabte to assessment manager |e -.

 

 

 

} REFERENCE |
DATE RECEIVED : i
_ DATEREGENED mers fe |
(i) ts a PLSL levy applicable in this instance? OONo LJ YES - complete (i

(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment |
manager / private certifier at the time of lodgement of this application? }

(No (2 YES - provide receipt detais

 

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

FormpDevelopmentapplication (tas
IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

 

 

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist”. The name of this checklist was changed from 25 Juty 2005 to more accurately describe its function.

2, Under the IPA and IDAS framework, an application may require assessment dy the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.}.

This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (olher than those requiring the completion of Parts A & B only).

tis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS feferral agency for the application,

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowtedgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination?.

9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.gov.ay. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10 Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, ar can be downloaded free from

www ipa.gid.dov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Reguiation 2008.

o

PN POS

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: ‘The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006,

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4, (1) anenvironmentally relevant activity (ERA) for which a code for environmental compliance
Untess you answered “none of the above" to Q1, has not been made - complete Part G of Form 4

the application requires assessment by the se ~~. . . .

arinetern ay Nor 3, % C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
if an entity, other than the administering Made - complete Part G of Form 1
authority, is the assessment manager for he iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part K7 of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

 

Cantinued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY {applicable fo assessment manager}
DATE RECEIVED

 

 

ne ee ee

| REFERENCENUMBERIS |

   

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additonal information refer to Guide 6 ‘Does my application ingger the referral coortination process?"
3° The ‘administenng authority’ may be eilher the Environmental Protection Agency, the relevant locat government (for a devolved ERA} or the Queenstand Department of Primary Industries and

Fishanes (for 2 delegated ERA),
Page 1

Page 7

INTEGRATED PLANNING ACT 1997

State-controlled road matters

For more information refer to Guide 3,

Unless you answered “none of the above" to Q2,
the appticalion triggers referral to the Department
of Main Roads (DMR) as a referral agency,

In certain circumstances OMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the [P Requlation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

 

2.

The

application involves: (tick applicable box/es)

(DAS Assessment Checklist. Version 20, 2 April 2007

(1) development on tand contiguous* to a State controlled road and for -
(1 (a) material change of use assessable against the planning scheme:

0 (0) recontiguring a tot unless -

« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
LC (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b} above)-
* associated with access to a State-controlled road; or

« for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a

State-controlled road.

[2] (ji) development on iand not contiguous to a State-controlled road and -

( (a) material change of use ~

« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by

that schedule;

(J (b) reconfiguring a lot for a purpose mentioned in schedule of the IP regulation
and exceeding the thresholds set by that schedule;
C1 (c} operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b) above)—
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

that schedule.

Hii none of the above

 

Clearing vegetation
For more information refer to Guide 12,

Unless you answered “none of the above” to Q3,
the application requires assessment by the

Oe, jatural ind Wi

(NRW).

{fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter,

if you ticked Q3(i) or (ii), your application requires:
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not,

The

application involves: (tick applicable box/es)

CI (i) material change of use -
(a) assessable against the planning scheme:

Qii

Dit)

(b) on a lot containing -

* acategory 1, 2 or 3 area shown on a properly map of assessable vegetation; or

« if there is no property map of assessable vegelation for the jot - remnant vegetation;
(c} where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

ii) reconfiguring a lot -

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for

the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of

Form?

iw none of the above.

 

Strategic port land

For more information refer to Guide 41.

If you ticked (i) - the retevant Port Authority is the
assessment manager for the application.

if you ticked (ji) Queensland Transport is a
concurrence agency for the application.

 

The

application involves:

CO (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI

Act) - complete Part t of Form 1

LD (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port !and - complete Part ! of Form 1

chi

iii) none of the above

 

4 Land contiguous to a State-contolled road is defined in schedule 14 of the IP Regulation to mean land - if part of the tand is within 100m of the State-convolled road, or that is part of a future State-

controlled road.

Page 2

Page 8

INTEGRATED PLANNING ACT 1997,

Acid sulfate soils 5.

For more information refer to Guide 10.

Unless you answered ‘none of the above" to O5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

Hf an agency other than NRWis the assessment
manager for the application, NRW Is an advice
agency for the application in relation to this
matter.

DAS Assessment Checklist, Version 20, 2 April 2007

The application involves development on land situated in an identified5 local government area
and where the surface of the land is: (tick appfcable box)

(2 (i) below 20m AHD¢6 and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

O (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of materiat

mii none of the above

 

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

If you answered "YES" to O6, the application
fequires assessment by the Department of
Emergency Services (OES).

if an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
we hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
N

0
(DYES - complete Part L of Form 1

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (f}, refer
to Guide 1§. For more information about item
(9). refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered "none of the above" fo Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the applicalion in
relation fo this matter.

The application involves:

C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
{lick applicable box/es)

C1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Kz, Ka, Ks, or Ka of Form 1 whichever is applicable,

(J {b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1;

(1) for a subartesian bore, in declared subartesian area’, or in a certain area
covered by a water resource plan, for use for purposes other than stock and/or
domestic use - complete Part Ks of Form 1;

(2) (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;

(1 (e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ka of Form 1;

for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1

[1 {g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1, OF

Mii none of the above.

 

Removal of quarry material from a
watercourse
For more information refer to Guide 16.

If you answered "YES" to 08, the application
fequires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter

Note: Part G af Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Retfevant Activity (ERA).

 

 

Does the application involve development for the removal of quarry material from a watercourse®
requiring an allocation notice under the Water Act 2000?

no
(1 YES - complete Parts Kr and G of Form 4

 

5 The identified local goverament areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg. Burdekin, Burke, Burnett, Caboolture, Caitns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooboola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Lagan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pite Rivers,
Redcliffe, Redland, Rockhampton, Sanna, Thuringowa, Tiaro, Torres, Townsvilla, Whitsunday.

Austrafian Height Datum {AHD)

Referable dam 1s defined under the Water Act 2000.
Watercourse 1s defined in sch 10 of the IPA.

OOWe

The daclarad ground water areas are listed in Guide 13 Development in a dectared catchment area,

Page 3

Page 9

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas reter to Guide 24,
Uniess you answered “none of the above® to 09,
the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager {or the application, EPA is a
concurrence agency for the application in
relation to this matter.

Local government is the assessment manager
for all prescribed tidal work.

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidat work in
local government tidal areas refer to Guide 24,
Uniess you answered “none of the above” to
O10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency,

Local government is the assessment manager
for alt prescribed tidal work.

9,

iDAS Assessment Checklist, Version 20, 2 Aprit 2007

The application involves operational work that is: ( tick the applicable box/es}

(1 @ _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1: of

tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1:

oi
Diy

or

carried out within a coastal management district under the Coastal Act and for — compiete

Part M of Form.t if any box/es (a) to (i) below are ticked.

constructing or installing works in a watercourse between MHWS and HAT (e.
other than those works in tidal water) where the development has been determined not
to be assessable against the Wafer Act 2000;

constructing a canal intended to be connected to tidal waters;

Oa)

C) )
Ov)
O@)
Oe)
Ow
O@

Dh)
Oo

constructing an artificial waterway:
teclaiming land under tidal water,

disposing of dredge spoil or other solid waste material in tidal water:
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State

coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on fand, other
than State coastal land, above high-water mark; or

{iv) none of the above.

10. The application involves operational work that is: ( tick the anpticable boxes)

(7 {i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF

(7 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
(C1 (iii) carried out within a coastal management district's under the Coastal Act and for -

iw) none o!

Oe

Ob)
Oe

disposing of dredge spoil or other solid waste material in tidal water - complete Part *

M of Form 1;

teclaiming land under tidal water - complete Part M of Form 1; or
constructing a canal, if the canal is associated with reconfiguring a lot - compiete

Part M of Form 1;
f the above.

 

Coastal management

For more information refer to Guige 18.

Unless you answered “none of lhe above” to
Q11, the application requires assessment by ihe
Environmenta! Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

 

11.

The application involves: (tick the appiicable boxes}

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA‘ of at least 1000m?2

+ the entargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with
the construction of a canal - complete Part M of Form 1

none of the above

oO
Di

Ditiiy
Ow

go)

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely oF partly within a local government tidal area
12 Cana! means canal as defined under the Coastal! Protection and Management Act 1995

13 Tidad work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partty within a loca! government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management disinet under the Coastal Protection and Management Act 1995, olher han an area declared as a
coastal management district under section 47(2) of that Act.

18 GFA is defined in sch 14 of the IPA to mean the grass floor area. For a definition of how to calculates GFA, go to the planning scheme against which the application 1s being assessea

17 Under $117 of the Coastal Protection and Management Act 1995, an application far reconfiguration, where the reconfiguration 1s associated with the construction of an artificial waterway. must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 10

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

Foe more information refer to Guide 18, For

information about prescnded tidal work refer to

Guide 24.

If you answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Part Authority is a concurrence agency if the

development is -

© within 200m of a shipping channel or an eniry
and exit shipping corridor for the port

© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.

tn all other situation the Port Authority is an

advice agency.

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidat work refer to Guide 24. The local
government is the assassment manager for all
prescribed tidal work.

If you answered "YES" to 013, the application

triggers referral 1o Queensland Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tldal
areas

For more information refer to Guide 18.

Unless you answered “NO” to Q14, the relevant
Port Authorily is the assessment manager for the
application and the Environmentat Protection

Agency (EPA} and Queenstand Transport (QT}
are concurrence agencies for |he application.

 

13.

4.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark! and within the limits of a port
a the Transport infrastructure Act 19947

NO
(DYES - complete Pat M of Form 1. o Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths? .

NO
(71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

Dogs the application involve tidal works within a strategic port land tidal area???
no |
(YES - complete Part M of Form

 

Heritage
For further information refer to Guide 19.

If you answered “YES” to Q15, the application

triggers referral to the Queensland Herilage
Council as concurrence agency for lhe
application.

 

Unless you answered “none of the above’ to
Q15{b), the applicalion involves referral to the
Environmental Protection Agency as an advice
agency for the application

15,

15(b)The application involves: (tick applicable boxes)

Does the application involve development in a heritage registered place as defined under the
Queensiland Heritage Act 1992?

(No

(11 YES - complete Part C of Form 1

(i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992:

reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;

none of the above.

Ditii

wii

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q46, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is 2
concurrence agency for the application in
retation to this matter

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

Ci (i) reconfiguring a fot if any tot resulting from the reconfiguration is tess than 16 hectares;

C (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
of out an environmentally relevant activity under the Environmental Protection Act 1994;
(iii)

none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995.
20 Strategic port and tidal areas are the areas generally 50 metres seaward of high water mark adjacent to svategic port land.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997
Contaminated land

Applications involving material change of use
and/ or reconfiguring a lot may trigger this
referral,

For more information refer to Guide 5.

Unless you answered “none of the above" to
O17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the apptication, EPA will be a
concurrence agency for the application in
relation to this matter.

17.

IDAS Assessment Checkiist. Version 20, 2 April 2007
The application involves: (tick the applicable boxes)

(1 (i) reconfiguring a lot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
+ item 5, including the exemption otherwise provided for by paragraph (d);
+ item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
LD (ii) a material change of use -
{a} made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 4

none of the above

A iy

 

Electricity infrastructure

For more information refer 1o schedule 2of the IP
Reaulation.

Unless you answered ‘none of the above" to
Q18, the application tiggers referral to the

@gency to which the easement is granted in
favour of as advice agency.

18.

The application involves: (tick the applicable box/es)

C1 (i) reconfiguring a lot where any part of the lot is -

« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement:

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

{1 (iv) operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

+ the work is located wholly or partly within 10m of a substation site;

Aw none of the above.

Oi)

oii

 

Land designated for community
infrastructure

Applications involving development an land
designated for community infrastructure may
trigger this referral.

For more information refer to schedule 2 of the
'P Regulation,

if you answered "YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter

 

. Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.

NO
OD yYes

 

Page 6

Page 12

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedute 2 of the
(P Requlation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management {OUM),

Fisheries matters

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of he above" to
Q21, the application requires assessment by the
Qepariment of Primary Industries and Fisheries
(DPI8F).

If an agency other than OPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
telation to items {i) - (iv) and an advice agency
In relation to item {v).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick appiicable boxes) -
(0 (i) amaterial change of use of premises —
{a) in a Major Development Area in the Urban Footprint for -
OC (i) anurban activity -
(2 inanarea included in a structure plan where the IPA, section 3.1.6
applies;
(2s inan area not included in a structure plan where -
+ the IPA, section 3.1.6 applies to the application for the material change

of use; or
the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
( (ii) intensive animal husbandry; or

C (ii) residential development involving a rural residential purpose

.
.

(b) in the Regional Landscape and Rural Production Area for -
© (i) anurban activity and not specified in section 2.4(2); or
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the investigation Area for -
© (i) anurban activity and not specified in section 2.10(2);

0 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

(1 (ili) intensive animal husbandry

1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
{a) not included in a structure plan; and

(b) not specified in section 3.1(2).
wt (iii) none of the above
21. The application involves: (tick the applicable boxes)

C1 (i) an assessable material change of use for aquaculture - complete Part Os of Form 1;

C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O: of Form 1,

CU (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1,

(1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part Oz of Form 1;

[1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;
none of the above.

wi

 

 

Page 7

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri 2007
Integration of land use and public 22. The application involves: (tick the applicable box/es)—

transport

For nsPe information refer 10 Guide 23, schedule (3 (i) a material change of use assessable against the planning scheme for a purpose

8A of the IPA, & schedule 2 of the IP Requlation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.

application triggers referral to QT as a

concurrence agency. O (ii) reconfiguring a tot—

(1 (a) ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

(i (c) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

{J (4) fora residential purpose within the 25 ANEF contour for an airport:

C1 (e) fora residential purpose resulting in 100 or more allotments.

O (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a tot mentioned in (ii)
above, on jand that—

C1 (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) _ will result in work that encroaches into an airport's operational airspace.

in none of the above. @

Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information reter to Guide 23, schedule (C (i) a material change of use assessable against the planning scheme for a purpose
BA othe PA & schedule 2 of he IF Regulation mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above", the
application tiggors referral to QT as a schedule.
concurrence agency, 1 (ii) reconfiguring a fot—
(J (a) onlang that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
{J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(1 (c) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(3d) ontand that abuts rail corridor land, commercial corridor {and or future railway
land and an easement abutting the corridar or future railway land is created:
OC (e) _ ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
CU {f} for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @

 

above, involving extracting, excavating or filling greater than 50m, on land that—
(1 (a) _ is completely or partly within rail corridor and or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
C1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

 

w (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: {tick the applicable box/es}—
eeauten es answered ‘the above’, the CO (i) a material change of use assessable against the planning scheme and not associated
inless you were none of the ve”, ey 5 A .
application triggers referral to the holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
pipeline licence No 1 issued under the Petroleum easement.
Act 1923, currently Santos QNT Pty Ltd, for ne Fert
ae Ci (ii) reconfiguring a lot

C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

Hiv none of the above.

 

 

Page 8

Page 14

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requlation.

Unless you answered “none of the above’, the
application requires referrat to the Environmental
Protection Agency as a concurrence agency.

{DAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable bowes)—

C (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in —

(1 (a) clearing of native vegetation over an area greater than 2500m?;

(J (bd) a new building and any reasonably associated structure with a total footprint
greater than 1000mz2;

(J (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;

(J (a) extracting gravel, rock or sand from an area greater than 5000m2;

(1 (e) excavating or filling an area greater than 5000m?;

(C1 (f) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

C (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -

(1 (a) anincreased number of lots;
C1 (b) clearing of native vegetation over an area greater than 2500m?.

0 (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

LC (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring @ lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

C (a) clearing of native vegetation over an area greater than 2500m?:
(1) (b) extracting gravel, rock or sand from an area greater than 5000m?;
O(c) excavating or filling an area greater than 5000m?,

Ww none of the above.

 

Wild river area

For more information, refer to Guide 27,

If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibiled” in a wid river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

NO
DYES

 

 

Preliminary Approval

If you answered YES to 027, the application
triggers referral to the Ogpartment of Local
Government, Planning, Sport and Recreation as
an advice agency,

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?

CYNo
Olyes

 

Wetlands

Domestic activity means the construction or use
of a single residence on a lot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include.
carelaker's residence, granny flat, building or
structure used for a home business.

Note: Wetland is defined in the integrated
Planning Regutation 1998.

Unless you answered “none of the above’ to
28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application,

28. The application involves: (tick the applicable boxes) -

C1 (i) amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
(1 (ii) reconfiguring a ot -

In or within 100m of a wetland that will result in
(1 {a) more than 10 lots being created; or

(] (b) lots tess than 5 hectares;

none of the above

iii

 

Page 9

Page 15

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporling, recreation and commercial
purposes, bul not including environmental,
conservation, rural, natural or wilderness area
purposes”

Unless you answered “none of the above" io
29, the applicaton involves referral to the

Environmental Protection Agency as an advice

agency tor the application.

 

IDAS Assessment Checklist, Version 20, 2 Apnl 2007
29. The application involves: (tick the applicable box/es)—
(1 (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
C) (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;

(2 (b) a State forest or timber reserve under the Forestry Act 1959:

(1 (©) amarine park under the Marine Parks Act 2004;

1 (d) arecreation area under the Recreation Area Management Act 1988;

(J {e) a world heritage area listed under the World Heritage Convention:

(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.

D (ii) reconfiguring a lot if -

CA (a) _any part of the lot is situated in, or within 100m of, any of the following -

Lf) a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992:
LI (ii) a State forest or timber reserve under the Forestry Act 1959;
DO (ili) a marine park under the Marine Parks Act 2004;
C1 (iv) arecreation area under the Recreation Area Management Act 1988;
Cv) — aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1) (b) the reconfiguration involves more than 10 jots being created, or any lot
resulting from the reconfiguring is less than Sha;
(iii) none of the above.

 

Page 10

Page 16

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)

Wild River Area

It the responsibility of the applicant to
determine if the development is proposed in
a wild river area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Waler (NRW), accessing
the department's website www.nnw.qid gov.au oF
contacting the department by email on:

wild [email protected] gov.au

Note on Referrals

Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities} are nol changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development In 2 wild
aver area, see the refavant wild river declaration
and Guide 27. The relevani witd river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
inctuding those in a preservation area (PA), must
be assessed against and must comply wilh the
Wild Rivers Code where indicated in a relevant
wild river declaration.

 

Environmentally relevant activities
({ERAs) in a designated urban area

you answered YES. your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do nol need to complete the
remaining questions in Section 2.

If you answered NO to Q2, please complete the
remaining questions in Section 2.

Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable box/es)
(1 i) ahigh preservation area (HPA);

(ii) a preservation area (PA) ;

(7 iii) a wild river floodplain management area (FMA):

(1) a wild river nominated waterway;

(J v) a designated urban area (DUA).

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river dectaration)?

i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59

CNo

oO YES (ensure you have completed Part G of Form 1)

 

Clearing native vegetation

It YES. there are a limited number of purposes
for which an application to clear native
vegetation may be accepied in a HPA. See
Guide 27 for a tist of relevant purposes for
which an application may be made in a HPA.
Mf YES and you ticked Q4 box i) the application
May be made and is assessable against the Wild
Rivers Code. if YES and you ticked Q4 box ii}
the application will nat be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this,
development where wild river requirements
apply, do not complete the remaining questions
in Section 2

 

Is the application operational work for clearing native vegetation in a HPA?
oO NO (1 YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

(CJ i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

LC ii) ina HPA outside a registered area of agriculture?

Page 11

Page 17

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas

if you answered YES to Q5, and ticked any
boxes in Q6), your application ts required to be
assessed against and must comply with the Wild
Rivers Coda.

If you answered YES to Q5 and licked box j) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
government area, il is prescribed tidal work - the
relevant loca! government will be the
assessment manager with the EPA as a
concurrence agency

lf you answered YES to Q5, and ticked box ii} or
it) in Q6, your application requires referral to
OPIF.

If you answered NO to Q5 and ticked box j} in
O86, the application wil! not be accepted.

If you answered NO to Q5, ticked box ii) in Q6
and the davelopmeat is necessary to install
authorised works or infrastructure where a
development permit is not required. or if a
required permil is held, the application must be
assessed against and musi comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.

{f you answered NO at Q5 and ticked box iii} in
Q6, ihe application may be made if the works are
in a PA, These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works reler
to Gyide 27

Residential, commercial or industrial
development

If you answered YES to Q7, your application is
Hot subject to wild river requirements. Provided
there are no other aspects of this development
thal require assessment against the relevant wild
tiver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q7 and ticked either box
i) or fi) in Q8, the assessing agency ts the
relevant local government. The application must
be assessed against and must comply with ihe
Wild Rivers Code.

6,

IDAS Assessment Checklist, Version 20, 2 April 2007

Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

(Jno Cl yes

The application is for one or more of the following:

(71 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); or

(1 ii) Operationat works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), OF

Di) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).

Is the application for residential, commercial or industrial development in a designated urban

area?
CL) yes

mie

If NO, does the application for residential, commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 1); or

(1 ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

if you answered YES to 09 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animat husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wikd Rivers Act
2005 and refer to Guide 27.

Agricultural activities

If you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
Agt be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
22.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
jechniques is aot an agricultural activity as
defined under the Wild Rivers Act 2005 For
more information see Guide 27.

 

10.

Does the application involve a material change of use for animal husbandry activities (as defined @
under the Wild Rivers Act 2005) in a PA?

LNo

YES {ensure you have completed Part R of Form 1)

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

LNno

If YES is the application for:
Li) a material change of use: or
0 ii) operational works.

(yes (ensure you have completed Part Q of Form 1)

 

* Page 12

Page 18

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration wif siale
works that take overland flow water are either
self assessable or assessable, or are exempl
from wild river requirements.

if you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
ang must comply with the code.

If you Scked Q13 ii) an application is not required
to be made however the works must comply with
the relevant setf-assessable section of ihe Wild
Rivers Code, otherwise the works become
assessable development for which an application
§8 required and musi be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 iii) your application is not
subject to wild river requirements.

Applications for davetopment that is olher than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overfand flow water in a HPA or an FMA?

Oo NO oO YES (ensure you have completed Past Ks of Form 1}

If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works

{J ii) setf-assessable works

iti) exempt works

 

Works that interfere with overtand
flow water

The relevant wild river declaration will state
works lhat interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements,

If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q15 fi) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
1s required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Hf you licked Q15 iii) your application is not
Subject to wild river requirements.

Applications for development thal is other than
that slated to be assessable, self-assessable or
exempt will not be accepted.

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to 16, your application
mus( be assessed by OPIF against the Wild
Rivers Code and must comply wilh the code.

16.

Does the application involve works that interfere with overland flow water in a FMA?
Ljno (77 YES (ensure you have completed Part Kio of Form 1)

{f YES, is the application for works stated in the relevant wild rivers declaration to be?
(C1 i) assessable works

LD ii selt-assessable works

1 iii) exempt works

Does the application involve building or raising waterway barrier works in a PA?
(no [YES (ensure you have completed Part Os of Form 1)

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted,

It you answered YES to Q17, your application
must be assessed by OPIF against the Wild
Rivers Code and must comply wilh the code.

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepled

In a PA, applications for instream dams and
weirs may be accepled in nominated waterways.
tf you ticked box ti} in Q19, your application wilt
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and localions of nominated
waterways is available by contact NRW,
accessing the department's website
www.nrw.qid goy,au or contacting the
department by email on:

wild [email protected] the application involve aquaculture in a PA?
oO NO O YES (ensure you have completed Part O; of Form 1)

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

(ino

if YES,
(J i) The application is for an instream dam or weir; or

(1) Yes (ensure you have completed the relevant Part K of Form 1)

(ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

 

Page 13

Page 19

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will nol
be accepted. Applications which may be made
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to OPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs}

If you answered NO to Q20 you do not need to
complete Qs 21-24

you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority”!
against the Wild Rivers Code and musi comply
with the code, unless the proposal is for
development where an appiicalion will not be
accepted, or is exempt from wild river
requirements (see Q2), You will be able to
determine if an application will not be accepted
for the development by answering 021 - Q24.

If you answered NO to Q21, you do not need fo
complete Q22. If you answered YES to Q21 you
are required to complete Q22.

lf you answered NO to Q22, the apptication will
not be accepted. If you answered YES to 022,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
wilh the code.

If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to 023, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivars Code and must comply
with the code.

\f you answered YES to 024 the application will
not be accepted, If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.

Note: All applications that can be accepled must
be assessed against and must comply with the

Wild Rivers Code (other than exempt ERAs in a
designated urban area),

Documentation

If you answered NO to Q25, your application
may be subject to an informalion request and
processing of ihe application may be delayed.

 

20.

21.

22,

25,

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?

LJ No

ts the application for an ERA 20 instream?

(No (J Yes

Is a quarry allocation notice held for the proposed ERA 20 instream?

(1No (yes

Does the application involve any of the following in a HPA? -

i) a level 2 ERA 11, (and is for specified works or a residential complex)

il) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

(No (Yes

Is the proposed development for ERA 20 (out of stream) and;

— inaFMA; and

— notlow impact; and

— hot for a residential complex in the area, or for specified works.

(no CJ yes

CD YES (ensure you have completed Part G of Formt)

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

ime LJ yes

2 The administering authority may be either the EPA, or if devotved or delegated, the locat govemment, DPIF or NRW.

Page 14

Page 20

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3 -

BUILDING REFERRALS (completion not mandatory)

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the DAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.

For more informaton go to schedule 2 table 1 and
schedule 2A of the IP Regulation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedute 2A part 1 of the integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2.
For more information go to schedute 2 of the IP-
Reaylation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the [P.
Reaulalion

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For more information go to schedule 2 of the IP_
Requtatioa

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises.

 

Private health facilities 5.
For more information go to schedule 2 of the IP
Reguiaton

An application may trigger referral to the Department of Health as a concurrence agency if the apptication
involves a private health facility.

 

Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?.

 

Land contiguous to a State-controlled | 7.
road

For more information go to schedute 2 of the IP.
Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

Pastoral workers accommodation 8.
For more information go to schedule 2 of the 1P
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For more information go to schedule 2 of the iP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go lo schedule 2 of the IP.
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line2?.

 

Heritage 11.

For more information go to schedule 2 of the (P.
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace,

 

 

Railway safety and efficiency 14,

For more information go to schedule 2 of the IP
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

 

 

The local government, as the concurrence agency, is required to assess and provide a response for the following building apptications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 1 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :

particular building work for single ¢ forasingle detached class 1 building or class 10 structure; and

detached class 1 building or class 10 the local government has declared by resolution the following:

building or structure - the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more infarmatian go to schedule 2 table 1 of the the locality; and

PRequalion . — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a focality,

deemed approval.

 

 

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
2) Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities",
Page 15

 

Page 21

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 Apal 2007

 

 

 

 

 

 

 

 

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation.

Assessment period 15 days. No response is a

deemed refusal. .

Design and siting 17. An application may trigger referral to the locat government as the concurrence agency if the building work

For more information go to schedule 2 table 4 of the does not comply with the performance criteria of parts 11 and 12 of the Queensiand Development Code.

IP Requlapon. 18. An application may trigger referral to the loca! government as the concurrence agency if the building work

Assessment penod 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

Geemed relusal 49. An application may trigger referral to the locat government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12. \

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the |

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has —_ |

For more information go to schedule 2 table 1 of the been completed.

IP Regulaton.

Assessment penod 15 days. No response is a

deemed refusal,

Higher risk personal appearance 21. An application may trigger referral to the focal government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table 1 of the ¢ complies with the performance criteria of the Queensland Development code part 15; and

iP Requlation and the QC part 15 ¢ the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal.

Building work for residential service {22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

{P Requlation and the QDC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days, No response is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 lable 1 of the

IP Requiation

Assessment period § days. No response is

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referral to the tocal government as the concurrence agency to determine if the

designated rainwater tank area
For more informabon go to schedule 2 table 1 of the
IP Regulation and the QDC part 25.

Assessment period 15 days. No response is 2
deemed refusal,

 

building work or structure complies with the relevant performance criteria if -

¢ Under the Building Regulation 2006, a rainwater tank is proposed to be instalted as part of relevant
duilding work, in a designated rainwater tank area; and

¢ Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria

 

 

Page 16

Page 22

 

 

 

 

ae : : | _
Lo semen ag | GNA yrune) SQ] 7) ane HONEA AS tg NOY
Qt) ae DAUATAY ANAM wr godid Nyik Goold ayad ame LNA Iedag WAIYNIL OD
. _ SNOUL VSR 20 Na ais amas 104 SIN AA SF

 

 

 

 

 

 

 

 

 

 

 

BML put Ad 3 nel ran a
Tans LaQLinveal SYN

 

 

BAN WW. daadpeniustyz
: wah. Ad ANHLN

 

 

4

YNNSera a0 ava
Yuga a0 ann

TM BAN UELLAS

BA CE BANALINY?

Page 23

 

 

 

Loy JS ee Cann yeaa) 0011 arya WAAE AG iN
® 07 aan SALTON BENZ Wada | NYE Soot AahN\ Lass | nex yyynil 99
| amen — - : POL SASdHO Tamei aa ora wade

 

 

CHV ET
YNTANY YNBsxg 20 AN

3

Laysit

JNA? Cove 207
UNAS sap
bee

 

/ NM FNTariY vow | ai
WSCA) Oo Ye) dav ——

 

agp”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a
1 i
: |

 

 

 

 

 

 

wae PP
AFA ILNY? MAN 4. i
SEEPS

Cee

Li eet

 

 

 

 

 

 

 

 

 

 

 

 

 

i CLK >| Saaiays 8

 

 

 

 

 

 

YNILUG

saasta mauo nun {>
“aidig Baa. MAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ay

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ot
it
qt

 

4 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

we
o

 

AAUWLNY

mad cea

WNILAXA aD AS

‘ to?

Aad WA &:

Yruserixd 30 4M

 

 

 

 

 

 

 

 

 

 

 

ANAS Nad aang UM
OL 2 -M ANn0B7 OL
rayne WAOMAIMS “AAMe1

yw AalyN a

‘SAaa?7

AvArag

9°00 3 ALES Zt
And wt YN 1a A a ;
4 t Ss ; DALIM May tity
Vornia? coLZ K | a + |
YOU Ni #, Aer f Oo,
| | $ i By mk vaNiiNgad \ i |
| Yung ni | J twa MEN \ a
. nn —! — —_
z a HY
! | A Z et / & OE Ad ci
PAL \ wana mag
oO 0 anriino | Cee iar
Oo a! | : LH
7 = 4. =e
| i

Page 24

 

 

i en a en need a

NW 00% 1441 “4a Aner) -volyniL 79

(rap man) 00) :1 atyee WEA AG TYNES
SNOLYIaDyY DNAS WANO4 Beg SNe LSS

 

 

 

 

 

 

 

 

 

 

 

  

t
i

 

  

 

 

 

 

Page 25

LO Jenyrd 7 oe Ja} - 7
er pane iyo | 1 aes ea Nes
Awwyp Lasre7 a 7a ANAM rw godat ) enoitAai4 d : 1ng7da7 Vani. 99
RoW AAW INA dig as Mod wad NW HILT

 

 

 

 

me a - NOW YANNA Loo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

r I- J ABCA WARIO 4 NAGI
LT |

— |

 

 

 

 

 

 

o-oo, EE = Pe mene cae TTT rpc ae
LABBiG YNiLen ”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cee — 0 BKo
|
- AaKe4 “Bz AR.

 

 

 

 

 

 

 

 

 

 

 

 

 

a

t

|
Ls

 

 

 

 

NOLLVAI4 174m

G00\ Ta. . Yo . ; — - —{——— 7
oo s
“ 5

Kana, varie yNued

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
\ ;
‘ 3
|

 

 

 

 

 

 

 

 

 

 

 

 

lS
bo ee ay 19M Tedan treN

 

li
=

 

whe

Page 26

 

 

 

Lo tonnw

9204 laste

 

 

 

 

Qo, a1 WA
ZION aliwha3

 

yovad Bywees

4ANA9ST39  YAIYNIL 9)

POW sradiesy vamos yor onma 2977

 

A

j ‘
“ANY “aamer -7NuLaIRg

|
t

Tan aay Yeilaed

\

 

 

 

 

NOLL WIDON - oe
——S = —— BR
| oly ay

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOLLWAAS 174

 

TaN “aadah man “NCZ!

|
\v
(aniad se4mo17 Va

Aredia WON Aly 40L

 

 

 

 

 

 

 

oo | Lap at

 

 

 

 

 

T ceatpe mm aT ag

 

 

 

 

 

 

 

 

 

 

rr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

_

Page 27

 

7al Qt

 

:LO oes

 

 

 

 

 

{en
{A
of}
Mo
9

“BIS “24kin PVH

nat ne

“errant Yr samt

Van Late Wy ASA ao
YS? BO ANYALCO

MAA LIZANMAULNY?
YrUuAvd <0 Aanrind

AL

ATARI V7 MAN -y ;

Qeren TAO 30oR

2™ Loe) : Waa
HAIN 20 huNtO?:
VE 30 Hola -

SSSCZ DANG OF ko

TRY “aN teYsodad

 

90, 5 | MWg
NY DnaLne7/ ae

 

TAMA 37 VANOG
ANSE? VEIYNLL 99
Spe ipyoey SIpeticed -Hanmas gad aid alae

 

 

\

en
\

 

 

 

|

7

f
{

/

 

|

 

 

|
|
|
pet

 

 

ROreT
A

 

 

hom

 

 

 

 

\ Oe
\ : \ as

 

COL EAL

7G42387

——
my
a

 

 

 

 

 

 

abl G\

 

anv] a ~~ \ \ \

4A \
\ \ \ \
\ |

i 1

 

 

 

 

\
\ vas soo maya
i \
t
tr m \
en \
A on 7 . S 3 i

 

Page 28

Te

|

\ ENGINEERING

 

 

 

 

 

 

 

a” & BUILDING INVESTIGATION SERVICES

 

ACN: 104 324 969
ABN: 93 104 324 969

 

DATE:

 

PROJECT DESCRIPTION:

CODE FOR DEVELOPMENT ON

STEEP OR UNSTABLE LAND

LOT 30 (NO 66) TINGIRA CRESCENT, SUNSHINE BEACH

CLIENT: RJ Neller Building

PO Box 284

PEREGIAN BEACH OLD 4573
EBIS REFERENCE: 278118-SU

2 October 2007

Proposed Alterations to Residence

 

 

PO Box 973 BUDDINA Q 4575
Unit 1 / 4 Textile Ave, Warana
P {07} 54369199

F (07) 5436 9198

E [email protected]

Page 29

LOT 30 {NO 66) TINGIRA CRESCENT. SUNSHINE BEACH EBIS REFERENCE NO: 278118-SU

CODE FOR DEVELOPMENT ON STEEP OR UNSTABLE LAND

 

1.0 Introduction

We advise that Don Stanfield, practising as a geotechnicat engineer, has examined the
above site and assessed it with respect to acceptable measures outlined in the Code for
Landslip Hazard in Noosa Shire.

2.0 Findings
2.1 Geology & Soils

The geology of this site is shown on Queensland Geological Survey maps as being Qhb ~
Quarternary. The soils in this region are shown as being parabolic dune systems (quartz
sand].

Our soil testing on this site confirmed the above. The slip hazard or zoning for this site
would be considered to be negligible on the flatter region of the garage/house site
increasing to low or moderate risk towards the gully.

From the Noosa Shire Planning Scheme Review Project Map | — Landstip Hazard, the
subject lot is within area designated “Significant Landslip Hazard Potential”.

2.2 Soil Profiles

The report reference no. 278118-S! details the soil profile for this site. Some fill was noted
near the house and also the presence of septic trenches or other form of subsoil drainage.
The natural soils were predominantly dune sand of fine to medium grained, poorly graded.

It appears that this soil profile is consistent of soil types in this area.
2.3 Proposed Site Works

Negligible earthworks will be required for the proposed site to provide the deck extension.
The overall earthworks would have a volume well less than 50m3.

We recommend the following work to be undertaken:

e Surface runoff water should discharge to spoon drains.

« Subsurface cut off drains or grates beside the proposed extension only as required, to
intercept seepage water.

e Batters to cut or fill embankments are not to exceed a slope of 1 vertical to 2 horizontal.

¢ On the battered slopes mulch and plant with varieties to minimise soil erosion.

« At the ends of the spoon drains provide plantings and place rock spails to disperse any
concentrated flow to minimise erosion.

« Where batters are likely to exceed the above slopes due to the slope of the site, provide
a line of rock boulders at the toe to reduce embankments.

2.4 Footings & Slabs
The footing design requires foundations through the natural soil profile and weil into the

natural soil profile. We recommend a minimum depth of 1500mm. During construction we
recommend that the soil profiles be verified and footing details confirmed.

PROPOSED NEW RESIDENCE PAGE 1 OF 2 2 October 2007

Page 30

LOT 30 (NO 66) TINGIRA CRESCENT, SUNSHINE BEACH EBIS REFERENCE NO: 278118-SU

2.5 Effluent Disposal
Waste water will be disposed of via council's sewerage system.

3.0 Conclusion

In accordance with the engineering principles, due regard has been given to the proposed
building extension and foundations. We have also assessed the proposed stormwater
system and sewage disposal and consider these will not adversely affect the site stability of
this site and adjoining allotments.

EBIS recommends a final inspection and evaluation of the site layout including cuts/fills
retaining walls and surface and subsurface drainage systems. This is to ensure compliance
to the above recommendations and sound building practices on steep and sloping sites.
Please contact EBIS when this inspection is required.

Yours faithfully,

D. R. Stanfield
BE. {civil, CP. Eng, MLE, Aust, RP.E.Q. No. 4177, NTBPB STESI329, Vic EB 19910,

ENCLOSURES:
1. The Noosa Plan Extract
2. Mapping of the Landslip Hazard areas
3. Map View Extract

PROPOSED NEW RESIDENCE PAGE 2 OF 2 2 October 2007

Page 31

Column t
Defined use or use
class

     

Column 2
Assessment category

Water Supply Catchment Areas _. oo

Column 3
Relevant assessment criteria -

applicable code” if development

is self-assessable or requires
code assessment

 

Cultivation;
Animal husbandry;
All Business Uses;
Community Uses,
except Open space
Type 1 Sport &
racreation;

All infrastructure
Uses;

Residential Uses,
except Detached
house

Exempt if the criteria for code
assessable do not apply

Code assessable if on land
identified as Water Supply
Catchment Area on Overlay Maps
OM1.5 or 3.5.

Natural Resources Overlay Code

The Noosa Plan

commenced 3 February 2006

 

Areas in Proximity to Gas Pipelines

 

Ail uses and use
classes

Exempt if the criteria for code
assessable do not apply

Code assessable if within 200m
of the gas pipeline identified on
Overlay Maps OM3.5 or 5.5

Natural Hazards Overlay Code

 

Coastal Protection Precincts

 

 

All uses and use
classes if invoiving
building work

 

Exempt if the criteria for code
assessable do not apply

Code assessable if within a
Coastal Protection Precinct ©
identified on Overlay Maps
OM1.5, 2.5, 4.5, 6.5, 7.5, 8.5 or
9.5

 

Natural Resources Overlay Code

 

 

Table 13.7 Assessment Categories And Relevant Assessment Criteria For The Natural
Hazards And Natural Resources Overlays — Development Other Than Material Change Of

Use

Cotumn 1
Type of Development

    

Landslide Hazard Areas

   

Column 2
Assessment category

(ero e need
Relevant assessment criteria—
applicable code” if development
is self-assessable or requires
code assessment

 

 

Carrying out building
work not associated
with a material change
of use, except for a
Detached house

Carrying out building
work if relocation of a
building, except if a
Detached house

 

Exempt if the criteria for code
assessable do not apply

Code assessable if—

a) identified as Landslide
Hazard Area on Overlay
Maps OM1.3—9.3;

AND

b) involving earthworks
exceeding 50m* (other than
the placing of topsoil); or

 

Natural Hazards Overlay Code

 

 

28 The applicable codes identified in this table apply in addition to any applicable codes identified in a locality plan.

13-509

Natural Hazards and Natural Resources Overlays

Page 32

The Noosa Plan

commenced 3 February 2006

Column 1
Type of Development

   

 

Reconfiguring a lot

Carrying out operational
works for reconfiguring
a lot

Excavation or filling of
land not associated with
a material change of
use

Column 2
PNET ose cis ts) a

c) _ involving vegetation
clearing; or
d) involving redirecting the

existing flow of surface or
ground water.

Lorelle ms
Relevant assessment criteria—
applicable code”’ if development
is self-assessable or requires
code assessment

  

 

Bushfire Hazard Areas

 

Reconfiguring a fot

Carrying out operational
work for reconfiguring a
lot

Exempt if the criteria for code
assessable do not apply

Code assessable if increasing the
number of lots or constructing a
new road within a Bushfire
Hazard Area as shown on
Overlay Maps OM1.4 - OM9.4

Natural Hazards Overlay Code

 

Flood Hazard Areas

 

Carrying out building
work not associated
with a material change
of use, except for a
Detached house

Carrying out building
work if relocation of a
building, except for a
Detached house

Reconfiguring a lot

Carrying out operational
works for reconfiguring
a lot :

Excavation or filling of
land not associated with
a material change of
use

Exempt if the criteria for code
assessable do not apply

Code assessable if on land
identified as Flood Hazard area
on Overlay Maps OM1.3—9.3

Natural Hazards Overlay Code

 

High and Low Potential Acid Sulfate Soils Areas

 

Alt

 

 

Exempt if the criteria for code
assessable do not apply

Code assessable if—
a) involving works on land at
or below 5m AHD”*: and
i. excavating 100m? or
more of material; or

 

Natural Hazards Overlay Code

 

5 OM1.4~79.4 identify land below 5m AHD and land between 5m AHD and 20m AHD. Figure 13.1 identifies development

that may require assessment.

13-510

Naturat Hazards and Natural Resources Overlays

 

Page 33

mae FS SF EH PeEegq@geeagseegggaingénma: = “

Map 1 - Landslip Hazard

 

PLANNING SCHEME REVIEW: Landslip Hazard in Noosa Shire
MO h:\andslip\mapping\layouts\map 1 .wor
Date: 23/1/96

 
 
 
 
 
 
 
 
 
  
 
 

This map is a reproduction from Noosa

Council's GIS and has been prepared for
strategic planning purposes. It is suitable
for reading at a scale of 1:25 000, however
accurate representation of boundaries over
individual allotments cannot be guaranteed

   

@ Significant Landslip Hazard Potential

CJ Negligible Landslip Hazard Potential

 

SCALE 1: 140 000

Page 34

escsotl dy/oe

a

BE89Eld dire

      

 

eqzzHayg
_g0zzdiovs

 

 

s3o/W

 

oS

CeTMTOTe

reg Ls

coed Oe di)
=

fe I I I _|
oe O¢ Ol

SS) esgpdldna/aggg0

 

oftyo Mtns th

Cj  *
2689¢1d4/8b Deze |

Page 35

 

 

xAR LAND USE SECTION FEES
ai MOXOS :

RECEIPT TYPE

SALE OF DOCUMENTS
Superseded Planning Scheme’ Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES oe
Material Change.of Use@CodeAmpact
ED 521
Neonsistent 521
Assessment under Superseded Planning Scheme 521
Modification to.a Development Permit . 521
Extension of a Currency Period : 521

Operational Works - Landscaping 521

@ ” Bldg Work assessable against the Planning Scheme a GO 521

PRE LODGEMENT REVIEW

Half Hour 522
One Hour 522
ADVERTISING
Purchase Advertised Applications §23
JETTIES
Jetty Application Fee 524
Jetty Bond 51
(Category 4)
BONDS
Performance Bond 51
(Category 9)
SIGNS .
Registration Fee ‘ . : 222
Orc: FEE
Search of Land Use Section file 12
Liquor Licensing Request 113

 

 

TOTAL $ ©5SQ

name: AT pletien Bovrerce ff
ADDRESS: QO Aenre Zo o

 

 

 

PELE AWD Aer cet 457%
FILENO: o7/ 2,7 4 DATE: _ Def pe for
RECEIPTNO: | ACT i Signature of TP Officer: 25 Aree.
(vA t

AUTHORITY NO:

 

17 [2eo7 [2094 [i

Page 36

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

 

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.