INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedute 2 of the
(P Requlation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management {OUM),

Fisheries matters

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of he above" to
Q21, the application requires assessment by the
Qepariment of Primary Industries and Fisheries
(DPI8F).

If an agency other than OPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
telation to items {i) - (iv) and an advice agency
In relation to item {v).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick appiicable boxes) -
(0 (i) amaterial change of use of premises —
{a) in a Major Development Area in the Urban Footprint for -
OC (i) anurban activity -
(2 inanarea included in a structure plan where the IPA, section 3.1.6
applies;
(2s inan area not included in a structure plan where -
+ the IPA, section 3.1.6 applies to the application for the material change

of use; or
the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
( (ii) intensive animal husbandry; or

C (ii) residential development involving a rural residential purpose

.
.

(b) in the Regional Landscape and Rural Production Area for -
© (i) anurban activity and not specified in section 2.4(2); or
(1 (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the investigation Area for -
© (i) anurban activity and not specified in section 2.10(2);

0 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

(1 (ili) intensive animal husbandry

1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
{a) not included in a structure plan; and

(b) not specified in section 3.1(2).
wt (iii) none of the above
21. The application involves: (tick the applicable boxes)

C1 (i) an assessable material change of use for aquaculture - complete Part Os of Form 1;

C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O: of Form 1,

CU (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1,

(1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part Oz of Form 1;

[1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;
none of the above.

wi

 

 

Page 7

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.