CODE FOR DEVELOPMENT ON STEEP OR UNSTABLE LAND
1.0 Introduction
We advise that Don Stanfield, practising as a geotechnicat engineer, has examined the
above site and assessed it with respect to acceptable measures outlined in the Code for
Landslip Hazard in Noosa Shire.
2.0 Findings
2.1 Geology & Soils
The geology of this site is shown on Queensland Geological Survey maps as being Qhb ~
Quarternary. The soils in this region are shown as being parabolic dune systems (quartz
sand].
Our soil testing on this site confirmed the above. The slip hazard or zoning for this site
would be considered to be negligible on the flatter region of the garage/house site
increasing to low or moderate risk towards the gully.
From the Noosa Shire Planning Scheme Review Project Map | — Landstip Hazard, the
subject lot is within area designated “Significant Landslip Hazard Potential”.
2.2 Soil Profiles
The report reference no. 278118-S! details the soil profile for this site. Some fill was noted
near the house and also the presence of septic trenches or other form of subsoil drainage.
The natural soils were predominantly dune sand of fine to medium grained, poorly graded.
It appears that this soil profile is consistent of soil types in this area.
2.3 Proposed Site Works
Negligible earthworks will be required for the proposed site to provide the deck extension.
The overall earthworks would have a volume well less than 50m3.
We recommend the following work to be undertaken:
e Surface runoff water should discharge to spoon drains.
« Subsurface cut off drains or grates beside the proposed extension only as required, to
intercept seepage water.
e Batters to cut or fill embankments are not to exceed a slope of 1 vertical to 2 horizontal.
¢ On the battered slopes mulch and plant with varieties to minimise soil erosion.
« At the ends of the spoon drains provide plantings and place rock spails to disperse any
concentrated flow to minimise erosion.
« Where batters are likely to exceed the above slopes due to the slope of the site, provide
a line of rock boulders at the toe to reduce embankments.
2.4 Footings & Slabs
The footing design requires foundations through the natural soil profile and weil into the
natural soil profile. We recommend a minimum depth of 1500mm. During construction we
recommend that the soil profiles be verified and footing details confirmed.
PROPOSED NEW RESIDENCE PAGE 1 OF 2 2 October 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.