INTEGRATED PLANNING ACT 1997

State-controlled road matters

For more information refer to Guide 3,

Unless you answered “none of the above" to Q2,
the appticalion triggers referral to the Department
of Main Roads (DMR) as a referral agency,

In certain circumstances OMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the [P Requlation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

 

2.

The

application involves: (tick applicable box/es)

(DAS Assessment Checklist. Version 20, 2 April 2007

(1) development on tand contiguous* to a State controlled road and for -
(1 (a) material change of use assessable against the planning scheme:

0 (0) recontiguring a tot unless -

« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
LC (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b} above)-
* associated with access to a State-controlled road; or

« for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a

State-controlled road.

[2] (ji) development on iand not contiguous to a State-controlled road and -

( (a) material change of use ~

« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by

that schedule;

(J (b) reconfiguring a lot for a purpose mentioned in schedule of the IP regulation
and exceeding the thresholds set by that schedule;
C1 (c} operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b) above)—
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

that schedule.

Hii none of the above

 

Clearing vegetation
For more information refer to Guide 12,

Unless you answered “none of the above” to Q3,
the application requires assessment by the

Oe, jatural ind Wi

(NRW).

{fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter,

if you ticked Q3(i) or (ii), your application requires:
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not,

The

application involves: (tick applicable box/es)

CI (i) material change of use -
(a) assessable against the planning scheme:

Qii

Dit)

(b) on a lot containing -

* acategory 1, 2 or 3 area shown on a properly map of assessable vegetation; or

« if there is no property map of assessable vegelation for the jot - remnant vegetation;
(c} where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

ii) reconfiguring a lot -

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for

the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of

Form?

iw none of the above.

 

Strategic port land

For more information refer to Guide 41.

If you ticked (i) - the retevant Port Authority is the
assessment manager for the application.

if you ticked (ji) Queensland Transport is a
concurrence agency for the application.

 

The

application involves:

CO (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI

Act) - complete Part t of Form 1

LD (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port !and - complete Part ! of Form 1

chi

iii) none of the above

 

4 Land contiguous to a State-contolled road is defined in schedule 14 of the IP Regulation to mean land - if part of the tand is within 100m of the State-convolled road, or that is part of a future State-

controlled road.

Page 2

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.