Original source · versioned page text
DA Form 1 & Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnenvironmental offsets.
Yes — the development application involves premises in the koala habitat area in the koala priority area
Yes — the development application involves premises in the koala habitat area outside the koala priority area
ite: If a koala habitat area determination has been obtained for this premises and is current over the land, it should be provided as part of this
development application. See koala habitat area guidance materials at www.des.qid.gov.au for further information.
NAT ttel kel)
23.6) Does this development application involve taking or interfering with underground water through an artesian
or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking overland flow
water under the Water Act 2000?
Yes — the relevant template is completed and attached to this development application and | acknowledge that a
@” authorisation or licence under the Water Act 2000 may be required prior to commencing development
fe: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au for further information.
DA templates are available from https:/planning.dsdmip.gid.gov.au/. If the development application involves:
* Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 7
* Taking or interfering with water in a watercourse, lake or spring: complete DA Form1 Template 2
* Taking overland flow water: complete DA Form 1 Template 3.
Waterway barrier works
.7) Does this application involve waterway barrier works?
Yes — the relevant template is completed and attached to this development application
templates are available from https://planning.dsdmip.qid.gov.au/. For a development application involving waterway barrier works, complete DA
Form 1 Template 4.
Yes — an associated resource allocation authority is attached to this development application, if required under the
Fisheries Act 1994
hy) See guidance materials at www.daf.gid.gov.au for further information.
— | acknowledge that a quarry material allocation notice must be obtained prior to commencing development
10,
fote: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au and www.business. qid.gov.au for further
information.
Yes — | acknowledge that a quarry material allocation notice must be obtained prior to commencing development
Note: Contact the Department of Environment and Science at www.des.gid.gov.au for further information.
Yes — the ‘Notice Accepting a Failure Impact Assessment’ from the chief executive administering the Water Supply Act
is attached to this development application
n) : See guidance materials at www.dnime.gid.gov.au for further information.
Yes — the following is included with this development application:
Evidence the proposal meets the code for assessable development that is prescribed tidal work (only required if
application involves prescribed tidal work)
A certificate of title
as
See guidance materials at w.des. gid. gov.au for further information.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.