Original source · versioned page text
Dual Occupancy 55 Planning Report
6.7 Engineering The documentation provides a stormwater management plan and report which complies with the Planning Scheme, treating the water prior to entering Lake Doonella. A swept path diagram plan has also been provided that demonstrates that a B99 vehicle can park and enter and exit the site in a forward gear. Then swept paths are provided in Appendix C. 6.8 Applicable Overlay Codes The Planning Scheme includes a number of overlays which provide additional information in relation to local interests. The site is subject only to the Flood Overlay which requires the development to meet a minimum floor level. The proposed floor level is 2.8m AHD which meets this requirement. RG Strategic Town Planning Report – 55 Dual occupancy 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.