Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Concurrence Agency Response - DTMR - OPW11/0116.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

                 RE: Noosa River Spit Erosion Protection Works               -
                                                                                 Permanent Navigational
                 Requirements [)
                 Rick a Bertram    to: Andrew Brown                                        28/02/201212:08 PM
                 Cc: Peter E Kleinig, Glenn N Hale, Richard C Johnson



Hello Andrew,


As discussed in our recent telephone conversation, I have undertaken a site visit of construction works
on the Noosa   Spit.

Maritime Safety Queensland’s aids to navigation requirements for the completed works are as follows.


1.    There are no MSQ requirements for aids to navigation on the training wall. The wall is above the
      high water mark and would be clearly visible during daylight hours. As discussed if council wishes
      to install a downward facing solar street type light, MSQ would have no objection as long as the

      light was shielded so as not to create a hazard to boaters.
2.    MSQ will require a series of temporary buoys to be placed on the seaward side of the sunken wall.
      There is to be three SLB700 type buoys placed approximately 5 metres from the wall so as to
      mark the extremities and centre of the wall. The buoys are to be yellow in colour and have the
      words ’OBSTRUCTION’clearly displayed on all four sides of the top mark. The is no requirement
      for a light on the buoys.


MSQ is able to supply and install the buoys on your behalf and enter into an agreement for a
maintenance program if this is suitable to you. I will be able to supply a quote for these works early
next week.


It is envisaged that the buoys will only be required until the sand has backfilled the beach out to the
sunken wall. Once this has been achieved the buoys can be removed.




Thank you




Rick Bertram
AlArea Manager (Sunshine Coast) 1 Marine Operations (Brisbane)
Maritime Safety Queensland 1 Department of Transport and Main Roads

Mooloolaba Old Pilot Station 11 Parkyn Parade 1 Mooloolaba Old 4557
PO Box 1094 1 Mooloolaba Old 4557
P: (07)547784191 F: (07)54446697
M: 0419778166
E: [email protected]
W: www.msg.gld.gov.au
Tomorrow’s Queensland: strong, green, smart, healthy and fair www.toward02.gld.gov.au
                                                                      -




~ Please consider the environment before printing this email



     Andrew Brown          IRiCk, Thanks for the response. No dramas ab...               23/02/201211 :40:21 ~M


From:             Andrew Brown <[email protected]>
To:               "[email protected]" <[email protected]>
Date:             23/02/2012 11:40 AM
Subject:          RE: Noosa River Spit Erosion Protection Works   -
                                                                      Permanent Navigational Requirements




Rick,

Thanks for the response. No dramas about leaving it till Monday,

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Concurrence Agency Response - DTMR - OPW11_0116.01.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.