_19660_OPW_20260616 Civil Plans

of 30

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                                                                                 GENERAL NOTES                                                                                                                   9.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                   EXISTING PAVEMENT:                                                                                                     7.     DRAINAGE LAYER MATERIAL SHALL BE A CLEAN, FINE GRAVEL, SUCH AS 2-5mm WASHED SCREENINGS.
                                                                                                 1.    DO NOT SCALE DRAWINGS.                                                                                                          DISPOSED OF. TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                        6.   WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS PER            8.     IT IS RECOMMENDED THAT FILTER MATERIAL BE LIGHTLY COMPACTED DURING INSTALLATION TO PREVENT MIGRATION
                                                                                                 2.    ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.                                                                                                                                                             STANDARD DRAWING IPWEAQ RS-170.                                                                                         OF FINE PARTICLES.
                                                                                                                                                                                                                                 SUBSOILS:                                                                                                                        THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF THIS PROCEDURE.                                        IN SMALL SYSTEMS, A SINGLE PASS WITH A VIBRATING PLATE PLATE SHALL BE USED TO COMPACT THE FILTER MEDIA,
                                                                                                 3.    THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE                                                                                                                                                                                                                                                                                       WHILE IN LARGE SYSTEMS, A SINGLE PASS WITH ROLLER MACHINERY (E.G. A DRUM LAWN ROLLER) SHALL BE
                                                                                                       CLARIFICATION OF THE DISCREPANCY.                                                                                         10.   ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE THE                7.   ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                  APPLICATION OF SEAL.                                                                                                    PERFORMED. UNDER NO CIRCUMSTANCE SHOULD HEAVY COMPACTION OR MULTIPLE PASSES BE MADE.
                                                                                                 4.    THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE                                      RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.
                                                                                                                                                                                                                                                                                                                                                             8.   AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT                9.     UPON COMPLETION, THE CONTRACTOR SHALL UNDERTAKE IN-SITU TESTING TO DEMONSTRATE THE FILTER MEDIA
                                                                                                       SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.                                                                                                                                                                                                                                                                                                                     MEETS THE HYDRAULIC CONNECTIVITY REQUIREMENTS (100-500mm/hr). THE HYDRAULIC CONNECTIVITY OF THE FILTER
                                                                                                                                                                                                                                                                                                                                                                  WITH A MINIMUM THICKNESS OF 100mm.
                                                                                                 5.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT                         SUBGRADES:                                                                                                                                                                                                                                               MEDIA SHALL BE CHECKED AT A MINIMUM OF THREE POINTS WITHIN THE SYSTEM.
                                                                                                       AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY                                                                                                                                                     9.   IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS, A PRIMER SEAL SHALL BE PLACED OVER THE
                                                                                                                                                                                                                                 11.   SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE ADEQUACY                         AFFECTED AREA.                                                                                                   10.    OPERATIONS AND MAINTENANCE SHALL BE CONDUCTED IN ACCORDANCE WITH THE "MAINTAINING VEGETATED
                                                                                                       AND THE SUPERINTENDENT.                                                                                                         OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.                                                                                                                                                                                                    STORMWATER ASSETS" GUIDELINES, PUBLISHED BY 'HEALTHY WATERWAYS'.
                                                                                                 6.    NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN                                                                                                                                                 10.   WHERE EXISTING ISLANDS ARE TO BE REMOVED, PRIOR TO THE OVERLAY THE CONTRACTOR MUST ENSURE BY
                                                                                                                                                                                                                                 12.   THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A LOADED WATER                          INSPECTION/INVESTIGATION THAT PAVEMENT MATERIAL EXISTS BENEATH OR OTHERWISE UNDERTAKE PATCH.
                                                                                                       OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF
                                                                                                       CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE                                DEFORMATION UNDER PROOF-ROLLING. ANY SOFT SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND
                                                                                                       REQUIREMENTS THEREOF.                                                                                                           REPLACED WITH SELECT FILL.
                                                                                                 7.    ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                 13.   THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING THIS                     SIGNS AND LINEMARKING
                                                                                                 8.    A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS, WHERE POSSIBLE.                                       INSPECTION.                                                                                                          1.    ALL ROAD SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL
                                                                                                 9.    THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF                                                                                                                                                         DEVICES (MUTCD), PUBLISHED BY THE DEPARTMENT OF MAIN ROADS.
                                                                                                       THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                           STOCKPILE MANAGEMENT:                                                                                                       2.   ALL SIGNS SHALL BE SIZE 'A' UNLESS NOTED OTHERWISE.
                                                                                                 10.   WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND                         14.   CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A                       3.   SIGNS LOCATED WITHIN MEDIANS OR TRAFFIC ISLANDS TO BE INSTALLED USING LOC SOCKET.
                                                                                                       SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                                                               GUTTER, DRAIN OR WATER BODY, SUCH AS:                                                                                 4.   ALL SIGN FOOTINGS TO BE CONCRETE IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-131.
                                                                                                 11.   THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;                                                                           ● ON A ROAD PAVEMENT;
                                                                                                        ● CONSTRUCTION PRE-START MEETING                                                                                                ● WITHIN AN OVERLAND FLOW PATH;                                                                                      5.   ALL ROAD SIGNS TO BE OFFSET A MINIMUM OF 600mm FROM FACE OF KERB.
                                                                                                        ● SET OUT                                                                                                                       ● ADJACENT TO STREAM BANKS.                                                                                          6.   THE FINAL SIGN LOCATION IS TO BE AGREED ON SITE, TO ENSURE IT IS VISIBLE AND NOT OBSTRUCTED BY EXISTING
                                                                                                        ● DEMOLITION                                                                                                             15.   CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM                               INFRASTRUCTURE OR VEGETATION ETC.
                                                                                                        ● SUBGRADE PROOF-ROLLS                                                                                                         STOCKPILES CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                 7.   ALL SIGNS SHALL BE MANUFACTURED, AND INSTALLED IN ACCORDANCE WITH MRTS14.
                                                                                                        ● PRE-SEAL PROOF-ROLLS
                                                                                                        ● CONCRETE PRE-POURS                                                                                                     16.   ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT
                                                                                                        ● FINAL INSPECTION                                                                                                             CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.

                                                                                                 12.   THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                                                                                                                                                 TRAFFIC MANAGEMENT
                                                                                                       ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF                            SITE REHABILITATION:                                                                                                       1.    NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED TRAFFIC CONTROL
                                                                                                       PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.                                                                      17.   ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                           PLAN.
                                                                                                 13.   FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE                                  COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                     2.   THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE
                                                                                                       SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                                         18.   SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                            WITHIN THE APPROVED HOURS STIPULATED.
                                                                                                                                                                                                                                       MINIMUM DEPTH OF 300mm.                                                                                               3.   THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED
                                                                                                                                                                                                                                 19.   TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                    TRAFFIC CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
                                                                                                 SURVEY                                                                                                                          20.   ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                    4.   THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC
                                                                                                 1.    THIS DESIGN IS BASED ON SURVEY PROVIDED BY BRIAN NAISMITH CONSULTING SURVEYOR.                                                                                                                                                                             MANAGEMENT ISSUES.

                                                                                                 2.    ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                                                                                                                                                      5.   ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS,
                                                                                                                                                                                                                                                                                                                                                                  INCLUDING MOTORISTS AND PEDESTRIANS.
                                                                                                 3.    THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.                               EROSION & SEDIMENT CONTROL
                                                                                                 4.    ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND                          OBJECTIVES:
                                                                                                       ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.                                                               1.    THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE
                                                                                                                                                                                                                                                                                                                                                             STORMWATER DRAINAGE
                                                                                                                                                                                                                                       REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
                                                                                                                                                                                                                                                                                                                                                            GENERAL
                                                                                                                                                                                                                                 2.    THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND
                                                                                                 EXISTING SERVICES                                                                                                                     MAINTENANCE PERIOD.                                                                                                  1.    EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH STANDARD
                                                                                                                                                                                                                                                                                                                                                                  DRAWING IPWEAQ DS-030 (TYPE 2).
                                                                                                 1.    THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL                           3.    EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.
                                                                                                       BEFORE YOU DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                                                                                                                                                             2.   ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.

                                                                                                 2.    THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE                                                                                                                                                  3.   ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                                                                                                                                                                 MANAGEMENT PRINCIPLES:
                                                                                                       ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.                                                                                                                                                                                                      STANDARD DRAWING IPWEAQ DS-019.
                                                                                                                                                                                                                                 4.    THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE
                                                                                                 3.    NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                                                                                                                                                 4.   ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                                                                                                                                                                                       EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                                                                                                                                                                                  WITH STANDARD DRAWING IPWEAQ DS-020.
                                                                                                 4.    THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING                               (IECA). THE BASIC PRINCIPLES ARE TO:
                                                                                                       WORKS.                                                                                                                            ● MINIMISE THE AREA OF DISTURBANCE;                                                                                 5.   THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND
                                                                                                                                                                                                                                         ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                      STRUCTURES.
                                                                                                 5.    NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE
                                                                                                                                                                                                                                         ● MINIMISE EROSION;                                                                                                 6.   ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                                       APPROPRIATE AUTHORITIES.
                                                                                                                                                                                                                                         ● MINIMISE SEDIMENTATION;
                                                                                                 6.    EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE NECESSARY                                                                                                                                                7.   THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN
                                                                                                                                                                                                                                         ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
                                                                                                       TO SUIT FINAL FINISHED SURFACE LEVELS.                                                                                                                                                                                                                     ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                                                                                                                                                                                                                                                                                                                                             8.   THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                                                                                                                                                                                                                 CONSTRUCTION PRE-START MEETING:                                                                                                  TRENCHES AND STRUCTURES.
                                                                                                                                                                                                                                 5.    THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH                 9.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                                                                                 CLEARING, GRUBBING AND DISPOSAL
                                                                                                                                                                                                                                       AS:                                                                                                                        STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                                 1.    CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND SEDIMENT                              ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                       CONTROL MEASURES.                                                                                                                                                                                                                                    10.   THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                                                                                                                                                                                                                        ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                       THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION OF THESE CONTROL MEASURES.                                                                                                                                                             FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                                                                                                                                                                        ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
                                                                                                 2.    CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                                  ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;                                                                  11.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                                                                                                                                                                                                        ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;                                                                      CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                 3.    ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.
                                                                                                                                                                                                                                        ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.                                                          CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                                                                 4.    WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.                                                                                                                                                                                   PARTIES.
                                                                                                 5.    CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.                                                                                                                                                     12.   UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                                                                                                                                                                                                 SITE INSPECTION AND MONITORING:
                                                                                                 6.    A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.                                                                                                                                                                                        BLOCKAGES.
                                                                                                                                                                                                                                 6.    CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF
                                                                                                 7.    CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE                                CONTROL MEASURES (E.G. SITE FOREMAN).
                                                                                                       REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                                                                                                                                                      SUBSOIL DRAINAGE
                                                                                                                                                                                                                                 7.    ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                 8.    DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE                               ● AT LEAST DAILY WHEN RAIN IS OCCURRING;                                                                            13.   SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED IN ACCORDANCE WITH MRTS03.
                                                                                                       LOCAL AUTHORITY.                                                                                                                 ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);                                                          14.   SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                                                                 9.    CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN INTERIM                               ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
                                                                                                                                                                                                                                                                                                                                                            15.   SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50m.
                                                                                                       STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.                                                ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                                                                                                                                                                                                                                                                                            16.   THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100m.
                                                                                                                                                                                                                                 8.    CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW
                                                                                                                                                                                                                                       CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.                                            17.   THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE OUTLET.

                                                                                                 EARTHWORKS / EXCAVATION                                                                                                         9.    CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
                                                                                                 GENERAL:                                                                                                                        10.   WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE
                                                                                                                                                                                                                                       MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.                                       BIORETENTION BASIN
                                                                                                 1.    ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.
                                                                                                                                                                                                                                 11.   THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY CORRECTIVE                  1.    ALL BIORETENTION BASINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 'WATER BY DESIGN' GUIDELINES.
                                                                                                 2.    ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE
                                                                                                                                                                                                                                       ACTIONS TAKEN.                                                                                                        2.   THE CONTRACTOR SHALL PROVIDE COPIES OF ALL DELIVERY DOCKETS AND SUPPLIER'S CERTIFICATES FOR THE
                                                                                                       UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN
                                                                                                       STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                                                                                                                                                             DRAINAGE MEDIA MATERIALS.
                                                                                                       ENGINEER.                                                                                                                                                                                                                                             3.   THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED TO ENABLE CERTIFICATION:
                                                                                                 3.    ALL EARTHWORK FILLING SHALL BE CARRIED OUT IN ACCORDANCE WITH LEVEL 2 AS3798 COMPACTION STANDARD.                         ROAD PAVEMENT                                                                                                                     ● EARTHWORKS AND FUNCTIONAL STRUCTURES
J:\2019\19660SD1_SUBDIVISION_POTTERY_STREET_POMONA_\4.CADD\#ACAD\2.OPW\#19660_CI_OPW.dwg




                                                                                                                                                                                                                                                                                                                                                                   ● UNDER-DRAINAGE
                                                                                                 4.    STOCKPILES SHALL BE COVERED WITH TARPS.                                                                                   GENERAL:
                                                                                                                                                                                                                                                                                                                                                                   ● BIORETENTION MEDIA (DRAINAGE LAYER, TRANSITION LAYER AND FILTER MEDIA)
                                                                                                 5.    EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.                             1.    ASPHALT PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS30.                                                   ● FINISHED LEVELS
                                                                                                 6.    ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF                          2.    WHERE APPLICABLE, THE ASPHALT OVERLAY IS TO BE TIED-IN NEATLY TO THE KERB AND CHANNEL FOLLOWING EDGE                        ● COARSE SEDIMENT FOREBAY
                                                                                                       EARTHWORKS.                                                                                                                     PLANING.                                                                                                                    ● PROTECTIVE MEASURES
                                                                                                                                                                                                                                                                                                                                                                   ● LANDSCAPE INSTALLATION
                                                                                                 7.    EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                         3.    UNBOUND PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS05.
                                                                                                                                                                                                                                                                                                                                                             4.   A WASHED, WELL-GRADED SAND WITH AN APPROPRIATE HYDRAULIC CONNECTIVITY SHALL BE USED AS THE FILTER
                                                                                                                                                                                                                                 4.    BASE COURSE AND SUB BASE TO BE STEPPED, AT JOINT BETWEEN EXISTING AND PROPOSED PAVEMENT, IN
                                                                                                                                                                                                                                                                                                                                                                  MEDIUM.
                                                                                                 TOPSOIL:                                                                                                                              ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-170.
                                                                                                                                                                                                                                                                                                                                                             5.   THE TOP 100mm OF THE FILTER MEDIUM SHALL BE ENHANCED WITH APPROPRIATE ORGANIC MATTER, FERTILISER AND
                                                                                                 8.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY                       5.    ALL PAVING OPERATIONS INCLUDING MATERIAL SUPPLY, CONSTRUCTION PROCEDURES AND TESTING REQUIREMENTS
                                                                                                                                                                                                                                                                                                                                                                  TRACE ELEMENTS.
                                                                                                       ROOT AFFECTED AREAS MUST BE REMOVED.                                                                                            SHALL BE IN ACCORDANCE WITH TMR STANDARDS AND SPECIFICATIONS.
                                                                                                                                                                                                                                                                                                                                                             6.   TRANSITION LAYER MATERIAL SHALL BE A CLEAN, WELL-GRADED SAND MATERIAL CONTAINING <2% FINES.




                                                                                           COPYRIGHT ©                                                                                       Associated Consultants                         Client                                                                                                          Drawn                    Verified                  Project                                                                   Drawing Title                                                                Scale                   Sheet Size
                                                                                                                                                                                             SURVEYOR                                                                                                                                                       KL                       DR
                                                                                           This drawing is subject to
                                                                                           copyright in accordance with                                                                      Brian Naismith Development Consultant
                                                                                                                                                                                                                                            SURVEYOR PTY LTD                                                                                                                                                   30 POTTERY STREET, POMONA                                                 PROJECT NOTES                                                                                              A1
                                                                                           the agreement between TOD                                                                                                                                                                                                                                        Designed                 Verified
                                                                                           Consulting Pty Ltd (tc) and tc's                                                                  T: 0477 925 871 E: [email protected]                                                                                                                   KL                       DR                        PROPOSED RESIDENTIAL SUBDIVISION                                          SHEET 1 OF 2                                                                 Drawing Number
                                                                                           client. This drawing shall only
                                                                                           be used for this specific project.                                                                                                                                                                                                                               Approved                 RPEQ No                   RP DESCRIPTION       LOT 496 MCH 591                                                                                                                            19660-C002
                                                                                           This drawing shall not be used                                                                                                                                                                          Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D REYNOLDS               9072                      LOCAL AUTHORITY      NOOSA COUNCIL
                                                                                                                                 B    16.06.26   OPW INFORMATION REQUEST              KL                                                                                                                                                                                                                       MCU APPROVAL         -                    HORIZ DATUM GDA2020 Z56                           0     10     20     30    40     50      60                Sheet                    Revision
                                                                                           for construction until marked as                                                                                                                                                                                   PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                                 A    03.11.25   OPW SUBMISSION                       KL                                                                                                                                                                                                                       ROL APPROVAL         RAL19/0014           VERT DATUM AHD
                                                                                           'Issued For Construction' in the
                                                                                           revision description.                Rev    Date      Revision Description               Drawn
                                                                                                                                                                                                                                                                                                   [email protected]     www.todconsulting.com
                                                                                                                                                                                                                                                                                                                   ABN 39 128 805 336                                                               16.06.26   OPW APPROVAL                              RL DATUM                                              MEASUREMENT BAR - INCREMENTS IN mm                             2 of 19               B

Log in to download the original (_19660_OPW_20260616 Civil Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.