Council archive · source document
OPW15/0035 Operational Works application for driveway relocation
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
OPWIEJO035 7 ge [1 byiteg, we Department of State Development, Infrastructure and Planning & IDAS form 1—Application details (Sustainable Planning Act 2009 version 4.1 effective 4 July 2014) This form must be used for ALL development applications. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. eerie ee = For all development applications, you must: Development Cou nter e complete this form (IDAS form 1—Application detail$) e complete any other forms relevant to your application 16 MAR 2015 le ° provide any mandatory supporting information identified on the forms as being required to accomp ny your application. Tewantin yi Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2008 (SPA) or the Sustainable Planning Regulation 2009. This form and any other IDAS form relevant to your application must be used for development applications relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. PLEASE NOTE: This form is not required to accompany requests for compliance assessment. This form can also be completed online using MyDAS at www.dsdip.qid.gov.au/MyDAS . Mandatory requirements Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS*application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) ow Name/s (individual or company name in full) Geoffrey Hamilton Acton For companies, contact name . Postal address 9 Weyba Esplanade Suburb Noosa Heads State Queensland Postcode 4567 Country Australia Contact phone number [ 0409 622 987 | Mobile number (non-mandatory requirement) | 0409 622 987 | Fax number (non-mandatory requirement) | nia % | Great state. Great opportunity. oes jueensiane Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 29 pages
Page 2
Email address (non-mandatory requirement) geremida Applicant's reference number (non-mandatory nia requirement) @ gmail.com Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.) a) b) ¢) What is the nature of the development? (Please only tick one box.) CO Material change of use C] Reconfiguring a lot O Building work X Operational work What is the approval type? (Please only tick one box.) Cl Preliminary approval C] Preliminary approval Development permit under s241 of SPA under s241 and s242 of SPA Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) Driveway relocation — not self-assessable type . Whatis the level of assessment? (Please only tick one box.) o L_] impact assessment Code assessment Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C— Additional aspects of the application.) a) b) What is the nature of development? (Please only tick one box.) C] Material change of use C] Reconfiguring a lot LC Building work : C Operational work What is the approval type? (Please only tick one box.) LJ Preliminary approval CO Preliminary approval CL Development under s241 of SPA under s241 and $242 permit of SPA Provide a brief description of the proposal, including use definition and number of buildings or structures where applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.) ® What is the level of assessment? ‘ im Impact assessment C] Code assessment Table C—Additional aspects of the application (If there are additional aspects to the application please list in a separate table on an extra page and attach to this form.) Ol Refer attached schedule <| Not required IDAS form 1-—-Application details Version 4.4-—-4 July 2014
Page 3
Table D--Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or adjacent to the premises (Note: this table is to be used ‘for applications involving taking or interfering with water). (Attach a separate schedule if there is insufficient space in this table.) . | Street address and lot on plan (All lots must be listed.) O Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.) Street address Lot on plan Local government area . description (e.g. Logan, Cairns) Lot Unit Street Street name and official Post- Lot no. Plan type . no, no. suburb/ locality name code and plan no. i) 9 Weyba Esplanade, 4567 4 RP125028 | Noosa Noosa Heads ii) . iii) Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a separate row in the below table. Non-mandatory) Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s i) ii) iii) Table E—Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient space in this table.) Coordinates Zone Datum Local government (Note: place each set of coordinates in a separate row) reference e area (if applicable) Easting Northing Latitude Longitude (] cpage « [] wess4 CL other Approx 720 sq m Residential house IDAS form 1-—Appiicatian details Version 4.1—4 July 2014
Page 4
No [-] Yes—provide details below © List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) No . | Yes—complete either Table F, Table G or Table H as applicable Table F Name of owner/s of the land MWe, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date Table G Name of owner/s of the land ‘ CO The owner’s written consent is attached or will be provided separately to the assessment manager. Table H Name of owner/s of the land : ia By making this application, |, the applicant, declare that the owner has given witten consent to the making of the application. Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table | On strategic port land under the Transport Infrastructure Act 1994—complete Table J In a tidal water area—complete Table K On Brisbane core port land under the Transport Infrastructure Act 1994 (No table r@quires completion.) On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion) OOOOO00 Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 (no table requires completion) Table | Name of water body, watercourse or aquifer * IDAS form 1—Appiication details Version 4.14 July 2014
Page 5
Table J Lot on plan description for strategic port land : Port authority for the tot Table K Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable) [x] No C Yes—ensure the type, location and dimension of each easement is incfided in the plans submitted [] No ><] Yes—ensure the nature, location and dimension of proposed works are included in plans submitted [x] No—go to question 12 L] Yes . C] Yes=complete Table L and submit with this application the yellow local government/privaté certifier’s copy of thé receipted QLeave form 6 Table L Amount paid Date paid QLeave project number (6 digit number (dd/mmiyy) starting with A, B, E, L or P) No [_] Yes—please provide details below Name of local government Date of written notice given | Reference number of written notice given by local government by local government (if applicable) (dd/mm/yy) e IDAS form 1--Application details Version 4. fom4 July 2014
Page 6
Description of attachment or title of attachment Method of lodgement to assessment manager IDAS Form 6 ‘ hard Lopy tI By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to provide false or misleading information) , Notes for completing this form ° ¢ Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application. Note, the assessment manager has discretion to accept an application as properly made despite any non- compliance with the requirement to provide mandatory supporting information under section’*260(1)(c) of the Sustainable Planning Act 2009 Applicant details ¢ Where the applicant is not a natural person, ensure the applicant entity is a real legal entity. Question 1 : ¢ Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of assessment. Where schedule 3 identifies assessable development as “various aspects of development” the applicant must identify each aspect of the development on Tables A, B and C respectively and as required. Question 6 * Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. If a development application relates to a state resource, the application is got required to be supported by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state resource is a separate process and will need to be obtained before development commences. Question 7 e Ifthe premises is listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies where compliance assessment is required. : Question 11 ¢ The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. « The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. ° & IDAS form 1-—Application detaits Version 4.1-—-4 July 2014
Page 7
Question 12 e The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. * Building and construction industry notification and payment forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. For further information contact QLeave on 1800 803 481 or visit www.qleave.qid.gov.au. Privacy—The information collected in this form will be used by the Department of State Development, Infrastructure and Planning (DSDIP), assessment manager, referral agency and/or building certifier in a@tordance with the processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of the IDAS process or the provisions about public access to planning and development information in the Sustainable Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in relevant databases. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received [ Reference numbers NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Council. | have been engaged as the private certifier for the building work referred to in this application BSA Certification license Building Date of engagement | Name number classification/s QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if applicable.) Date receipted form sighted by assessment manager Name of officer who sighted the form QLeave project Amount paid Description of the work number (8) Date paid The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. . Department of State Development, Infrastructure and Planning PO Box 15009 City East Qld 4002 tel 13 QGOV (13 74 68) [email protected] www.dsdip.qid.gov.au IDAS form t-—Application detalis _ Version 4.1—4 July 2014
Page 8
& Department of State Development, Infrastructure and Planning IDAS form 6—Building or operational work assessable against a planning scheme (Sustainable Planning Act 2009 version 3.0 effective 1 July 2013) This form must be used for development applicati6ns for-building-work.or. operational | work assessable against a planning scheme. Development Coun You MUST complete ALL questions that are/stated to be a mandatory requreeie unless otherwise identified on this form. ° 16 MAR 2015 For all development applications, you must: : e complete /DAS form 1—Application details Tewa nti n e complete any other forms relevant to y' plicatio. e provide any mandatory supporting information identified on the forms as being required te accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form must be used for building work or operational work relating on strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. This form can also be completed online using MyDAS at www.dsdip.qid.gov.au/MyDAS | Mandatory requirements 1. What is the nature of the work that requires assessment against a planning Shomee (Tick all applicable boxes.) C] Building work—complete Table A Xx Operational work—complete Table B Table A a) Whatis the nature of the building work (e.g. building, repairing, altering, canara. moving or demolishing a building)? b) Are there any current approvals associated with this application? (e.g. material change of use.) [] No L_] Yes— provide details below. ° List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) & Great state. Great opportunity. Queensland = Government
Page 9
a)
b)
Table B
What is the nature of the operational work? (Tick all applicable boxes.)
(-] Road works {| Stormwater [_] Water infrastructure
([] Drainage works [| Earthworks ([_] Sewerage infrastructure *
[_] Landscaping []_ Signage [] _ Clearing vegetation under the planning scheme
{X] Other—provide details | Residential Driveway Relocation
\s the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
J No [| Yes—specify the number of lots being created
No [(] Yes—provide details below
c) Are there any current approvals associated with this application? (E.g. material change of use.)
.
List of approval reference/s Date approved (dd/mm/yy)
Date approval
e
lapses (dd/mm/yy)
Mandatory supporting information
Mandatory supporting information
Confirmation of | Method of
recommended scales) which shows the following:
the location and site area of the land to which the application relates
(relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any propdsed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points qn the relevant land.
lodgement Jodgement
All applications involving building work or operational work 5
Asite plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are X Confirmed
IDAS form 6—Building or operational werk assessable
against a planning scheme
Version 3.0—1 July 2013
©
Page 10
A statement about how the proposed development addresses the local Confirmed government's planning schemes and any other planning documents relevant : to the application. A statement addressing the relevant part(s) of the State Development Cl Confirmed Assessment Provisions (SDAP). & Not applicable Applications for building work (including extensions and demolition that i Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are recommended scales) which show the following: e the north point C) Confirmed Not applicable ¢ the intended use of each area on the floor plan (for commercial, industrial ® or mixed use developments only) e the room layout (for residential development only) with all rooms clearly labelled . the existing and the proposed built form (for extensions only) e the gross floor area of each proposed floor area. Elevations drawn to an appropriate scale (1:100, 1:200.or 1:500 are Confirmed tecommended scales) which show plans of all building elevations and facades, clearly labelled to identify orientation (e.g. north elevation). Not applicable Plans showing the size, location, proposed site cover, proposed maximum number of storeys, and proposed maximum height above natural ground level of the proposed new building work. ] Confirmed Not applicable Plans showing the extent of any demolition that is assessable development. L] Confirmed DX] Not applicable Applications for operational work involving earthworks (filling and excavating) Drawings showing: e existing and proposed contours © areas to be cut and filled ¢ the location and level of any permanent survey marks or reference stations used as datum for the works e the location of any proposed retaining walls on the relevant land and their height e the defined flood level (if applicable) e the fill level (if applicable). C] Confirmed Not Soplicable Applications for operational work involving roadworks Drawings showing: ® existing and proposed contours ® the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points * information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) ¢ kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) edge of pavement where kerb is not constructed position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture e pavement markings including details on raised pavement markers CL] Confirmed Not applicable is assessable development) IDAS form 6—Building or operational work assessable against 2 planning scheme Version 2.G—1 July 2073
Page 11
catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material. Applications for operational work involving stormwater drainage Drawings showing: e existing and proposed contours ¢ drainage locations, diameters and class of pipe, open drains and easements * manhole location, chainage and offset or coordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or coordinates and invert and kerb levels. ° CL Confirmed EX] Not applicable Applications for operational work involving water reticulation Drawings showing: e kerb lines or edge of pavement where kerb is not constructed * location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) : conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. im Confirmed Not Soplicable Applications for operational work involving sewerage reticulation Drawings showing: location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable). im Confirmed X Not applicable Applications for operational work involving street lighting Drawings showing: location of all light poles and service conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment CL] Confirmed Not applicable ® IDAS form 6-—-8uilding or operational work assessable against a planning scheme Version 3.0—1 July 2013
Page 12
e details of lighting levels. | Applications for operational work involving public utility services Drawings showing: [] Confirmed ® any existing light poles and power poles DX] Not applicable ® any existing underground services . e details of proposed services e alteration to existing services. Applications for operational work involving landscaping works & Drawings showing: Confirmed e the location of proposed plant species LJ Not applicable e aplant schedule indicating common and botanical names, pot sizes and numbers of plants * planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details. Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. . OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. ® Department of State Development, Infrastructure and Planning PO Box 15009 City East Qld 4002 tel 13 QGOV (13 74 68) IDAS form 6—Butiding or operational work assessable [email protected] against a planning scheme www.dsdip.qid.gov.au Version 3.0—7 July 2013
Page 13
IDAS Form 6-9 Weyba Esplanade, Noosa Heads Driveway Relocation ° The proposed driveway relocation is not of the self-assessable type due to 2 trees on the road reserve that are proposed to be removed. tJ Following approval for the driveway relocation, subsequent applications for demolition of the existing dwelling, and construction of a new dwelling will be submitted. After discussion with Council Officers as part of pre-application advice sessions, the applicant has conducted the following: © Checked with Unity Water regarding any potential impacts resulting from the relocated driveway. Unity Water have advised (verbally) that no application for relaxation should be required, given that the distance from the proposed driveway edge to the centre of the adjacent sewer manhole is at least 1.5 metres. e Attached is a copy of the Unitywater DIPS Asset Report showing the IL =3.21 & Roof Level = 4.66 of the sewer manhole ¢ Phone discussion with the Council EcoJogist (Connor) regarding the 2 trees proposed to be moved — Grevillia Robusta & Callistamon Viminalis Verbal advice was that there shouldn’t be an issue with removing these 2 trees, subject to an inspection / application. * Commissioned drawing by a certified engineer for the proposed driveway ~ refer attached Please note as part of the application that ® the existing driveway will be removed, and re-turfed ‘ e the curb for the existing driveway will be made good Images showing the layout for the proposed driveway relocation are also attached.
Page 14
ree eee
Water
i] Water Pump Station
(Water Service
>< Water Valve
@ = Water Hydrant
Tapping Device
Water Main
Trunk Main
Reticulation Main
Water Service
ome Water Pipe (Abandoned)
Sewer
Sewer Pump Station
>< Sewer Valve
@ Sewer Connection Point
© — Sewer Manhole
Legena
- Extent of Unitywater Area
Sewer Service
~-~fie Sewer sGravity Main
Sewer Pressure Main
Sewer StoragePipe
oomowe Sewer Pipe (Abandoned)
Recycled Water
Recycled Water Pump Station
@ Recycled Water Hydrant
>< Recycled Water Valve
{8 Recycled Water Fitting
Recycled Water Main
Recycled Water Service
enuaa, Recycled Water
==" Pipe (Abandoned)
Map Tile: 1
* Scale:
(If printed at 100%
on A3 size paper)
1:500 ©
QDanonatial Infrematian Cuntames
$S2807537
Page 15
Page 2vof 2 @ . Unitywater DIPS Asset Report © Date:29/01/2015 . Time:9:38 AM 2807539 _—|Service UNK No Info 6.52 5.52 No Info 63.33 2807540 Service UNK No Info 6.94 5.47 No Info 3 2807901 Service UNK No Info* No Info No Info No Info eS 2807902 Service UNK No Info No Info No Info _: |No Info 35.4 2807903 Service UNK No Info ~*~ |No Info No Info No Info 55.4 No Sewer Connection Points found... This document may not, in whole or part, be copied, photocopied, reproduced or PB age 2 of 2 translated without prior consent from the CEO, Unitywater. Printed copies are uncontrolled.
Page 16
Date:
Water Press
@
Unitywater
29/01/2015
Page 1 of 2
Time:9:38 AM
Asset Number SubType Material Pipe Diameter Pipe Length
2039854 Reticulation Main |AC - 100 446.9
No Recycled Water Pressure Mains found... 6
No Sewer Pressure Mains found... .
ver Gravity Mains...
Asset SubType Material Nominal Pipe Length |USIL DSIL
Number Diameter
2536673 Reticulation |AC 150 60.7 7.73 5.47
Main .
2536677 Reticulation |AC 150 13 No Info 1.35
Main
2536679 Reticulation |AC 150 40.7 9.07 7.08
Main i
2536685 Reticulation |AC 150 40 5.84 4.76
Main :
2536686 Reticulation /AC 150 TD 6.03 5.88
ek Main
2536687 Reticulation /AC 150 60.8 3.21 2.56
Main .
2536688 Reticulation /AC 150 79.7 5.44 3.24
ilo Main
Asset Number SubType SL: IL Roof Level
2668277 Manhole 7.3 5.84 7.3
2668278 Manhole 8.7 7.03 8.7
2668286 Manhole 6.94 5.44 | 6.94
2668287 Manhole 4.66: Br Cd4.66\>
Asset Sub Type /Connection |OB Surface Invert level |HBC 10 Distance
Number Type Distance level Length
2806979 Service UNK No Info is 5.87 No Info 1.5
2806980 Service UNK No Info 7.42 6.52 No Info 22.3
2806981 Service UNK No Info 7.52 6.62 No Info 43.8
2806982 Service UNK No Info. 9.57 7.87 No Info 12.4
2806983 Service UNK No Info 8.97 7.87 No Info 6.6
2807537 Service UNK No Info - {5.42 4.52 No Info 24
2807538 Service UNK No Info 6.02 5.02 No Info 45.6
This document may not, in whole or part, be copied, photocopied, reproduced or Page 1 of 2
translated without prior consent from the CEO, Unitywater.
Printed copies are uncontrolled.
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
PROPOSED DRIVEWAY ACCESS
LOT4 & RP125028 - No.9 WEYBA ESPLANADE, NOC
For GEOFF & REGINA ACTON
UNUeMALL
S102 YVW Ot
Jayunod JUSUyo|enoq
veK
DRAWING INDEX
col
C02
C03
C04
cos
C06
CONSTRUCTION MANAGEMENT NOTES
SEDIMENT & EROSION CONTROL NOTES & DETAILS
DETAIL LAYOUT PLAN
STANDARD DETAILS
4 : 6
oyoet
0
sqanset
soar’
SUBJECT SITE
LOCALITY PLAN
NOT TO SCALE
CONSTRUCTION MANAGEMENT & SEDIMENT/EROSION CONTROL PLAN 2.
ROADWORKS
TITLE SHEET, LOCALITY PLAN AND STANDARD NOTES "
PROVIDE SUBSOIL DRAINS AS SHOWN ON
TYPICAL SECTIONS. MAYBE OMITTEO WHERE
STORMWATER PIPES ARE SHOWN ON HYDRAULIC
CONSULTANTS DRAWINGS.
NOTIFY ALL RELEVANT AUTHORITIES PRIGR TO
COMMENCEMENT OF WORK WITHIN EXISTING ROAD
RESERVES,
THE CONTRACTOR SHALL VERIFY THE LOCATION
OF ALL EXISTING SERVICES WITHIN THE SITE
PRIOR TO COMMENCING WORK. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DAMAGE TO
EXISTING SERVICES WHETHER SHOWN ON
THE DRAWINGS OR KOT.
ALL WORK SHALL CONFORM WITH THE RELEVANT
LOCAL AUTHORITY'S SPECIFICATIONS AND
REQUIREMENTS,
VERIFY SET OUT DIMENSIONS SHOWN ON THE
DRAWINGS BEFORE SITE WORKS, CONSTRUCTION
AND FABRICATION COMMENCES. REFER ANY
DISCREPANCY TO THE ENGINEER BEFORE
PROCEEDING WITH THE WORK
ALL WORKMANSHIP ANO MATERIALS SHALL BE IN
ACCORDANCE WITH THE CURRENT MAIN ROADS
STANDARD SPECIFICATIONS AND DRAWINGS
PROVIDE TRAFFIC MANAGEMENT, LINEMARKING
AND SIGNAGE TO THE CURRENT "MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES"ZAS1742
REQUIREMENTS,
ALL EXISTING SERVICES PROPERTY ACCESSES
AND ROAD FURNITURE WITHIN AREA OF WORKS
TO BE SUITABLY RELOCATED AND MADE GOOD
& CLEARING OF VEGETATION:
NO CLEARING SHALL BE CARRIEO OUT BEYOND
THE EXTENT OF EARTHWORKS OR WHERE
NECESSARY FOR SERVICES CONSTRUCTION
WITHOUT THE WRITTEN APPROVAL OF THE
SUPERINTENDENT,
MILLABLE LOGS ARE TO BE REMOVED FOR
SAWMILLING.
SUITABLE MATERIAL IS TO BE MULCHEO FOR
REUSE ON SITE,
EARTHWORKS NOTE
6
8
PRIOR TO COMMENCEMENT OF ANY CUTTING OR
FILLING, STRIP VEGETATION AND TOPSOIL FROM
AREAS TO BE CUT OR FILLED TO A MINIMUM
DEPTH OF 158mm,
REFER TO THE GEOTECHNICAL REPORT
REGARDING REMOVAL AND REPLACEMENT OF
EXISTING FILLING MATERIAL, THIS NOTE SHALL
APPLY TO THE SUBGRADE UNDER ALL
ORIVEWAYS INCLUDING UNDER FILL BATTERS,
FOLLOWING THE SITE STRIP ANO DRIVEWAY SET
QUT THE ENGINEER SHALL BE CALLED 10 SITE
TO DETERMINE THE PRESENCE OF ANY EXISTING
FILL UNDER DRIVEWAYS AND ASSOCIATED
BATTERS. PROVIDE A BACKHOE FOR THE TEST
PIT EXPLORATION, THE ENGINEER MAY DIRECT
EXISTING LOOSE FILL TO BE REMOVED AND
RECOMPACTED,
COMPACT AND PROOF ROLL ALL PREPARED
SUBGRADE AREAS PRIOR TO PLACING ANY
FILLING.
ALL FILLING SHALL BE PLACEO IN MAXIMUM
150mm LOOSE LAYER THICKNESS WITH EACH
LAYER COMPACTED TO AT LEAST 95 %
RELATIVE COMPACTION AS MEASUREO BY THE
STANDARD METHOD DESCRIBED IN AS 1269,
ALL FILLING SHALL BE CLEAN EXCAVATED
MATERIAL FREE FROM TOPSOIL AND VEGETATION,
THE EXISTING SITE WON MATERIALS SHALL BE
FREE FROM COBBLES OR ROCKS IN EXCESS OF
10mm NOMINAL SIZE,
ANY IMPORTED FILL MATERIAL REQUIRED TO
MAKE UP SHORTFALLS IN QUANTITIES SHALL BE
CLEAN SOIL MATERIAL FREE FROM TOPSOIL,
VEGETABLE MATTER AND OTHER DELETERIOUS
MATERIAL. THE FILLING SHALL BE FREE FROM
COBBLES OR ROCKS IN EXCESS OF 100mm
NOMINAL SIZE, THE MATERIAL SHALL HAVE A
MINIMUM SOAKED CBR OF 15.
ALL EARTHWORKS SHALL BE CARRIED OUT IN
ACCORDANCE WITH AS 3798 WITH LEVEL 2
SUPERVISION AND CERTIFICATION,
THE CONTRACTOR SHALL PROVIDE CERTIFICATION
FROM A RPEQ QUALIFIED ENGINEER THAT THE
WHOLE OF THE EARTHWORKS AND GEOTECHNICAL
SUPERVISION COMPLIES WITH AS37598 FOR LEVEL
2 SUPERVISION
NOTIFICATION AND INSPECTION PROTOCOLS
EMPIRE ENGINEERING IS RESPONSIBLE FOR LIAISING WITH THE COUNCIL DELEGATE AT THE CRITICAL CONSTRUCTION INSPECTIONS ANO THE
CONTRACTOR SHALL GIVE SUFFICIENT NOTICE, AS FOLLOWS:
1, PRE-START MEETING (MANDATORY) - MINIMUM 7 WORKING DAYS,
2, KEY CONSTRUCTION ACTIVITY INSPECTIONS (REFER BELOW) ~ MINIMUM 48 HOURS.
3, ON MAINTENANCE INSPECTION (WHERE SPEC'D BY COUNCIL AT THE PRE-START MEETING) ~ MINIMUM 5 WORKING DAYS.
&. OFF MAINTENANCE INSPECTION (WHERE SPEC'D BY COUNCIL AT THE PRE-START MEETING) - MINIMUM S WORKING DAYS.
5. EMPIRE ENGINEERING IS LIKELY TO CONDUCT RANDOM SITE VISITS AT THEIR DISCRETION AS NECESSARY. ~ NO NOTICE.
CONSTRUCTION ACTIVITIES TO BE INSPECTED INCLUDE (BUT ARE NOT LIMITED TO) THE FOLLOWING:
1. BULK EARTHWORKS INSPECTION STRIPPED TOPSOIL VISUAL AND PROOFROLL, SEDIMENT AND EROSION CONTROL MEASURES ARE USED
AND MAINTAINED, CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS COMPLIANT WITH AS37983,
SUB-GRADE BOX INSPECTION. VISUAL AND PROGFROLL. CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS,
PRE-SEAL INSPECTION. MEASUREMENT, STRINGLINE, VISUAL AND PROOFROLL. CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS.
CONCRETE PAVEMENT INSPECTIONS: STEEL INSPECTION, MEASUREMENT.
STORMWATER OUTLET: COMPLIANCE WITH THE DRAWINGS, PRIOR TO COMMENCING PIPE LAYING UPSTREAM,
NMDERGROUNO CULVERT/CONDUIT ANO PIPES: CHECK BEDDING AND ALIGNMENT PRIOR TO BACKFILL ANO COMPACTION OF TRENCHES.
eyrey
THE CONTRACTOR SHALL GIVE SUFFICIENT NOTICE TO EMPIRE ENGINEERING PRIGR TO COMMENCEMENT ANO UPON COMPLETION OF EACH STAGE
OF THE RELEVANT WORKS.
CONSTRUCTION NOTES
1. CONSTRUCTION START DATE - 7.8.4.
1
2. CONSTRUCTION COMPLETION DATE ~ T.B,A.
3. HOURS OF OPERATION - 6:34am TO 6:30pm MONDAY TO SATURDAY,
4,
5
» CONSTRUCTION PROGRAM - SEE BELOW
. DUST CONTROL MEASURES:-
SA. AREAS OF CLEARING/ EARTHWORKS TO BE LIMITED TO THAT SHOWN ON OPERATIONAL WORKS PLANS,
5.2, PHYSICAL BARRIERS TO BE RETAINED. ie EXISTING VEGETATION/BUFFER ZONES.
5.3, SITE TRAFFIC CONTROL. CONSTRUCTION VEHICLE SPEED LIMITS ON UNSEALED TRACKS TO BE REDUCED TO {tkm/h OR FURTHER IF REQ.
5.6, EARTH MOVING EQUIPMENT MANAGEMENT. CONSTRUCTION EQUIPMENT TO BE POSITIONED STRATEGICALLY THROUGHOUT THE SITE TO
MINIMIZE DUST POLLUTION IMPACT ON NEIGHBORING PROPERTY'S. WIND DIRECTION AND VELOCITY TO BE MONITOREO PERIODICALLY,
5.55 WATER TRUCK TO CYCLE WITHIN DISTURBED AREAS OF THE SITE ON A REGULAR BASIS. WEATHER CONDITIONS TO BE MONITOREO AND
CYCLES TO BE INCREASED IF REQUIRED.
5.6. VEGETATION TO BE STABILIZEQ AS SOON AS PRACTICABLE AT THE COMPLETION GF BULK EARTHWORKS, CISTURBED AREAS TO BE
SEEQED, EROSION AND SEDIMENT CONTROL MEASURES TO BE CONSTRUCTEO.
6. SITE FOREMAN DETAILS - T.8.A.
ADDRESSING COMPLAINTS COMPLAINANT
ee : FReae cucueaies Hecke COMPLAINT «= COMPLAINT = COMPLAINT
+ SITE FOREMAN 1.8.4.
at. sree (Eso
of
RECTIFY ISSUE
COMPLAINTS fede
FLOW CHART |
EE
INFORM, INFORM
COMPLAINANT
sans
FOR APPROVAL
Date | OFF
OS ie novels tte tokio sadion babe is (Cie EO REGIA ACTON | (Seszced SHO [orang [eeged 1) (rie Data WARCH 2015 [Sccte AS SHOWN
wind canal oer BAA PRE BUNDABERG | GIADSTONE | SUNSHINE COAST | |7 , PROPOSED DRIVEWAY ACCESS ME amen TITLE SHEET, LOCALITY PLAN Job Ref No: | Drawing No:| Issue:
ol mibeatin "| ENGINEERING Poaercs PRageneste pay No.9 WEYBA ESPLANADE ff AND STANDARD NOTES SC-5054 cot A
i tgcenwn me TCE SRE eT m NOOSA TROY PAULSEN 7 RPEQ: 6990)
Page 25
AIR QUALITY
MANAGEMENT
NOISE
MANAGEMENT
VIBRATION
CONTROL
ON-SITE MACHINERY
SERVICING AND MAINTENANCE
STORAGE ANO HANDLING OF
DANGEROUS GOODS ON-SITE
WASTE
MANAGEMENT
VISUAL IMPACT
MANAGEMENT
SITE SECURITY AND PROTECTION
OF EMPLOYEES AND THE PUBLIC
ISSUE ~ INCREASED WSDBORNE SEDIMENT LOADS = PUBLIC ROISE RUISANCE EFRON CONSTRUCTION ~ -VIBRATION DAMAGE TO NEIGHBOURING ~ [POTENTIAL FOR SPILLAGE OR LEAKAGE OF » POTENTIAL FOR SPHLAGE OR LEAKAGE OF ~ APPROPRIATE DISPOSAL OF ALL CONSTRUCTION » LOSS OF VISUAL ANENTY DUE TO - UNAUTHORISEO ACCESS TO THE SITE LEADING
DURING THE CONSTRUCTION PHASE. VEHCLES ANO EQUPHENT. ‘STRUCTURES, CHEMICAL AND PETROLEUH PRODUCTS AND CHEMICAL AND PETROLEUN PROGUCTS AND SWE WASTE. CONSTRUCTION, MACHINERY AND EQUPHENT, TO VAHOAUSH, THEFT OR PERSONAL INJURY,
- WORKER. HEALTH AND SAFETY, - RUISAIKE, REGULATED WASTES TO WATERS, REGULATED WASTES TO WATERS,
OBJECTIVE = "TO REDUCE CONSTRUCTION IMPACTS ON AR = TO UNDERTAKE: ALL REASONABLE AND. ~ TO ENSURE GROUND ViBRATIONS 00 KOT ~ TO MINIMISE THE EFFECT OF ON-SITE ~ TO MEISE THE RISK OF HEALTH HAZARDS >. TO TAKE ALL REASONABLE ANO. PRACTICABLE = TO UNDERTAKE CONSTRUCTION USING ALL + TO UNIT ACCESS TO THE CONSTRUCTION SITE
QUALITY AND TO HECP MININISE INCONVENENCE PRACTICABLE: MEASURES TO PREVENT OR CAUSE OAHAGE TO ADJACENT BULONGS OR HACHINERY MAINTERAKCE. CAUSED BY THE STORAGE AND TRANSPORT STEPS YO RECUCE AND RECYCLE WASTE REASONABLE APO PRACTICABLE MEASURES TO FOR AUTHORISED PERSONAL DURNG WORKS:
‘TG NEIGHBOURING PROPERTIES. HIMHISE NOISE NUISANCE TO NEIGHBOURING CAUSE ANNOYANCE TG NEARBY RESIDENTS, + TO UNDERTAKE ALL REASONABLE AND ‘OF DANGEROUS GoODs. DURING THE CONSTRUCTION PHASE AND 10 HNHISE PACT ON VISUAL AREAITY, HOURS ONLY.
PROPERTIES, PRACTICAL MEASURES 10 HINMISE: = TO UNDERTAKE ALL REASONABLE ANO. DiSPGSE OF IT If AN APPROPRIATE MANNER, °
CONTAHNATION OF LAN AND WATERS, PRACTKAL HEASURES TO HNIMISE
CORTAMMATION OF LAND AIO WATERS.
PERFORMANCE | - STANDARD CONSTRUCTION HOURS SHALL SE ~ STANDARD CONSTRUCTION HOURS SHALL BE = STANDARD CONSTRUCTION HOURS SHALL BE » HO RELEASE OF CONTANHANTS TO LANO 08 ~ ALL DANGEROUS GOONS TO BE STORED, ~ ABSENCE OF WASTE AND LITTER OR THE » HINIMAL ADVERSE VISUAL IMPACT ~ KO UNAUTHORISED ACCESS YO THE
UNITED TO 7.00AM 10 £.06PM MONDAYS TO LIMITED TO 7.00AM TO 4.40PM MONDAYS TO ARITEO TO 7.09AH TO &06PH MONDAYS TO WATER, HARDLED AKD BSUNDED, ACCORDING TO CONSTRUCTION SITE, ACCESS ROAD AND: > NO EXCESSIVE COMPLARTS.. CONSTRUCTION SITE.
SATURDAYS UNLESS OTHERWISE AUTHORISED SATURGAYS, SATURDAYS, » AVOID ANY ADVERSE “EFFECTS OM THE AUSTRAUAN STANDARDS, NCLUONG AS52508, BUFFERS.
BY COURGL. . » NO UNREASONABLE NOISE RELEASES ~ VIBRATION IS TO COHPLY. WITH BS 66727 PR CONSTRUCTION SITE DUE TO THE AS1678, AS19463; AND AS23931, ~. NO COMPLARTS. -
» NO WORKS TO BE CARRIED OUT OK. A SUNDAY ~ IN ABSENCE GF QUANTITATIVE HONTORING SECTION 5.7 OF HRS 11.51 OR EQUYALENT. HACITENANCE AND SERVING OF MACHINERY. ~ NO RELEASE OF CONTAMINANTS TO LAHD AKO
OR PUGLC HOLIDAYS. BURNG THE CONSTRUCTION PHASE, NOISE ~ NO EXCESSIVE COMPLAINTS FROM WATER
~ QUST PLUNES CREATEO FROM THE LEVELS. ARE TO BE CONTROLLED TO ACCORD HEIGHBOURNG RESIDENCES
CONSTRUCTION SITE AND/OR HAULAGE OF WITH ACCEPTED INDUSTRY AND REGULATORY ~ RO UNREASOHABLE VIBRATIONS:
MATERIALS ARE TO GE. ELISRATEO REQUIRENENTS,
- NO COHPLAINTS FROM NEGHBCURS
CONTROL + PRIOR TO COMMENCEMENT OF CONSTRUCTION, ~ PRIOR. TO COHHENCENENT OF CONSTRUCTION, ~ PRIOR TO’ COMHENCEHENT OF CONSTRUCTION, + A BUNDED SERVKE AREA 1S REQURED FOR ~ DANGEROUS GOODS SHALL BE STORED + DESIGNATE A WASTE COLLECTION AREA OR- = RUBBISH ANO WASTE TO BE COLLECTEO FROM + ALL ACCESS TO THE SITE {5 TO BE VIA
MEASURES NEIGHBOURING RESIDENTS AND EHERGENCY HEIGHBOURING RESIDENTS AND. EHERGENCY NEIGHBOURING RESIDENTS. ANO EMERGENCY. HAINTENANCE AND SERVICNG -SIGMFICANT SEPARATELY IN BUNOEO AREAS KOT SITE THAT DOES. NOT RECEIVE A SUBSTANTIAL SHE . TRE HOMNATEO PONT ON PLAN
SERVICES SHALL BE NOTHIEO IN WRITING [BY SEAVICES SHALL BE NOTIFIEO IN WRITING (aY SERVICES SHALL BE NOTIFIED IX WRITKG (OY VEHICLE. MAINTENANCE SHALL BE CONDUCTED: ASSESSABLE TO UNQUALIFIED PERSONS: AKQUNT OF RUNOFF FROM UPLANG ASEAS = SURPLUS CONSTRUCTION MATERIAL TO BE = GARRICAGES AND: SAFETY FENCING SHALL BE
LETTER OROP} OF THE CONSTRUCTION PERIOD, LETTER, OROP} OF THE CONSTRUCTION PERIOD, LETTER DROP} OF THE CONSTRUCTION PERIOD, OFF-SITE AT APPROPRIATE FACILITIES, WITHOUT APPROPRIATE TRAINNG IN ITS ‘AND OGES NOT DRAIN ORECTLY TO WATER PROMPTLY REMOVED FROM CONSTRUCTION, ERECTED ARGUND THE SITE ANO ADJACENT
DESIGNATED WORKING HOURS AND CONTACTS: OESIGHATED WORKING HOURS AND CONTACTS ‘DESIGNED WORKING HOURS AND CONTACTS ~ UGNT MAINTENANCE MAY BE UNDERTAKEN 0% HAROLING AND FIRST AID PROCEGURES. Boo, ‘Site, TO PUBLK ACCESS WAYS. THE SITE ACCESS.
REGARDING COMPLAINTS OF EXCESSIVE AIR REGARDING CONPLAINTS OF EXCESSIVE NOISE, REGARDING COMPLAINTS OF EXCESSIVE SITE, IN THE GUNDED SERVICE AREA, » CHEMICAL DATA, HANDLING AND SAFETY. ~ ENSURE REGULAR COLLECTION OF ON-SITE ~~ VEGETATION DISTURBANCE TO BE HNMISED 45 10°8E GATED. ~GENERALLY, CONSTRIXTION
QUALITY DETERIORATION, ~ ADJACENT RESIOERCES ARE TO BE ADVISED OF VIBRATION, + THE CONTRACTOR 15 TG PROVIDE SUITABLE SHEETS FOR ALL DANGERCUS GOODS WILE BE WASTE. ACTIVATES: ARE 10 BE FERCEO/HOARDED!
» VEGETATIVE GROUND COVERS ARE. TO BE ANY WORKS TO BE CONDUCTED OUT OF THE + USE CONSTRUCTION TECKNQUES: THAT ACCESS SURFACING FOR ALL WEATHER KEPT RE THE SITE OFFICE. ~ DISPOSAL OF WASTE COLLECTION BINS ARE FROM ADJACENT PROPERTES,
MAINTAINED WHERE POSSIBLE STANDARD CONSTRUCTION HOURS HINGHSE THE NEED FOR BLASTING, ROCK PURPOSES, = ONLY NECESSARY QUANTITIES OF CHEMICALS, TO BE CLEARLY MARKED “CONVENTIONAL = THE CONSTRUCTION SITE COMPOUND IS 10 BE
» ACTIVITIES ARE TO ONLY BE CONOUCTED. + ALL CONSTRUCTION STAFF ARE TO HAVE BREAKING ARO PILE DRIVING, = SAFE HANDUNG TEGINQUES AND REQUREO FUELS AND OS SHOULD BE KEPT ON THE WASTE", “RECYCLABLE” AND “REGULATED LOCKED AT ALL TINES OUTSIDE OF WORK
OURING SUITABLE WEATHER CONDITIONS, ADEQUATE NOISE PROTECTION AS PER WORK UNDERTAKE GEOTECHNICAL INVESTIGATION AS. REFVELUING, CONSTRUCTION SITE AT ARY THE. WASTE", ERSURE THAT ALL CONTAINERS ARE HOURS.
~ A WATER TRUCK OR SPRAY APPARATUS {5 TO PLACE HEALTH ANO SAFETY, RECESSARY TO PREDCT YBRATION EFFECTS > WASTE OLS ARE TO BE COLLECTED AND ~ EQUPMENT IS TO BE AVAILABLE IN FUEL FITTEG WITH LIDS’ ~ THE SITE SHALL BE APPROPRIATELY
BE PROVIOEO ON SITE WHEN REQUIRED ALL PLANT AND MACHNERY USED DURNG OF CONSTRUCTION TECHNIQUES. TRANSPORTED TO RECYCLERS OR DESIGNATED: STORAGE AREAS AND IN VEHICLES TO. » REGULATEO WASTES SHALL BE SEALED IX A HANTAINED TO PROVIDE A SAFE WORK
=~ EXPOSED AREAS SUCH AS CLEARED AREAS CONSTRUCTION MUST BE FITTEO, WITH » UNDERTAKE ACTIVITES LIKELY 10. CAUSE DISPOSAL SITES. CONTAIN AND CLEAN UP ANY SPILLS THAT APPROPRIATE LICENSED 10: RECEIVE SUCH ENVIRONMENT FOR ALL PERSONAL, ViSITORS
ANO STOCKPILES, ARE TO BE WATERED ANO EXHAUST S'LEMCES OR NOISE SUPPRESSION VIBRATION. DURING NORMAL CONSTRUCTION + SERVIONG OF PLANT AXO EQUPHENT SHOULD MAY OCCUR, WASTE, AKO THE GERERAL PUBLIC,
KEPT DAMP IN ORDER TO HINMISE EROSION EQUPHENT, HUST BEAN GOOD OPERATING HOURS. BE UNDERTAKEN OUTSIOE OF NORMAL > RELEASE ANY CLEAN STORMWATER: = SCHEQULE WASTE COLLECTION 16 REQURED TO = APPROPRIATE WARRING SIGNS SHALL BE
OR THE POTENTIAL FOR DUST CREATION CONDITION ANO NEEL EMISSION STANDARDS, CONSTRUCTION HOURS, ACCUMULATED IN TEMPORARY BUNOED AREAS, PREVENT THE CONTAINERS FROM OVERFILLING, ERECTED FOR THE WORK FORCE ANO THE
~ VEHKLE SPEED 1S TO BE LIMITED ON SITE TO » HAULAGE ROUTES SHALL AVOD RESDENTIAL GENERAL PUBLIC TO HGHUGHT HAZAROOUS
MIRMSE DUST GENERATION AREAS AND USE DEDICATED ROUTES ROADS ACTIVITIES WITH, ANO AROUND THE SITE
= TRUCKS ENTERING GR EXITING THE SITE SHAUL WHERE POSSOLE INCLUDING: EXCAVATION: DEHOLITION: THE USE
HAVE THER LOADS COVERED OF EXPLOSIVES POWER TOOLS, EXPOSURE TO
= ALL CONSTRUCTION VEHICLES EXITING SITE HOGH NOISE EMISSIONS. STRICT HOUSEKEEPING
SHALL PASS THROUGH A WHEEL WASH: DOWN SHALL APPLY TO ALL ENTRIES USED FOR SITE
AND/OR. DRIVE OVER A 'SHAXE DOWN GRID ACCESS OR EGRESS, INCLUDING ENTRY 10 SITE
‘WHICH WILL BE LOCATED AT THE SITE SHEDS AND EMPLOYEES FACILITIES,
ENTRY/EXIT .
= HAULAGE ROUTES SHALL AVOIO RESIOENTIAL
AREAS AND USE SEALED ROADS WHERE
POSSIBLE
~ MAGHNERY SHALL BE FITTED DUST FALTERS
= ALL EQUPHENT AND VEHKLES, ARE TO HEET
RELEVANT EXESSION STANDARDS,
~ MAINTENANCE OF WIND BREAKS ANO BARRERS,
WHERE POSSIOLE
= “STOCKPRES HEIGHTS ARE 10 BE KEPT TO
MANAGEABLE HEIGHTS FOR OUST AND: EROSION
CONTROL: PURPOSES
» PROTECTION OF LONG TERM SOL STOCK PILES
WITH REVEGETATION, WATERNG/HOISTURE OR
HYDRO MULCHING WHERE PRACTICABLE
~ REVEGETATE AS SOON AS POSSIBLE
FOLLOWING CONSTRUCTION
RESPONSIBILITY | + THE CONTRACTOR HOLOS RESPONSBLTY FOR + THE CONTRACTOR HOLOS RESPONSIALITY FOR 7 THE: CONTRACTOR HOLDS RESPONSIBILITY FOR » TRE CONTRACTOR HOLOS RESPONSISILITY FOR: + THE CONTRACTOR HOLOS RESPONSIBILITY FOR + THE CONTRACTOR HOLDS RESPONSIBLITY FOR THE CONTRACTOR HOLDS RESPONSIBILITY FOR = THE CONTRACTOR (S RESPONSIGLE FOR THE
THE SITE THE SITE . THE SITE, THE SITE THE SITE. THE SITE. ‘THE SITE. DESIGNATED SITE COMPOUND SECURITY FENCING.
= THE PRINCIPAL [S RESPONSIBLE FOR PUBLIC ~- THE PRINGPAL IS RESPONSIBLE FOR PUBLK + THE PRINCIPAL 1S RESPONSIBLE FOR FENCING?
KOTIFICATION VIA A THE.LETTER. DROP NOTIFICATION VIA THE. LETTER OROP: HOARDNG TO THE ADJACENT PROPERTIES
MONITORING = THE CONTRACTOR SHALL CONDUCT DALY + A COMPLANTS REGISTER TO BE HARITAINEO, = THE CONTRACTOR IS: RESPONSIBLE FOR. = THE CONTRACTOR JS RESPONSIBLE FOR DALY = THE CONTRACTOR IS RESPONSIBLE FOR DAILY ~ DAILY VISUAL INSPECTIONS OF THE SITE ARE + REGULAR INSPECTIONS FOR UNREASONABLE » DAILY VISUAL INSPECTIONS OF THE SITE WAL
VISUAL INSPECTIONS OF THE SITE FOR DUST = ALL GENUINE NOISE COMPLAINTS SHALL BE FREQUENT INSPECTIONS OF THE SITE DURING VISUAL INSPECTIONS OF THE “SITE. VISUAL INSPECTIONS. OF THE SITE. ‘To BE Conducted. VISUAL IMPACTS, BE UNDERTAKEN FOR ADEQUACY OF SITE
PLUMES, . . INVESTIGATE AND ASSESSED 10 DETERMINE: TMPACT WORKS = REGULAR INSPECTIONS WILL BE UNGERTAKEN: + A COMPLANT REGISTER IS TO BE MAINTAINED SECURITY:
= A COHPLAINT REGISTER IS TO BE HAINTAINED: IF THE NOISE IS UNREASONABLE. SUCH OF ALL TEMPORARY CHEMICAL ANO PETROLEUM
INVESTIGATIONS HAY REQUIRE NOISE PRODUCT STORAGE AREAS FOR LEAKAGES
HONITORING TO DETERHNE IF A PROBLEN OF
BREACH EXISTS,
CORRECTIVE ~ CORRECTIVE ACTIONS WALL INLUDE A REVIEW ~ UNREASONABLE NOISE CAUSED BY HACHINERY ~ SHOULO COMPLAINTS ARISE, MEASURES SHALL = THE CONTRACTOR SHALL ENSURE ON-SITE ~ IF DAMAGED GOODS ARE SPLT, THE + PROHPT DELEGATION OF CLEAM UP WORKS. = VISUALLY OFFENSIVE COMPONENTS OF ~ RYSTALLATION OF INCREASED SECURITY
‘ACTIONS OF EXISTING CONTROL MEASURES FOR ISTO BE REKEOIED BY APPROPRIATE REPAIRS ‘BE TAKEN BY THE CONTRACTOR TO MODFY: MACHINERY 1S STOREO WITHIN THE SECURE CONTRACTOR SHALL ENSURE THAT THE AREA = INKREASEO VIGILANCE CONSTRIKTION SHOULO.BE IDENTFIEO AND IF HEASURES REQURED,
INADEQUACIES. AND. A MAINTENANCE SCHEOULE REVIEW. THE OFFENONG EQUPHENT OR MOOFY DESIGNATED COMPOUND AFTER WORKNG IS ISOLATED ANO KNIMISED, POSS@LE HODIFED IN CONSULTATION WITH
= SHOULO COMPLAINTS ARISE, THE CONTRACTOR ~ THE RELEVANT ACTIVITY MAY REQUIRE CONSTRUCTION PRACTKES TO ENSURE ‘HOURS, ~ PETROLEUM OR CHEMICAL SPLLAGES ARE TO KCHPLAINT.
‘SHALL ENSURE HEASURES ARE TAKEN TO MODIFKATION OR RELOCATION, VIBRATIONS ARE WITHIN. RELEVANT ~~ THE CONTRACTOR SHALL ENSURE ANY BE MMEDIATELY, CLEARED UP WITH
MODIFY THE OFFENDNG EQUPMENT OR MODIFY = SPECIFK MACHINERY HAY REQUIRE AN. “GUOELNES. UNAUTHORISED MAINTENANCE 1S CEASED ADSORBENT MATERIAL.
CONSTRUCTION PRACTICES TQ REDUCE OUST ALTERATION TO ITS HOURS OF OPERATION, THMEGIATELY AND MOVEO OFF~ SITE, ~ ABSORBENT MATERIALS USED FOR CLEAN UP
LEVELS WITHIN RELEVANT SGURDELINES: = TORRECTIVE ACTIONS WILL INCLUDE .A REVIEW ~ THE CONTRACTOR. SHALL ENSURE ANY AREA OR WASTE DARGERQUS GOODS ARE TO 6E
OF EXISTING CONTROL HEASURES FOR DANAGED BY HYOROCARGONS OR HAZARDOUS PLACED ARD SEALEG JH AN APPROPRIATE
ANADEQUACIES. CHEMKALS IS FENCED, EXCAVATED AND CONTAINER HARKED “REGULATED WASTE* AND.
- $N THE EVENT THAT A ROR-CONFORMANCE HAS: 'RENOVED FROM SITE TO A DESIGNATED. CONSIGNED TO A WASTE CONTRACTOR
OCCURRED AS A RESULT OF POOR WORK DUMPING AREA AND THE AREA UCENSED TO RECEIVE SUCH WASTE FOR
PRACTICES, PERSONNEL ONSITE WAL BE RE-ESTABLISHED DISPOSAL AT AK APPROVED FACHLITY.
MADE AWARE OF THE PROBLEM ANO JNFORHED ~ THE QAHAGEO AREA IS TO BE
OF ACCEPTABLE WORK PRACTICES, RE-ESTABLISHED:
REPORTING = WEEKLY-REPORTING BY THE PRACELE » WEEKLY REPORTING BY THE PRNCPLE = WEEKLY REPORTING BY TRE PRINCIPLE » WEEKLY REPORTING BY THE PRINCIPLE ~ WEEKLY REPORTING BY THE PRINCPLE = WEEKLY REPORTING BY THE PRINCPLE ~~ WEEKLY REPORTING BY THE PRINOPLE ~ WEEXLY REPORTING BY THE PRINCIPLE
CONTRACTOR T@ THE CONSULTANT COVERNG CONTRACTOR TO THE CONSULTANT COVERING CONTRACTOR: TO THE CONSULTANT COVERING CONTRACTOR 10 THE CONSULTANT COVERING CONTRACTOR 10 THE CONSULTANT COVERING CONTRACTOR TO THE CONSULTANT: COVERING CONTRACTOR TO THE CONSULTANT COVERING CONTRACTOR TO THE CONSULTANT COVERING
‘THE EFFECTIVENESS OF THE MANAGEMENT THE EFFECTIVENESS OF THE HMANAGEHENT TRE EFFECTIVENESS OF THE MANAGEMENT THE EFFECTIVENESS OF TRE MANAGEMENT THE EFFECTIVENESS OF THE MANAGEMENT TRE EFFECTIVENESS OF THE MANAGEHENT THE. EFFECTIVENESS OF THE MANAGEMENT ‘THE EFFECTIVENESS QF THE MANAGEMENT
SYSTEM AND NOTING ANY CORRECTIVE SYSTEM AND ROTING ANY CORRECTIVE SYSTEM AND NOTING ANY CORRECTIVE ‘SYSTEM ANO NOTING ANY CORRECTIVE SYSTEH AND NOTING ANY: CORRECTIVE ‘SYSTEM AND KOTING ANY CORRECTIVE ‘SYSTEM ANO NOJAG. ANY :CORRECTIVE SYSTEM AND NOTEG ANY CORRECTIVE
ACTIONS TAKEN ACTIGNS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN
as
TOES ony ate eee, eat ea ibe 5 (tient: GEOEF & REGRA ACTON ) (Pasisaed “SHO [orgs an [ergeres. TGP) (Titte: (Date, HARCH 2015 [stale AS SHOWN)
cngetrmaai cece Sel E AA PARE eeaomas GIADSTONE SUNSHINE COAST | |r ici PROPOSED DRIVEWAY ACCESS ‘Spereved CONSTRUCTION MANAGEMENT NOTES Job Ref Rox | Drawing Wo:| _fssue
fet teteae petaiten ef Phe angeee. lelrogeaet FORA EE Badder SU | POR O GaeecSCGd ent Bobet Webel GT et Rod WEYSA ESPLANADE jE
2 Soets thet he waicecr tre yeh ENGINEERING [me Tae hae "on : SC-5054 €02 A
Date [ore ) (a vetp et oeancve mate SES Faye AIS ee KoOSA TROY PAULSEN 7 PEG: 6990 }
Page 26
EROSION AND SEDIMENT CONTROL
PROGRAM
1. THIS PROGRAM ANO ASSOCIATED PLANS SHALL BE READ IN CONJUNCTION WITH THE
SHE NANAGEHENT SPEQFICATION INCORPORATE # THE CONTRACT DOCUMENTS.
THE PROVISIONS.OF TRE SPEGFICATION ARE ‘TO BE STRICTLY ADHERED TO,
s
PRIOR TO THE COHMERCENENT OF CONSTRUCTION, THE CONTRACTOR iS TO PROVIDE
A OETAILED PROGRAH TO THE SUPERINTENDENT SHOWING THE TIMING FOR ALL
WORKS ASSCOATED, WITH THE PROJECT, NOMNATING, IN PARTICULAR, THE
PROGRAM FOR INSTALLATION OF SOL AND EROSION CONTROL SYSTEMS,
EARTHWORKS SHALL 8£ CARRIED OUT IN-SUCH A NAHNER THAT THE SITE IS
HAINFAREO:IN A WELL DRAINED. CONDITION, AREAS OF LOOSE SOIL ARE HINIHISED
AND CONCENTRATIONS OF STORM WATER ARE MINMISED.
+
}> THE GASIC OBJECTIVES OF THE EROSIOH ANO SEOMENT CONTROL ARE:
» IDENTIFY CRITICAL AREAS: ANO: PROVDE SPEGAL ATTENTION TO THOSE AREAS,
+ PLAN SITE LAYOUT SO THAT ACCESS YO ALL REGURED ORAINAGE EROSION AND.
SEDIMENT CONTROL MEASURES [S NARITAINED..
~ LOTT EXPOSURE TIME BY PROGRAMMING TO NINMISE. THE AREA OF LAKD
EXPOSED 70 POTENTIALLY ADVERSE WEATHER CONDITIOHS AT ANY ONE TINE.
= PROVIDE. CONTROL MEASURES INCLUEBNG TEHPORARY AND PERHAKENT DRAWAGE,
EROSION AND SEDMENT CONTROLS.
-
THE EROSION AHO SEQENT CONTROL SHALL COMPLY WITH LOCAL AUTHORITY.
EROSION AND SEDMENT CONTROL STANDAROS, THE SOX ERORON AND SEOMENT
CONTROL ~ EXGREERING GUDELBIES FOR QUEENSLAND [CURRENT EOITHOHS), AND.
ALL OTHER LOCAL AUTHORITY EROSION ANO SEDHERT CONTROL GUIDELINES,
& ALL ESC HEASURES SHALL BE AISPECTED,
‘ AT LEAST DAILY (WHEN WORK 1S OCCURRING Of SITEL;
+ WITH 25 HOURS OF EXPECTED RAIN; AND
= WITHH 18 HOURS OF RAINFALL EVENT fie, AN EVENT OF SUTFICENT INTENSITY
‘AND BURATION TO MOBILISE SEOMENT ON 'SITE), MAINTENANCE OF ESC HEASURES
SHALL CCCUR IN ACCORDANCE WITH THE FOLLOWING TABLE:
Esc : TRE FRAME FOR COMPLETION
MEASURES. MAIRTENANCE TRIGGER ‘OF MAUITENANCE
WHEN SETTLED SEDIMENT EXCEEDS:
SEDIMENT THE VOLUHE OF THE SEQMENT WITHIN: 7 DAYS CF
BASIS. STORAGE ZONE (SEE COUNCIL'S THE INSPECTION
SEDINENT BASN DESIGN GUIDELINES)
‘OTHER ESC THE CAPACITY OF ESC BY THE END
MEASURES: MEASURES FALLS BELOW 75% OF THE DAY
EROSION-AND SEDIMENT CONTROL NOTES
OPSOIL:
4, SEOMENT FENCES TO BE PLACED AS SHOWH, FOR OETARS OF SEDIMENT FENCE
REFER IPWEA STANDARD DRAWING B-2640,.
2. STRIP AND STOCKPILE AVAILABLE TOPSOIL [ASSUMEO AVERAGE DEPTH Itfunt
FROM ALL BISTURBEG AREAS PRIOR TO BULK EARTHWORKS.
3 GRADE EVENLY BETWEEN ALLOTHEAT FINISHED SURFACE LEVELS AND ENSURE
LOTS ARE FREE DRAINING.
4. PERIMUM SLOPE ACROSS ALLOTMENTS TO 8E 1%,
5S, ALL FOOTPATHS, BATTERS ARO EARTHWORKS AFFECTED ALLOTMENTS ARE TO
BE TOPSOLED TO A MIMUM DEPTH OF {tein FLIGHTLY COHPACTEOE AND.
TURFED WHERE SPECFIEO.
SEDIMENT FENCES:
1. SEQNENT FENCES 10 BE REPAREO AS REQUIRED AND EXCESSIVE SEOHENT
GEPOSITS ‘SHOULD BE REMOVED.
2, IM THE EVENT GF WET WEATHER, SNSTALL KERB INLET FILTERS WITH GRAVEL
RARGING FROM Sam TO:5na IN SIZE. REFER IPWEA STANDARD DRAWING
G-BEXT, WHEREVER PRACTICABLE SEOINENT RUNOFF SHOULD BE COLLECTED
ASD RETAINED WHOLLY WITHN THE WORKSITE OR PRIGR TO ENTRY ON A.
ROAD SURFACE {WHETHER INSIDE OR. OUTSIDE THE SITEL OF THE GRAVEL
FILTER BECOMES CLOGGED WITH SEDIMENT DURING ITS USE, THE GRAVEL MUST
BE PULLEO AWAY FROM THE HESH AND CLEARED OR REPLACEO.
3. DAILY CHECKS OF SILT FENCES 1S 70 8€ NADE ALONG WITH A CHECK AFIER
ANY SIGNIFICANT ‘STORM EVENT TO ENSURE INTEGRITY ARO PERFORMANCE.
TURFING: .
1. PROVIDE TURFING 70 ENTIRE WIDTH OF ALL SWALES, FOOTPATHS AMD 4 ft 4
CUT AND FLL BATTERS.
2, FOOTPATH BATTERS ARE TO BE STAGILISED WITH. TOPSOL {AND TURFED] AS
‘SOGH. AS PRACTICAL AFTER BATTERS HAVE BEEN COMPLETED. RENAINHG
EXPOSED AREAS ON LOTS ARE TO BE SEEDED AND MULCHED [eg.
RYDROMULCHED!,
3. ALL AREAS OF CUT AND. FILL INCLUDING ROAD VERGES: 10 BE SEEDEO 10
AGHEVE 85% STRIKE WITH TWO WEEKS AND 80% COVERAGE WITH SOX
ONONTHS,
‘A’ DURING CONSTRUCTION:
7, WATER QUALITY ‘SAMPLES HUST BE TAKEN AND ANALYSED PRIOR TO THE RELEASE
OF ANY WATER FROM THE SITE. WATER QUALITY HUST SATISFY THE FOLLOWING
CRITERIA: T$5<50 mg/t pH BETWEEN 6.5 AND 8.5. WATER QUAUTY FALS THE
CRITERIA THEN USE OFA GYPSUM FLOCCULENT 1S TO BE APPLIED AS DIRECTED BY
‘TRE SUPERMTENDENT,.
#, ALL WATER QUALITY DATA INCLUDING DATES OF RAINFALL, TESTING ANO WATER
RELEASE MUST BE HAINTAINED IN AN ONSITE REGISTER. THIS REGISTER IS TO: BE
‘HAINTABIEO FOR THE DURATION OF THE APPROVED WORKS ANO'BE AVABABLE ON
SITE FOR RISPECTIONS BY COUNCIL OFFICERS ON REQUEST.
9. CONSTRUCTION ACCESS SHALL BE AT ONLY ORE NORINATED PONT'AS DETAILED OF
THE PLANS, A TRUCK WASH HARD STANO AS DETAILEO ON THE PLAN COMPRISING
FREE DRANG GRAVEL SHALL BE LOCATEO ADJACENT TO THE POINT OF ACCESS:
WHERE VEHCLES CAN BE WASHED DOWN PRIOR FO EXIT TO THE STREET SYSTEM
AF REQURED, THE WASH DOWN AREA SHALL BE KEPT FREE OF HUO,
}» FOR DETAILS. OF ‘SHAKE OOWN. AREA REFER TO IPWEA STANDARD. DRAWING O-0048,
VL SUPPLEMENTARY EROSION AND SEOIMENT CONTROL DEVICES NAY BE REQUIRED AT
THE DISCRETION OF THE SUPERINTENDENT ANDZOR COUNCIL,
42. SEDIMENT CONTROL DEVICES SHALL BE PROVIDED WHERE SHOWN ON THE DRAWINGS,
SEDIMENT TRAPS SHALL REMAN Mi PLACE UNTIL AT LEAST 78%: SOIL COVERAGE
UPSTREAH AND COWNSTREAM OF THE OEVKE 1S ACHEYED AND/OR AS DIRECTED
‘BY COUNTE,
1B. EXCAVATED MATERIAL WiLL BE PLACED DIRECTLY INTO FILL AREAS IN ACCORDANCE
WITH THE APPROVED ‘SPECIFICATION,
4, ANY RPORTED FILL MATERIAL SHALL COMPLY WITH THE REQUIBENENTS OF THE
SPECIFICATION,
35. ALL TEMPORARY EROSION AND: SEDIMENT CONTROL (ESCE MEASURES TO BE
MAINTAINED AND FULLY OPERATIONAL DURING THE MAINTENANCE PERIOD AND. ARE
TO. REMOVED AFTER THE SATISFACTORY COMPLETION OF A OFF-MAINTENACE
INSPECTION BY COUNCE AND PRIOR TO FORMAL ACCEPTANCE “OFF MAINTENANCE”
BY COUNcE.
ORDER OF CONSTRUCTION
PRIOR TO ANY CONSTRUCTION COMMENCING,
CONSTRUCTION ENTRY/ EXIT: TOBE INSTALLED.
SITE BARRIER/NO-G0 FENCRG TO BE ESTABLISHED.
‘SEOMENT FENCES AND TRAPS {WLET PROTECTION}
TO BE INSTALLED.
‘SITE TO 8E SHAPED TO DESIGN LEVELS ANO
‘SURFACE STABAIZEO ASAP BY HEANS OF TOP
SOLING AND GRASS SEEQNG WHERE APPLICABLE,
1. TOPSOL STOCKPILE 10 HAVE A SEDIMENT FENCE DOWN SLOPE AND &
DIVERSION DRAIN UP SLOPE,
2 SEOMENT FENCES TOBE PLACED AS SHOWN,
3. INSPECT BANKS DALY ANU REPAIR ANY SLUMPS, WHEEL TRACK QANAGE OR
LOSS OF FREEBOARD,
4. REHOVE SEDIMENT TO AVOID PONDING FROM CATCH DRAINS,
5, REMOVE EXCESSIVE SEDHENT FROM UPSTREAH OF CHECK DAM.
"ROAD RESERVE TO BE.USEU'AS, HAUL, ROAD,
7. A CATCH ORAIN/CATCH BANK IS TO BE PROVIDED ON THE TOP SIDE OF “ALL
CUTS ANO DISCHARGE EITHER TQ UNDISTURBED GRASS LANGS CR TO THE
CROSS ROAD. DRAINAGE,
@, SUPPLEMENTARY EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED
AT THE DISCRETION OF THE EXGNEER,
% GRASS SEEDNG IS TO ACHEVE 70% COVER WITHN 3t DAYS OF COMPLETION
‘OF EARTHWORKS,
(BL FOLLOWING CONSTRUCTION: ,
4,” SEDIMENTATION AND EROSION CONTROLS TO BE MAINTAINED UNTIL. SITE IS 60%
STABAISED WITH ESTABLISHED GRASS/TURP THEN CONTROLS CAN BE
(OVED.
HOLD POINT
Ty WORK TO ROADS, ORAIAGE, SEWER, WATER OR EARTHWORKS HUST NOT
PROCECO UNTIL ADEQUATE SEDIMENT CONTROL IS RE PLACE TO THE
SATISFACTION OF THE SUPERRITENOENT.
WARNING
THE LOCATION OF ALL EXISTING SERVICES (E.G, TELSTRA,
ELECTRICITY, SEWERAGE, WATER & GAS) ARE SHOWN
SCHEMATICALLY ON THE DRAWINGS. PRIOR TO AND
DURING CONSTRUCTION OBTAIN YHE PRECISE LOCATION OF
ALL SERVICES (UNDERGROUND: & OVERHEAD} FROM THE
RELEVANT AUTHORITY RESPONSIBLE FOR THE SERVICE
SHOWN, THE CONTRACTOR SHALL BE RESPONSISLE FOR
ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN
ON THE DRAWINGS OR NOT,
DORIS OUT
SEEKER
STABILISEO.
Lee SURFACE
mA
SEOMENT FENCE
Sy
7 ~
TYPICAL STOCK PILE DETAILS
NOT TO SCALE oe
STOCK PILE NOTES:
ra
3.
4
&
PLACE STOCKPILES NORE THAN 2 (PREFERABLY 5} METRES FROM EXISTING VEGETATION, CONCENTRATED:
WATER FLOW, ROADS AND HAZARO AREAS,
CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS,
WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAR 2 METRES IN HEIGHT.
WHERE THEY ARE YO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
ESCP OR SWMP TO REDUCE THE C-FACTOR TO LESS THAN 0.10,
CONSTRUCT EARTH BANKS {STANDARD DRAWING 5-5} ON THE UPSLOPE SIDE TO OIVERT WATER
AROUND STOCKPILES AND SEDIMENT. FENCES. (STANDARD. DRAWING 6-8} 1 70 2 METRES DOWNSLOPE.
KERB SEDIMENT TRAP DETAIL
HOT TO SCALE
FABRIC, -BIOIM
U3$ OR SIMILAR
GG ~ 75ma. CRUSHED ROCK
TEMPORARY CONSTRUCTION
ENTRY / EXIT SEDIMENT TRAP
ROLL OF NETTING FILLED WiTH
Sdom TO 75em GRAVEL:
ROLL OF RETTING FILLED
> WITH 50 TQ 75mm GRAVEL
NOT TO SCALE
FG2 FABRIC
TO AS 1394
FIX TQ TOP OF STAKE WITH
SHADECLOTH FASTENER OR
VE TO STEEL PICKET.
300 MIN, HIGH BERM GEQTEXTILE FABRIC
. AD Fle
2
SOXS9 HW STAKE OR STEEL
PICKET 1266 HIN LONG
CRUSHED/GRANHULAR
MATERIAL; GRADING TO
TABLE & OF OT
SPECIFICATION MRS11-03,
SEDIMENT FENCE DETAIL
NOT TO SCALE
DISTURBED AREA
GULLY INLET PROTECTION DETAIL
we “POSES OR STEEL PICKETS
DRIVEN 600mm INTO
GROUND rr
80 MIN VERTICAL
OVERLAP OF FABRIC
GACKFILL UNDISTURBED AREA
SEDIMENT FENCE ELEVATION
NOT TO SCALE
stares
FOR APPROVAL
‘HOWES ’ (Ctisnts’ GEOR & REGNA ACTON Designed: SMO [deawi Chesked TOP) [lities ‘Gate: MARCH 2615 [Scate. AS SHOWN
Tis i Sha progerie sf the engieter ad may te) be BUNDABERG GLADSTONE SUNSHINE COAST - °
moet teeet Sales! BNA PARE seccone, ouescney,, geemmgaar "| [ret proroseo DnvewaY ACCESS teres EE SEDIMENT & EROSION CONTROL 2b Ref Rox [avg Hs "tsb
sgrans paretsticn of the engeaet, tegen Wibea St Senlery GLAD PBT Chalenee EO BAS “TIDE Madden BENT 5 2
9 Beieg) neers fie aan ENGINEERING bauer” Parente Pesta No.9 WEYBA ESPLANADE NOTES & DETAILS SC-5054 C03 A
Date [ort ) \S ei crenene on sev grins RS 7 = Roosa L TROY PAULSEN / RPEQ: 6990 - /
Page 27
INDICATES TEMPORARY CONSTRUCTION
ENTRY. CONTRACTOR SHALL CONTINUOUSLY:
HONITOR THE ROAD ADJACENT 10 THE SITE
FOR ANY “SO! OR OTHER MATERIAL
CARRIED OFF THE SITE AND IMHEQIATELY
RENOVE SUCH MATERIAL, REFER TO DWG
C03 FOR DETAILS,
EXISTING TEA TREE ANO SILKY OAK TO BE
APPROPRIATELY RENOVED AS REQUIRED. «
_ DISTURBED GROUND, TO BE APPROPRIATELY.
BACKFILLEO AND COMPACTEO TO COMPLY WITH
RELEVANT STANDARDS AND REQUIREMENT:
___ PROVIDE KERB ‘SEDIMENT "TRA
DOWNSTREAM OF CONSTRUCTION ENTRY.
REFER TO OWG C03 FOR DETALS,-
SCREW iH KE
RL S.
SURVEY TBM
RB.
4
\
|
|
i
|
REMOVE EXISTING
Lor 3
(REIDEOE
LOT 10
RPRATSS
DRIVEWAY ANO NEATLY!
REINSTATE KERB TO) |
MATCH ExsTING, =|
i
i
EXISTING CONCRETE
ORIVEWAY YQ BE NEATLY
OTAKEN UP AND REMOVED
FROM SITE AS INDICATED,
sane
enone
om
<
|
\
i
i
|
oT 9
RPHZEIOS
RP1Z5028
lors ©
TRAFFIC CONTROL NOTE.
{, TRAFFIC CONTROL PLAN TO BE COMPLETED BY APPROPRIATELY: CERTIFIED
TRAFFIC CONTROLLER AND: SUBMITTED TO EMPIRE ENGINEERING PTY LTO
‘ANG ‘SUNSHINE COAST COUNCIL PRIOR TO PRE-START MEETING,
EXISTING SERVICES NOTES
SEDIMENT & EROSION PLAN 1. ALL EXISTING SERVICES ANO INFRASTRUCTURE IN
re eprhacer | couple win ant erivn VICINITY OF PROPOSED ALLOTHENT BOUNDARY To
OBJECTIVE/ TARGET COMPLY. WITH ALL STATUTORY REGULATIONS. AND
MAINTAIN THEM, DURING CONSTRUCTION ANO THE
MAINTENANCE PERIOD. COMPLY WITH THIS EROSION
ANO SEDIMENT CONTROL PLAN, TO CONTROL
EROSION AND SEDIMENT FLOWS:
MANAGEMENT
STRATEGY
‘SITE FOREMAN TO IDENTIFY ANO CHECK DIRECTION OF
STORMWATER LAND FLOWS AS SHOWN ON THE PLAN.
PROVIDE BARRIERS ANO OTHER MEASURES SHOWN ON
THE PLAN Td PREVENT STORMWATER FLOWS OVER
EMBANKHENTS: AND: SEQIMENTS INTO CATCHAIFS:
TASKS/ ACTIONS
“ERECT SEGIHERT BARRIERS AT TRE TOP OF
EMBANKMENTS AS SHOWH ON THE DRAWING,
STRATEGICALLY PLACE CHECK DAMS ARQUND GULLY
Pits.
PERFORMANCE.
INDICATORS
SITE. FOREMAN TO CHECK EROSION AND SEDIMENT
FLOWS AT THE BASE OF EMBANKMENTS AFTER.
RAIN, CHECK THAT CHECK DAMS ARE WORKING
DURING RAIN PERIODS,
FREQUENCY /DEADLINE
SITE FOREMAN TO MONITOR PERFORMANCE AFTER
EVERY HEAVY DOWNFALL,
ORGANISATION
SUTE FOREMAN TO BE RESPONSIBLE FOR INSPECTIONS,
REPORTING/REVIEW
SITE WORKERS TO ADVISE FOREMAN IF THEY
NOTICE ANY BARRIER NEEDING REPAIR.
CORRECTIVE ACTIONS
SITE FOREMAN TO REPORT AND ORDER THROUGH
‘SUPERVISOR, EXTRA BARRIER OR CHECK DAHS AS.
REQUIRED.
A
BE REMOVED / RELOCATED TO ENSURE IT tS
WHOLLY CONTAINED WITHIN-A SINGLE ALLOTMENT.
{ NOTE
1. CONTOURS SHOWN DEPICT THE EXISTING SURFACE AND ARE AT 0.5m
INTERYALS,
{ SEDIMENT MANAGEMENT NOTES
1, PROVIDE SEDIMENT FENCES AT THE TOE OF ALL FILL BATTERS.
2. PROVIDE TEMPORARY SEDINENT TRAPS ‘AS DIRECTEO.
3, SEGMENT MANAGEMENT MEASURES ARE TO BE MAINTAINED UNTIL
ACCEPTANCE “OFF MAINTENANCE’ & ARE DESIGNED IN ACCORDANCE “WITH
*SOiL EROSION AND SEDIMENT CONTROL’ BY THE (EA.AND NAY VARY BY
THE COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS,
4 GRASS. SEEGING OR MULCHING ARE 10 BE CARRIED OUT AS SOON AS
PRACTICABLE TQ DISTURBED. AREAS.
7. EXISTING BULDINGS ANO TREES TO 8E APPROPRIATELY REMOVEG FROM SITE
AS REQUIRED. DISTURBED GROUND TO BE APPROPRIATELY BACKFILLED AND
-COMPACTED TO COMPLY WITH RELEVANT STANDARDS AND REQUIREMENTS.
LEGEND
nnn PROPOSED SEDIMENT FENCE
srererereperererrres EXISTING TOP OF BATTER
“EXISTING BITUMEN
EXISTING CONCRETE TO BE
REMOVED
(]
— — $ —~ —€5) EXISTING SEWER Han
irre
Lot 8
RPI28795
WARNING
THE LOCATION OF ALL EXISTING SERVICES {E.G. TELSTRA,
ELECTRICITY, SEWERAGE, WATER & GAS} ARE SHOWN
SCHEMATICALLY ON THE DRAWINGS, PRIOR TO AND
DURING CONSTRUCTION OBTAIN THE PRECISE LOCATION OF
ALL SERVICES (UNDERGROUND & OVERHEAD] FROM THE
RELEVANT AUTHORITY RESPONSIBLE FOR THE SERVICE
SHOWN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN
ON THE DRAWINGS OR NOT,
PRORCT FERTH
“ voataAl sof 2
‘STATS
Dots | OFF
2 & sa
nie — ate EXISTING ELECIRIITY LINE 208 ot 23 FOR APPROVAL
ee pravty ot a goa est ney teh te : . Te BUND sS ¥ 5 C {tients “GEOFF & REGNA ACTON ") (Gesigred_SMO_[orawe, SMO... [Checked TOP) ffitte: - : ‘Dste: MARCH 2615 [Scate. AS SHOWN)
Ree ees EM PERE SaiheSo SAISON « SOSHINEGOMT | [eres PROPOSED ORVEWAY ACCESS ee, LE CONSTRUCTION MANAGEMENT & Jab Ref Nox___| Oraving o:| Issue:
a denempmalbtadaia 0" |TENGINEERING fier, pacifier No.g WEYBA ESPLANADE Z SEDIMENT / EROSION CONTROL PLAN SC-5054 coh | A
i Raced noe ENT ST * NOOSA, L TROY PAULSEN 7 APE: 6990)
+
Page 28
EARTHWORK NOTES
1 ALL AREAS OF CUT % FILL INCLUDING ROAD VERGES TO BE SEEDED TO ACHIEVE 80% STRIKE WITHIN
TWO WEEKS AND 80% COVERAGE WITHIN SIX MONTHS,
2 ALL EARTHWORKS TO BE CARRIED QUT IN ACCORDANCE WITH AS3792,
3. ALL. TESTING TO BE CARRIED OUT BY CONTRACTOR IN ACCORDANCE WITH AS3796, LEVEL 2
GEOTECHNICAL TESTING,
LL J}
GENERAL NOTES
1, ALL LEVELS SHOWN ARE FINISHED SURFACE LEVELS, U.N.O.
2 ENSURE SITE STORMWATER DOES NOT CROSS NEIGHBOURING PROPERTIES.
3. CONTAIN ALL SURFACE WATER ON SITE AND DISCHARGE TO PROPOSED STORMWATER SYSTEM,
4, VERIFY SET QUT DIMENSIONS SHOWN ON THE DRAWINGS BEFORE SITE WORKS, CONSTRUCTION AND
FABRICATION COMMENCES, REFER ANY DISCREPANCY TO THE ENGINEER BEFORE PROCEEDING WITH THE
WORK,
3 ALL WORKMANSHIP ANO MATERIALS SHALL BE IN ACCORDANCE WITH TRE CURRENT RELEVANT STANDARD:
SPECIFICATIONS ARO REQUIREMENTS.
& NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF WORK WITHI EXISTING ROAD
RESERVES,
7 THE CONTRACTOR SHALL VERIFY THE LOCATIGH OF ALL EXISTING SERVES WITHIN THE SITE PRIOR
TO COMMENCING WORK, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING
SERVICES WHETHER SHOWN ON THE DRAWINGS OR NOT.
@ SURVEY INFORMATION PROVIDED BY MAX WATTERSON » ASSOCIATES CONSULTING SURVEYORS AND
PLANNERS,
LEGEND
( PROPOSED CONCRETE
PROPQSEO FINISHED
SURFACE LEVEL
EXISTING SURFACE LEVEL
+1386
HEX 11386
EXISTING SEALED PAVEMENT
ae
EXISTING FENCE
—— $ — —& ENISTING seWeER Haml
so AEC amen EC mee EXISTING ELECTRICITY LIE
no PROPOSED DOWEL CONTROL
JOINT
—— 8). proposto saw cur Jont
EXISTING SERVICES NOTES
J. ALL EXISTING SERVICES AND INFRASTRUCTURE IN
VIGNITY OF PROPOSED ALLOTMENT BOUNDARY TO
BE REMOVED. / RELGCATED TO ENSURE IT IS
WHOLLY CONTAINED WITHIN A SINGLE ALLOTHENT.
WARNING
THE LOCATION GF ALL EXISTING SERVICES [E.G, TELSTRA,
ELECTRICITY, SEWERAGE, WATER & GAS} ARE SHOWN
SCHEMATICALLY ON THE DRAWINGS, PRIOR TO ARO
DURING CONSTRUCTION OBTAIN THE PRECISE LOCATION OF
ALL SERVICES WWNDERGROUND & OVERHEAQ! FROM THE
RELEVANT AUTHORITY RESPONSIBLE FOR THE SERVICE
SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN
ON THE DRAWINGS OR NOT.
SURVEY TBI
“SCREW IN KERB +!
+ Rl ;
REMOVE EXISTING
DRIVEWAY ANG ° .
REATLY REINSTATE ~
KERB TO MATCH
EXISTING.
| |
| q
i |
| 3 LOT 3
* | RPH2S628 LOT
I | nee wen yee API28795,
I ¢ a
| f
| - - a
a ¥ ~
a
1 |
I g CTT peor me 7 4
| 1 | fh
| INDICATES PROPOSED BULOING a \
| | OUTLINE ORAWH IRDICATIVELY. hay
‘, w y foo
‘ 8 | : \
NO | th
\ | g f \
| |
NI t | | \4
TRANSITION FROM EXISTING —% | uf \
VERGE PROFLE TO HATCH KEW ta
DRIVEWAY LEVELS (616 MAX). Lae ne eee nt en ee uy
TURF ALL AREAS OF CUT/FILL. THA tors
| 1 4 RPIZ8795
Hoy
a 1
bu
Ny
PROPOSED . veer
GARAGE ee)
FALL. 6.300 i. | 14
| |
|
se ee ~ ee i Se,
EXISTING SEWER fi 3 : ‘ eet
HARHOLE ” 7) \— existing waTeR PROPERTY
LL 4.88 | | CORMECTION TO REMAN 70
(L323 SERVICE, SED, HOUSE,
ce ea | 8 lors Lor 8
| | Rp i2saze ReLATS
+ PROPOSED RESIDENTIAL DRIVEWAY +
Ht ACCORDANCE WITH STD DWG, *
SEQ R-050, .
TOBE NEATLY REMOVED. REFER*
TO OWG C06 FOR ‘BETAILS. . .
TRANSITION Fre EXISTING
VERGE PROFILE TO HATCH NEW
DRIVEWAY LEVELS (hth MAX).
‘TURF ALL AREAS OF CUT/FILL.
nw
|
I
{
L
L
EXISTING DRIVEWAY
| se — ce — thee =~ wie tre i et ee I
i | |
———— bd
INSET_A.
4400 af A3
STATES
* yooctal 6 of 27 3 & Se
PROACT MME &
FOR APPROVAL
Date | OF ) Aa very st ceeuiors a0
Ey pivitaie APS TieTTaTe
£200 at AI
Ta pan Orbe vytne tot ng nto z . ) (Cleat GEOFE A REGHA ACTON } foasccet SHO [orovn Sudha TGP} fritte a * Gate. MARCH 2015 [Scot AS SHOWN
wate drtaead So ee atetel| | EY NAD RE BUNDABERG, GEADSTONE | SUNSHINE COAST | J 7 ci PROPOSED ORIVEWAY ACCESS Apron. DETAIL LAYOUT PLAN Tob Ref Na: | Grawing Noz| _tssud:
Peter presia th eaiau Wregecet aces hota Glyn RANCH Man tSGE Ot RO a¥ feta GEO af
pevsrrucmséniglain | | ENGINEERING [ames Beieiie Nad WEYBA ESPLANADE : SC-5054 coo | A
2 ead aes tne parade sd te = ROOSA C TROY PAULSEN 7 RPEG: 690 ~
Page 29
STANDARD DETAILS REFERENCE TABLE
ALL REFERENCED STANDARD PLANS ARE AVAILABLE .ON REQUEST
\
ITEM [| PLAN TYPE | PLANNo.
ROAD WORKS
RESIDENTIAL DRIVEWAY CROSSING IPWEAQ SEQ _R-050
CONCRETE RIBBON FOOTPATH IPWEAQ SEQ R-065
DRAINAGE WORKS
KERB AND CHANNEL ORAINAGE CONNECTION | IPWEAG SEQ R-081
KERBS AND CHANNELS IPWEAG SEQ R-080
PIPE INSTALLATION DETAILS IPWEA D-0030
SUB-SURFACE DRAINAGE DETAILS IPWEAO SEQ R-160
SEWERAGE RETICULATION WORKS
HOUSE CONNECTIONS | Pwea | s-0030
MISCELLANEOUS
\_ SEDIMENT & EROSION CONTROL DEVICES | IPWEA | b-0000, 0-0041
CONCRETE NOTES
4, CONCRETE N32 FOR ORIVEWAYS. N25 FOR PATHWAYS.
tH REFERENCE 10 AS1379/AS3600,
% ALL CONCRETE TO BE BROOM FINISHEO, FINISHES
OTHER THAN BROOM CONCRETE ARE TO BE
SPECIFICALLY APPROVED BY SUPERINTENDENT, WITH
REGARDS FOR LONG TERM SKID RESISTANCE ARO
QURABRITY,
3. PATTERN LINES TO BE SQUARE TO SIDES & FINISHED,
WITH APPROVED GROOVING TOOL,
4, F-NI2 TRIBHER BARS 2.0m LONG TO BE PLACED AT
AUL RE-ENTRANT CORNERS,
-
SI
2
HSL.
Bbw COGE THKKENNG EAC
FOR RETAINING (eb
PURPOSES ONLY.
Stim BEODING SAND B SINGLE
LAYER OF VISQUEEN VAPOUR
BARRIER
DRIVEWAY RETAINING DETAIL
1:20 af Al
PROPERTY BOUNDARY
SAWCUT Jom WIDE BY 38 DEEP ————>:
USING SOFF CUT SAW AS SOON AS
CONCRETE IS TRAFFICABLE & WITHIN
12-HOURS OF SLAB POUR
SLI2 HESH,
[ 4S TOP COVER
fe
= eT ve
BREAK ae
BREAK] OF MESH IN LINE WITH JOINT
SOmm BEDDING SAND & SINGLE LAYER
OF VISQUEEN VAPOUR BARRIER
Tay |
SEALANT RESERVOIR &
APPROVE SEALANT
SAW CUT JOINT DETAIL (SCJ)
420 of AI
2.5m @ 18
[email protected]
1
|
1
tom @ 46
14m @ 1214
_jom @ 18 3.0m @ £40
EXISTING SEAL
DRIVEWAY AS
DETAILED.
SECTION
NOT TQ SCALE
INDICATES EXISTING
SURFACE LEVEL.
90 TO F-NIZ TRIMMER EACH
Ale Gaby. OOMEL DOWEL SIDE OF JONT
sab Lov CENTRE /,-- WATERPROOFING
COMPOUND 20mm OFEP
Stein BEDDING SANO & SINGLE LAYER
‘OF VISQUEEN VAPOUR BARRIER
DOWEL CONTROL JOINT DETAIL (DC)
20 af AY
GARAGE RL 6,30
Sean
FOR APPROVAL
ante | ore} UE Vee
2 Figaat ages Ine precedece Gn weed,
St Gourds tn the
Aes pies ae peesieenye
TES cats dts eqpusedeer oye , 6 " {Geert TROFE_& REGHA ACTON + ”) foasigaed SHO [OroupeSHO% [fpeckes TOP) (Tite: Cate: MARCH 2095 [Secte. AS SHOWN
pecipad Comraatau emma) DNA DP il RE. ssoctemes, Shoneauec: antsrinsier™ | [Projet PROPOSED ORIVEWAY ACCESS FPS, SE STANDARD DETAILS ' a Job Ref No: | raving Wor] _tssuer
se ameets pumies af The agree, letrrgarett DORA TN Aaldes QUE FORGO CalamelCaM 9M JOR UT Awan GEO
Beng way cay read & legal alan, Tasca rene Tatars Hod WEYBA ESPLANADE
ENGINEERING ¢ ROSA TROY PAULSEN / RPEG: 6990 SC-5054 C06 A
Page 30
bate
oft
INDICATES PROPOSED BUILONG
OUTLINE DRAWN INDICATIVELY,
PROPOSED |
BUILDING |
oo
—T
— meme
fener —
axa
\ 520m CAR
TURNNG PATH,
CAR metérs
Width + 194
Track + 1.84
Lock ta Lock Time 6.0
Steering Angle : 335
DESIGN VEHICLE PROFILES
PROXCT NUE & AES
iSGat Al e@
$400 ot AD
$5
t
suas
FOR APPROVAL
tS 2b 25a
ORS, poy al satu ian __ a (Clcsts” CEOE BREGHA” ACTON } {Gesigced SMO [orev SHG, [Checked TGP - ) (Titte: ate: MARCH 2015 [Scale. AS SHOWN
ik We jet ef Ihe ener en'agy fh Ye a 5 : ; es
wecometeroment Soret! | NA PAL RF EeSQeERS . ARTONE, SUMSBINE COAST | [evejech PROPOSED DRIVEWAY ACCESS Wits) gl = TURNPATH PLAN » Job Ref No "| Browing Nar] Issues
The tyrise peawiren of the mptee ifiogeet fs Sonasiys enter QUOT POEN(RG ederae IN 9D AN) AD ot Mirindde CO) 45Y
1 Represent Wiggin ENGINEERING pou Pau Pasi Nog WEYBA ESPLANADE SC-5054 7p | A
i Vipevaetice nee ne Renn Aran * * NoosA TROY PAWLSEN 7 RPEG: 6990) | J
Used in these records
OPW15/0035 Operational Works application for driveway relocationRelated documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.