Skip to the record
The gold standard in government transparency.

Council archive · source document

OPW15/0035 Operational Works application for driveway relocation

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

a)

b)

Table B

What is the nature of the operational work? (Tick all applicable boxes.)

(-] Road works {| Stormwater [_] Water infrastructure
([] Drainage works [| Earthworks ([_] Sewerage infrastructure *
[_] Landscaping []_ Signage [] _ Clearing vegetation under the planning scheme

 

{X]  Other—provide details | Residential Driveway Relocation

 

 

\s the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)

 

J No [| Yes—specify the number of lots being created

 

 

 

No [(] Yes—provide details below

c) Are there any current approvals associated with this application? (E.g. material change of use.)

.

 

List of approval reference/s Date approved (dd/mm/yy)

Date approval
e

lapses (dd/mm/yy)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mandatory supporting information

 

 

 

 

 

 

 

Mandatory supporting information

Confirmation of | Method of

 

 

 

recommended scales) which shows the following:

the location and site area of the land to which the application relates
(relevant land)

the north point
the boundaries of the relevant land

the allotment layout showing existing lots, any propdsed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)

any existing or proposed easements on the relevant land and their
function

any access limitation strips

all existing and proposed roads and access points qn the relevant land.

 

lodgement Jodgement
All applications involving building work or operational work 5
Asite plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are X Confirmed

 

 

 

IDAS form 6—Building or operational werk assessable
against a planning scheme
Version 3.0—1 July 2013

©

 

Used in these records

About this file

File size
12.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0035 Operational Works application for driveway relocation.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.