                                                                                                                             CONTRACTOR TO CONFIRM SOIL TYPE AND
                                                                                                                                                                                   THIS DEVELOPMENT MAY REQUIRE THE IMPLEMENTATION                                                             GEOTECHNICAL RECOMMENDATIONS / BULK EARTHWORKS NOTES                                                          EARTHWORKS SEQUENCE
                                                                                                                             ACCEPTABLE TEMPORARY BATTER ANGLE
                                                                                                                             WITH GEOTECHNICAL ENIGINEER PRIOR TO
                                                                                                                                                                                  OF SOIL RETENTION METHODS DURING CONSTRUCTION. IT                                                           1.      TOPSOIL STRIPPED FROM SITE TO BE USED FOR FINAL TOPSOIL PRIOR TO IMPORT OF ADDITIONAL TOPSOIL.     1.        INSTALL ALL VEGETATION PROTECTION, EROSION AND SEDIMENT CONTROL, AND SITE SPECIFIC MEASURES
                                                                                                                             UNDERTAKING EARTHWORKS                               IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THESE                                                           2.      EXCESS CUT MATERIAL TO BE SPREAD ON-SITE AS PER THE SUPERINTENDENTS INSTRUCTIONS                             PRIOR TO THE COMMENCEMENT OF ANY WORK
                                                                                                                                                                                    WORKS ARE CERTIFIED BY A SUITABLY QUALIFIED RPEQ                                                          3.      SOLID EARTHWORKS VOLUMES SHOWN. (NO BULKING FACTOR USED)                                           2.        STRIP ALL TOPSOIL / ORGANIC MATERIAL FROM CONSTRUCTION AREA AND REMOVE FROM SITE OR
                                                                                                                                                                                                                                                                                              4.      BULK EARTHWORKS ASSUMED ONLY. NO DETAILED DESIGN HAS BEEN UNDERTAKEN.                                        STOCKPILE AS DIRECTED BY SUPERINTENDENT.
                                                                                                                             CONTRACTOR TO CONFIRM LOCATION OF ALL                   AND INSTALLED PRIOR TO COMMENCING FILLING AND                                                            5.      BULK EARTHWORKS LEVELS HAS NOT ALLOWED FOR STRUCTURAL DESIGN OF FOOTINGS, DEPRESSIONS,             3.        EXCAVATE MATERIAL AS INDICATED ON THE BULK EARTHWORKS PLAN
                                                                                                                             SERVICES TRAVERSING OR ADJACENT TO THE                    EXCAVATION WORKS AS INDICATED ON THIS PLAN                                                                     FALLS AND HYDRAULICS U.N.O. THESE ARE ADDITIONAL EXCAVATIONS AND SHALL BE DETERMINED ON SITE       4.        PRIOR TO PLACING FILL, PROOF ROLL EXPOSED SUB-GRADE WITH AN 8 TONNE (MIN) ROLLER OR WATER
                                                                                                                                                                                                                                                                                                      BY THE CONTRACTOR. ANY EXCESS MATERIAL REMOVED FROM SITE WILL REQUIRE TO BE REPLACED AS PER                  TRUCK TO DETECT THEN REMOVE SOFT SPOTS, REPLACE UNSUITABLE MATERIAL WITH SUITABLE GRANULAR
                                                                                                                             DEVELOPMENT SITE PRIOR TO UNDERTAKING                                                                                                                                    THE MINIMUM COMPACTION REQUIREMENTS                                                                          MATERIAL AND COMPACT TO THE MINIMUM COMPACTION REQUIREMENTS LISTED.
                                                                                                                             WORKS.                                                     ANY DAMAGE TO EXISTING ROADWAYS WILL BE                                                               6.      ALL EXCESS MATERIAL REMOVED AS DIRECTED BY CIVIL, STRUCTURAL OR GEOTECHNICAL ENGINEER HAS                    (TO BE UNDERTAKEN IN THE PRESENCE OF A CIVIL / GEOTECHNICAL ENGINEER)
                                                                                                                                                                                                                                                                                                      NOT BEEN INCLUDED IN THESE CALCULATIONS.                                                           5.        GEOTECHNICAL ENGINEER TO UNDERTAKE SUB-GRADE COMPACTION TESTING TO LEVEL 1 AS PER AS 3798
                                                                                                                                                                                       RECTIFIED BY THE CONTRACTOR AT HIS EXPENSE.                                                            7.      ALL ARCHITECTURAL FINISHED SURFACE LEVELS SUPERSEDE THOSE INDICATED ON THE BULK EARTHWORKS                   (2007) AND PROVIDE CBR VALUES FOR ADJUSTMENT TO PAVEMENT DESIGN
                                                                                                                             CONTRACTOR TO PROTECT ALL SERVICES                                                                                                                                       PLAN. THE CONTRACTOR SHALL CONFIRM THE FINAL PAD LEVEL REQUIRED TO SUIT THE STRUCTURAL             6.        FILLING IS TO BE PLACED AND COMPACTED IN MAXIMUM 150mm LAYERS AND TO THE MINIMUM COMPACTION
                                                                                                                             TRAVERSING OR ADJACENT TO THE                                                                                                                                            DESIGN WITH THE STRUCTURAL DRAWINGS PRIOR TO COMMENCEMENT OF WORK.                                           REQUIREMENTS LISTED.
                                                                                                                             DEVELOPMENT SITE AT ALL TIMES                               ALL ENVIRONMENTAL MEASURES INCLUDING                                                                 8.      REFER GEOTECHNICAL REPORT / ENGINEER FOR SUITABILITY OF MATERIAL WON FROM EXCAVATION AS            7.        AFTER ALL BULK EARTHWORKS HAS OCCURED, PROOF ROLL THE FINISHED PAD LEVEL WITH AN 8 TONNE
                                                                                                                                                                                                                                                                                                      BACKFILL                                                                                                     (MIN) ROLLER OR WATER TRUCK TO DETECT THEN REMOVE SOFT SPOTS, REPLACE UNSUITABLE MATERIAL
                                                                                                                                                                                         VEGETATION PROTECTION AND EROSION AND                                                                9.      MOST OF THE MATERIAL WON FROM EXCAVATION WOULD BE SUITABLE FOR REUSE AS COMPACTED FILLING                    WITH SUITABLE GRANULAR MATERIAL AND COMPACT TO THE MINIMUM COMPACTION REQUIREMENTS LISTED.
                                                                                                                             REFER STRUCTURAL ENGINEER FOR DETAILS                      SEDIMENT CONTROL SHALL BE IN PLACE PRIOR                                                                      APART FROM ANY MATERIAL LISTED AS UNSUITABLE MATERIAL, OR ANY OVERSIZED MATERIAL (GENERALLY >
                                                                                                                                                                                           TO THE COMMENCEMENT OF ANY WORK                                                                            150mm IS NOT RECOMMENDED)
                                                                                                                             OF TEMPORARY SOIL RETENTION METHOD                                                                                                                               10.     WHERE NATURAL LEVELS ARE CUT - DEEP TYNE EXPOSED SURFACE SOILS TO AN ADDITIONAL DEPTH OF               BASEMENT / TANK EXCAVATION NOTES
                                                                                                                                                                                                                                                                                                      300mm, WITH THE ADDITION OF WATER, AS NECESSARY, TO ADJUST THE MOISTURE CONTENT TO + / - 2 % OF
                                                                                                                                                                                                                                                                                                      THE STANDARD OPTIMUM MOISTURE CONTENT. REFER TO GEOTECHNICAL REPORT FOR FURTHER                    1.        THE EXCAVATION METHOD SHALL BE ADVISED BY A RPEQ GEOTECHNICAL ENGINEER.
                                                                                                                             ANY DAMAGE TO EXISTING ROADWAYS WILL BE                         THE CONTRACTOR IS TO PRODUCE A                                                                           TREATMENT OF SUB-GRADE MATERIALS                                                                   2.        METHOD OF CONSTRUCTION IS TO BE PROVIDED TO THE RPEQ GEOTECHNICAL ENGINEERBY THE BUILDER.
                                                                                                                             RECTIFIED BY THE CONTRACTOR AT HIS                           MANAGEMENT PLAN FOR CONTROL OF DUST                                                                 11.     PROVIDE TRAFFICABLE BASE TO BOTTOM OF EXCAVATION ANY SURPLUS WATER TO BE PUMPED OUT and            3.        NAXOS ENGINEERS ARE NOT RESPONSIBLE FOR ANY DESIGN OF TEMPORARY WORKS OR METHOD OF
                                                                                                                                                                                                                                                                                                                                                                                                                   EXCAVATION/CONSTRUCTION.
                                                                                                                             EXPENSE.                                                        AND AIR EMISSIONS DURING WORKS.                                                                          DISPOSED OF THROUGH SAND FILTER and PUMPED INTO STORM WATER. REFER EROSION AND SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                                         4.        NO EXCAVATION IS TO BE COMMENCE UNTIL THE RPEQ GEOTECHNICAL ENGINEER HAS ENDORSED THE
                                                                                                                                                                                                                                                                                                      CONTROL PLAN FOR LOCATION OF SUMP (IF REQUIRED)
                                                                                                                                                                                                                                                                                              12.     CONTRACTOR IS RESPONSIBLE TO VERIFY AND ESTABLISH THE QUANTITIES AS THE VOLUMES PROVIDED ARE                 METHOD OF CONSTRUCTION AND HAVE DETERMINED THE SLOPE STABILITY OF OPEN FACE CUT / SLOPE.
                                                                                                                                                                                           NO DUST IS TO EXTEND BEYOND THE SITE                                                                                                                                                                          5.        ALL SURROUNDING BUILDINGS MUST BE PROTECTED FROM ANY MOVEMENT / SETTLEMENT THAT IS CAUSED
                                                                                                                                                                                                                                                                                                      ESTIMATES ONLY
                                                                                                                             EXACT 'AS CONSTRUCTED' LOCATION OF                           BOUNDARY INCLUDING VEHICLES ENTERING                                                                                                                                                                                     BY THE EARTHWORKS ACTIVITIES.
                                                                                                                                                                                                                                                                                              13.     IF RETAINING WALLS ARE TO BE DESIGNED BY NAXOS ENGINEERS, SOIL TESTING MUST BE CARRIED OUT BY
                                                                                                                             SERVICES ARE TO BE LOCATED PRIOR TO                                   AND LEAVING THE SITE.                                                                              CERTIFIED NATA SOIL TESTING COMPANY TO PROVIDE BEARING CAPACITY FOUND ON SITE.                     6.        NAXOS ENGINEERS TAKE NO RESPONSIBILITY FOR ANY CONSTRUCTION METHODOLOGY AND SEQUENCE OF
                                                                                                                             PIERS AND FOUNDATIONS BEING FORMED.                                                                                                                                                                                                                                                   WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                         7.        NO VIBRATION EQUIPMENT IS TO BE USED OR ALLOWED DURING THE EXCAVATION OF THE BASEMENT.
                                                                                                                                                                                                                                                                                               BULK EARTHWORKS APPROVAL                                                                                  8.        ANY DEWATERING OF GROUND WATER MUST SEEK THE ADVISE OF THE RPEQ GEOTECHNICAL ENGINEER.

                                                                                                                             REFER STRUCTURAL DRAWINGS FOR DETAILS                     EROSION AND SEDIMENT CONTROL (ESC) MEASURES TO                                                         1.      APPROVAL IS REQUIRED BY ALL RELEVANT AUTHORITIES PRIOR TO THE COMMENCEMENT OF WORKS ON SITE.
                                                                                                                             OF PROPOSED RETAINING WALL                                                                                                                                       2.      THE BULK EARTHWORKS PLANS AND ALL SUPPORTING INFORMATION, INCLUDING ALL EROSION AND                    TYPICAL EARTHWORKS EMBANKMENT NOTES
                                                                                                                                                                                       BE INSTALLED PRIOR TO COMMENCEMENT OF WORK.                                                                    SEDIMENT CONTROL PLANS, SHALL REMAIN ON SITE AT ALL TIMES.
                                                                                                                             CONSTRUCTION                                                                                                                                                                                                                                                                1.        IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT THE SITE WORKS DO NOT COMPROMISE / UNDERMINE
                                                                                                                                                                                                                                                                                                                                                                                                                   OR PLACE ADDITIONAL SURCHARGE ON ANY EXISTING STRUCTURES.
                                                                                                                                                                                          EROSION PLANS AND BUILDING REPRESENTATIVE                                                            EXISTING SERVICES                                                                                         2.        BATTER ANGLES MUST COMPLY WITH LOCAL AUTHORITY REQUIREMENTS AND ARE TO CONFORM TO THE
                                                                                                                             REFER STRUCTURAL DRAWINGS PREPARED BY
                                                                                                                                                                                          FAMILIAR WITH THE PLAN MUST BE ON SITE AT ALL                                                       1.      EXACT LOCATION OF ALL SERVICES, SHALL BE LOCATED PRIOR TO THE COMMENCEMENT OF WORK. IT IS THE                ABOVE DIAGRAM.
                                                                                                                             STRUCTURAL ENGINEER FOR FOOTING SLAB AND                                                                                                                                                                                                                                    3.        ALL BATTERS SHALL BE PROTECTED FROM EROSION, AND ADEQUATE EROSION AND SEDIMENT CONTROL
                                                                                                                                                                                                   TIMES DURING CONSTRUCTION                                                                          BUILDERS RESPONSIBILITY TO CONFIRM THE DEPTH AND LOCATION OF SERVICES, AND NAXOS ENGINEERS
                                                                                                                             WALL DETAILS.                                                                                                                                                                                                                                                                         MEASURES IN PLACE PRIOR TO THE COMMENCEMENT OF WORK.
                                                                                                                                                                                                                                                                                                      ACCEPTS NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE SERVICES SHOWN.
                                                                                                                                                                                                                                                                                                                                                                                                         4.        SHOULD THE ABOVE CONDITIONS NOT BE ACHIEVED NAXOS ENGINEERS MUST BE CONTACTED PRIOR TO ANY
                                                                                                                                                                                                                                                                                                                                                                                                                   SITE WORKS BEING UNDERTAKEN
                                                                                                                                                                                                                                                                                               ADJOINING PROPERTY
                                                                                                                                                                                                                                                                                              1.      IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THE EFFECTS OF THE EARTHWORKS DO NOT HAVE AN            PAD AND FINISHED LEVEL NOTES
                                                                                                                                                                                                                                                                                                      IMPACT TO THE NEIGHBOURING PROPERTIES. SHOULD AN ISSUE ARISE ON SITE THE CONTRACTOR SHALL
                                                                                                                                                                                                                                                                                                      INFORM THE SUPERINTENDENT IMMEDIATELY.                                                             1.        ACTUAL FINISHED LEVELS SHOWN ON THIS PLAN ARE FOR THE CONTRACTOR'S GUIDANCE ONLY. ACTUAL
                                                                                                                                                                                                                                                                                              2.      THE CONTRACTOR IS TO RECEIVE WRITTEN PERMISSION PRIOR TO ENTERING OR COMMENCING WORK                         FINISHED LEVELS SHALL BE SET-OUT IN ACCORDANCE WITH ARCHITECTURAL PLANS (REPORT ANY
                                                                                                                                                                                                                                                                                                      OUTSIDE THE DEVELOPMENT SITE, AND SHALL RECEIVE PERMISSION FROM EASEMENT HOLDERS AND LOCAL                   DISCREPANCIES TO NAXOS ENGINEERS IMMEDIATELY)
                                                                                                                                                                                                                                                                                                      AUTHORITY PRIOR TO WORK COMMENCING.                                                                2.        THE PAD LEVEL SHOWN WAS CALCULATED USING THE FOLLOWING PAVEMENT DESIGN, REFER STRUCTURAL
                                                                                                                                                                                                                                                                                                                                                                                                                   DRAWINGS FOR CONFIRMATION OF LEVELS.
                                                                                                                                                                                                                                                                                               AUTHORITY REGULATIONS
                                                                                                                                                                                                                                                                                              1.      WORK HOURS ARE TO BE AS PER LOCAL COUNCIL REQUIREMENTS. CONTRACTOR TO REFER LOCAL                 FFL                                     RL
                                                                                                                                                                                                                                                                                                                                                                                                                                 100 SLAB                             125 SLAB        RL                        50 TURF
                                                                                                                                                                                                                                                                                                      AUTHORITY WEBSITE FOR SUITABLE WORK HOURS.
                                                                                                                                                                                                                                                                                                                                                                                                        PL                       50 SAND        PL                    50 SAND         PL                        100 TOPSOIL
                                                                                                                                                                                                                                                                                              2.      ALL EROSION AND SEDIMENT CONTROL MEASURES, FENCES ,SITE SIGNAGE AND TEMPORARY DRAINAGE
                                                                                        FIRE ANT NOTE                                                                                                                                                                                                 MEASURES SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF WORK.
                                                                                        NOOSAVILLE IS LISTED WITHIN THE QUEENSLAND GOVERNMENT'S FIRE ANT                                                                                                                                      3.      ALL VEGETATION PROTECTION AND PRESERVATION MEASURES SHALL BE INSTALLED PRIOR TO                                BUILDING PAD                       PAVEMENT AREA                                   LANDSCAPE AREA
                                                                                        BIOSECURITY ZONE 2, CONTACT THE DPI ON 13 25 23 TO CHECK                                                                                                                                                      COMMENCEMENT OF WORK
                                                                                        RESTRICTIONS THAT MAY BE IMPOSED ON YOUR DEVELOPMENT.                                                                                                                                                                                                                                                           MINIMUM COMPACTION REQUIREMENTS
                                                                                        SHOULD FIRE ANTS BE ENCOUNTERED ON SITE THE DPI IS TO BE
                                                                                                                                                                                                                                                                                               SOIL CONTAMINATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          COHESIVE SOILS               COHESIONLESS SOILS
                                                                                        CONTACTED ON 13 25 23 IMMEDIATELY. DO NOT DISPOSE, OR DISTURB
                                                                                        NESTS, OR GROUND WHERE FIRE ANTS ARE APPARENT.                                                                                                                                                        1.      ANY SUSPECTED GROUND OR GROUND WATER CONTAMINATION SHALL BE INVESTIGATED BY A SUITABLY                                                                               MIN RELATIVE
                                                                                                                                                                                                                                                                                                                                                                                                                      APPLICATION                                                                       COHESION INDEX
                                                                                                                                                                                                                                                                                                      QUALIFIED GEOTECHNICAL ENGINEER.                                                                                                                                    COMPACTION %
                                                                                                                                                                                                                                                                                              2.      IF CONTAMINATED SOILS ARE ENCOUNTERED ON SITE, A CONTAMINATED SOILS REPORT IS TO BE
                                                                                                                                                                                                                                                                                                      UNDERTAKEN BY A GEOTECHNICAL ENGINEER OUTLINING APPROVED TREATMENT, OR ACCEPTABLE                       1         RESIDENTIAL - ALLOTMENT FILL, BUILDING PADS              95                            70
                                                                                                  LEVEL 1 COMPACTION                                                                                                                                                                                  DISPOSAL LOCATIONS FOR ALL MATERIAL REMOVED FROM SITE.                                                            (MAX20kPa SLAB, Max 100kPa FOOTINGS
                                                                                                  ALL FILLING ON SITE TO BE LEVEL 1 COMPACTED                                                                                                                                                 3.      FINAL APPROVAL FROM REGULATORY AUTHORITY MAY BE REQUIRED PRIOR TO DISTURBING IN-SITU                    2         COMMERCIAL - ALLOTMENT FILL, BUILDING PADS               98                            75
                                                                                                  FILL AS PER AS3798 UNLESS NOTED OTHERWISE                                                                                                                                                           MATERIAL.                                                                                                         (and Residential > Max Bearing from above)
                                                                                                  (NOTE TYPE 2 TESTING MAY ONLY BE USED FOR
                                                                                                  INDIVIDUAL RESIDENTIAL LOTS ONLY)                                                                                                                                                                                                                                                                           3         FILL TO SUPPORT PAVEMENTS
                                                                                                                                                                                                                                                                                               CONSTRUCTION RECORDS                                                                                                            GENERAL FILL                                      95                            70




                                                                                                                                                                                                          'H'
                                                                                                                                                                                                                                                                                                                                                                                                                               SUBGRRADE (depth to 0.3m below box)               98                            75
                                                                                                                                                                                                                                                                                              1.      ADEQUATE RECORDS SHALL BE KEPT THROUGHOUT CONSTRUCTION INCLUDING BUT NOT LIMITED TO;
                                                                                         FILL                                                   CUT                                                                                                                                                    · LOCATION AND QUANTITY OF EXCESS CUT (DUMP SITE)
                                                                                                                                                                                                                                                                                                                                                                                                             MINIMUM COMPACTION NOTES
                                                                                                                                                                                                                                                                                                       · THE AREAS ON SITE OF ALL FILL
                                                                                                                                                                                                                                                                                                       · LEVELS OF STRIPPED SURFACE                                                                     1.        REFER TABLE 5.1 AS 3798-2007 FOR NOTES RELATING TO MINIMUM COMPACTION TABLE
                                                                                                                                                                                                                                                                                                       · LOCATION OF ANY VEGETATION REMOVED                                                             2.        REFER TO GEOTECHNICAL REPORT FOR THE REQUIRED TREATMENT SPECIFIC TO THIS SITE
                                                    'H'




                                                                                                                                                                                                                                                                                                       · LOCATION OF SITE CONTAMINATION / UNSUITABLE MATERIAL
                                                                                                                                                                                                                                                                                                       · LEVELS AT COMPLETION OF BULK EARTHWORKS WORK
                                        GROUND
                                NATURAL                                                                                                                                                                                                                                                                · DETAILS OF SUB-GRADE TEST ROLLING (PROOF ROLLING)
                                        D LEVEL                                                                                                                                                                                                                                                        · TYPES / SOURCE OF FILL MATERIAL
                                 STRIPPE                                        TYPICAL EARTHWORKS DETAIL (NOT SITE SPECIFIC)                                                                                                                                                                          · LOCATION, LEVEL AND RESULT OF EACH COMPACTION TEST
                                                                                                                                                                                                                                                                                                       · RECORD OF ALL ACTIONS TAKEN ON SITE


                                                                                                                                                                                                                                                                                               UNSUITABLE MATERIALS
                                                                                                                                                                                                                                                                                              1.      REFER TO GEOTECHNICAL ENGINEER, AS REQUIRED, FOR DETERMINATION OF SUITABILITY OF MATERIAL WON
                                                          BATTER ANGLES - SHORT TERM                                                                                                                                                                                                                  ON SITE, OR BORROW PIT TO BE USED AS FILL MATERIAL.
                                                                                                                                                                                                                                                                                              2.      ALL UNSUITABLE FILL SHALL BE EITHER REMOVED OR USED AS PER THE RECOMMENDATIONS IN THE
                                                                  SLOPE = H : L                                                                                                                                                                                                                       GEOTECHNICAL REPORT.
                                                                                                       MATERIAL TYPE (REFER GEOTECHNICAL REPORT)                                                                                                                                              3.      PRIOR TO ANY EARTHWORKS STRIP TOPSOIL CONTAINING ORGANIC MATTER FROM BUILDING + PAVEMENT
                                                                                H                                                                                                                                                                                                                     AREAS TO AN APPROX. DEPTH OF 0.10m. SPOIL MATERIAL AS DIRECTED BY THE MANAGER. REMOVE RUBBLE,
                                                           H ≤ 2.0M
                                                                            L       STABLE ROCK       SAND            SILT        FIRM CLAY       SOFT CLAY     SOFT SOILS                                                                                                                            OVER SATURATED MATERIALS AND ALL ORGANIC MATTER.

                                                           COMPACTED FILL              1:1            1:3            1:4             1:2              N/A         N/A
                                                           CUTTING                     N/A            1:3            1:4             1:2              1:3         N/A                                                                                                                          TESTING / INSPECTIONS

                                                          * N/A - REFER TO GEOTECHNICAL REPORT FOR TREATMENT OF UNSUITABLE MATERIAL                                                                                                                                                          1.      ALL TESTING OF EARTHWORKS SHALL BE DONE AT THE CONTRACTORS EXPENSE, UNLESS NOTED
                                                          Note: ALL BATTER ANGLES APPROXIMATELY ONLY AND ARE TO BE CONFIRMED BY GEOTECHNICAL ENGINEER                                                                                                                                                OTHERWISE.
                                                                                                                                                                                                                                                                                              2.     SHALL A SUB-GRADE OR PROOF ROLL INSPECTION FAIL, OR ADDITIONAL INSPECTIONS BE REQUIRED FOR ANY
                                                                                                                                                                                                                                                                                                     REASON OUTSIDE, THE CONTRACTOR WILL WEAR THE COSTS OF ANY SUBSEQUENT RE-INSPECTIONS,
                                                                                                                                                                                                                                                                                                     UNLESS NOTED OTHERWISE.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                ISSUE FOR APPROVAL
                                                            AMENDMENTS                                                                                        Associated Consultant:                                         Surveyor:                               RP Description:                     North:                                                                      Client:                                                                                               Scale:

No.     DATE                          DESCRIPTION         DRAWN       No.       DATE                           DESCRIPTION                            DRAWN
                                                                                                                                                              E.J. GRECH & ASSOCIATES PTY LTD                                 CRUC SURVEYS                                       LOT 58                                                                                                         E.J. GRECH & ASSOCIATES PTY. LTD.                                                                      N.T.S.
A     28.08.2024 PRELIMINARY ISSUE                          NP                                                                                                                                                               Plan Ref.: 1729_TP                                RP228905




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                     Project:                                                                                              Job No.
B     14.10.2024 ISSUE FOR APPROVAL                         JB                                                                                                                                                               Level Datum:                            Size of Land:                       Orig. Drg. Size
                                                                                                                                                                                                                             RL
                                                                                                                                                                                                                                                                              2863m²
                                                                                                                                                                                                                                                                                                                                                                                        PROPOSED WAREHOUSE AND TRADE HUB DEVELOPMENT                                                                   24-099
                                                                                                                                                                                                                                                                                                                                    T 1300 598 544
                                                                                                                                                              Approved: GREGG TYQUIN                  Drawn:    Design:       IMAGERY, CADASTRAL AND SURVEY DATA DISCLAIMER                                                         E [email protected]                                                    58 RENE STREET                                                         Drawing No.
                                                                                                                                                                                                         NP        NP
                                                                                                                                                                                                                              While every care is taken by NAXOS Engineers Pty Ltd to ensure the accuracy of the data
                                                                                                                                                                                                                              supplied by local authorities, dial before you dig (dbyd) records, as constructed information         Level 1, Suite B
                                                                                                                                                                                                                                                                                                                                                                                                                  NOOSAVILLE, QLD 4566                                                                  C305
                                                                                                                                                                                                                              and detailed survey, we make no representations or warranties about its accuracy, reliability,        557 Gregory Terrace, Fortitude Valley Qld 4006
                                                                                                                                                                                                      Checked: Supervisor:    completeness or suitability for any particular purpose and disclaim all responsibility and all        PO Box 224, Spring Hill QLD 4004                 Title:                                                                                                Revision:
                                                                                                                                                                                                                              liability (including without limitation, liability in negligence) for all expenses, losses, damages
                                                                                                                                                              RPEQ. 1528           Date: 14.10.2024      GT        GF         (including indirect or consequential damage) and costs which may be incurred as a result of
                                                                                                                                                                                                                              data being inaccurate or incomplete in any way and for any reason.
                                                                                                                                                                                                                                                                                                                                    NAXOSENGINEERS.COM.AU                                           EARTHWORKS GENERAL NOTES                                                                               B
Log in to download the original file

24-099 RENE (58) - Fullset [B].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.