                                                                                                                                                                                                                                                                         TEMPORARY CONSTRUCTION ENTRY/EXIT RUMBLE GRID NOTES

                                                                                                                                                                                                                            MATERIALS                                                                                                                                                     MAINTENANCE                                       REMOVAL
                                                                                                                                                                                                                            ROCK: WELL GRADED, HARD, ANGULAR,                                        4. ENSURE THAT THE INSTALLATION OF                                                   1. INSPECT VIBRATION GRID PRIOR TO                1. THE VIBRATION GRID SHOULD BE
                                                                                                                                                                                                                            EROSION RESISTANT ROCK, NOMINAL                                          THE VIBRATION GRID HAS ADEQUATE                                                      FORECAST RAIN, DAILY DURING                       REMOVED ONLY AFTER IT IS NO LONGER
                                                                                                                                                                                                                            DIAMETER OF 50 TO 75mm (SMALL                                            SEDIMENT STORAGE VOLUME UNDER                                                        EXTENDED PERIODS OF RAINFALL,                     NEEDED AS A SEDIMENT CONTROL
                                                                                                                                                                                                                            DISTURBANCES) OR 100 TO 150mm                                            THE GRID. WHERE NECESSARY, INSTALL                                                   AFTER SIGNIFICANT                                 DEVICE.
                                                                                                                                                                                                                            (LARGE DISTURBANCES). ALL                                                SUITABLE PRECAST SEDIMENT                                                            RUNOFF-PRODUCING RAINFALL, OR
                                                                             ENTRY / EXIT NOTES                                                                                                                                                                                                      COLLECTION CHAMBERS.                                                                 OTHERWISE AT FORTNIGHTLY                           2. REMOVE MATERIALS AND COLLECTED
                                                                             1.      TEMP CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP.                                                                                            REASONABLE MEASURES MUST BE
                                                                                                                                                                                                                            TAKEN TO OBTAIN ROCK OF NEAR                                                                                                                                  INTERVALS.                                         SEDIMENT AND DISPOSE OF IN A
                                                                                1.a.       ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY
                                                                                           FROM ENTRY/EXIT.                                                                                                                 UNIFORM SIZE.                                                           5. PLACE A ROCK PAD/RAMP FORMING A                                                                                                       SUITABLE MANNER THAT WILL NOT
                                                                                1.b.       WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING                                                                                                                                                        MINIMUM 200mm THICK LAYER OF CLEAN,                                                   2. IF SAND, SOIL, SEDIMENT OR MUD IS               CAUSE AN EROSION OR POLLUTION
                                                                                           WET WEATHER.                                                                                                                     FOOTPATH STABILISING AGGREGATE: 25                                      OPEN-VOID ROCK OVER THE ROADWAY                                                       TRACKED OR WASHED ONTO THE                         HAZARD.
                                                                             2.      SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES,                                                                                         TO 50mm GRAVEL OR AGGREGATE.                                            BETWEEN THE VIBRATION GRID AND THE                                                    ADJACENT SEALED ROADWAY, THEN
                                                                                     INCORPORATE TRAFFIC CONTROL DEVICES TO THE SATISFACTION                                                                                                                                                        SEALED STREET TO PREVENT TYRES                                                        SUCH MATERIAL MUST BE PHYSICALLY                   3. RE-GRADE AND STABILISE THE
                                                                                     OF THE SUPERINTENDENT.                                                                                                                 GEOTEXTILE FABRIC: HEAVY-DUTY,                                          FROM PICKING UP MORE SOIL AFTER                                                       REMOVED, FIRST USING A                             DISTURBED GROUND AS NECESSARY TO
                                                                             3.      ALL DIMENSIONS IN MILLIMETRES UNLESS INDICATED OTHERWISE.                                                                              NEEDLE-PUNCHED, NON-WOVEN FILTER                                        THEY HAVE BEEN CLEANED.                                                               SQUARE-EDGED SHOVEL, AND THEN A                    MINIMISE THE EROSION HAZARD.
                                                                                                                                                                                                                            CLOTH (’BIDIM’ A24 OR EQUIVALENT).                                                                                                                            STIFF-BRISTLED BROOM, AND THEN BY A
                                                                                                            RUNOFF DIVERSION BUND INCORPORATED
                                                                                                            INTO THE PAD WHEN THE ENTRY/EXIT POINT IS                                                                                                                                               6. THE TOTAL LENGTH OF THE VIBRATION                                                  MECHANICAL VACUUM UNIT, IF
                                                      H3
                                                         .0mM
                                                              IN
                                                                                        15.
                                                                                           0m
                                                                                                            LOCATED DOWN SLOPE OF THE SOIL                                                                                  INSTALLATION                                                            GRID AND ROCK RAMPS SHOULD BE AT                                                      AVAILABLE.
                                                    DT                                                      DISTURBANCE. BERM (300mm MIN. HEIGHT)                                                                                                                                                   LEAST 15m WHERE PRACTICABLE, AND
                                                 WI                                             MIN
                                                                                                      IMU                                                                                                                   1. REFER TO APPROVED PLANS FOR                                          AS WIDE AS THE FULL WIDTH OF THE                                                      3. IF NECESSARY FOR SAFETY REASONS,
                                                                                                         M
                                                                                                                                                             NT                                                             LOCATION AND DIMENSIONAL DETAILS. IF                                    ENTRY OR EXIT AND AT LEAST 3m. THE                                                    THE ROADWAY SHALL ONLY BE WASHED
                                                                                                                                                        ME
                                                                        200mm




                                                                                                                                                       N
                                                                                                                                                    LIG                                                                     THERE ARE QUESTIONS OR PROBLEMS
                                                                         MIN.




                                                                                                                                             TY
                                                                                                                                                A                                                                                                                                                   ROCK RAMP SHOULD COMMENCE AT THE                                                      CLEAN AFTER ALL REASONABLE
                                                                                                                                           ER                                                                               WITH THE LOCATION, DIMENSIONS, OR
                                                                                                                                   PR
                                                                                                                                     OP                                                                                                                                                             EDGE OF THE OFF-SITE SEALED ROAD                                                      EFFORTS HAVE BEEN TAKEN TO SHOVEL
                                    GEOTEXTILE FABRIC,
                                                                                                                                                                                                                            METHOD OF INSTALLATION, CONTACT                                         OR PAVEMENT.                                                                          AND SWEEP THE MATERIAL FROM THE
                                    BIDIM U34 OR SIMILAR                                                           .                                                                                                        THE ENGINEER OR RESPONSIBLE                                                                                                                                   ROADWAY.
                                                                                                            m   MIN
                                                                                                        3.0                                                                   NN
                                                                                                                                                                                 E   L                                      ON-SITE OFFICER FOR ASSISTANCE.                                         7. FLARE THE END OF THE ROCK PAD
                                                                                                                                                                         HA
                                    RUNOFF FROM PAD                                                                                                                    &C                                                                                                                           WHERE IT MEETS THE PAVEMENT SO                                                        4. WHEN THE VOIDS BETWEEN THE ROCK
                                                                                                                                                                  RB
                                    DIRECTED TO SEDIMENT TRAP                                                                                                KE                                                             2. CLEAR THE LOCATION OF THE                                            THAT THE WHEELS OF TURNING                                                            BECOMES FILLED WITH MATERIAL AND
                           UNBOUND PAVEMENT MATERIAL (GRAVEL)                                                                                                     AY                                                        VIBRATION GRID, REMOVING STUMPS,                                        VEHICLES DO NOT TRAVEL OVER                                                           THE EFFECTIVENESS OF THE ROCK
                                                                                                                                                         A DW
                                UNIFORMLY-SIZED CRUSHED ROCK                                                                                          RO                                                                    ROOTS AND OTHER VEGETATION TO
                                                                                                                                                EW                                                                                                                                                  UNPROTECTED SOIL.                                                                     RAMPS ARE REDUCED TO A POINT
                                                                                                                                              RN
                             (AVOID ROCK <40mm AND 75 TO 100mm)
                                                                                                                                         ING
                                                                                                                                            ,O                                                                              PROVIDE A FIRM FOUNDATION SO THAT                                                                                                                             WHERE SEDIMENT IS BEING TRACKED
                                                                                                                                   IST                                                                                      THE ROCK IS NOT PRESSED INTO SOFT
                                                                                                                              EX                                                                                                                                                                    8. IF THE FOOTPATH IS OPEN TO                                                         OFF THE SITE, A NEW 100mm LAYER OF
                                                           ENSURE VERGE IS PEDESTRIAN
                                                                SAFE DURING WORKS OR
                                                                                                                                                                                                                            GROUND. CLEAR SUFFICIENT WIDTH TO                                       PEDESTRIAN MOVEMENT, THEN COVER                                                       ROCK MUST BE ADDED AND/OR THE
                                                            DIVERSION ARE IMPLEMENTED                                                                                                                                       ALLOW PASSAGE OF LARGE VEHICLES,                                        THE COARSE ROCK WITH FINE                                                             ROCK PAD MUST BE EXTENDED.
                                                                                                                                                                                                                            BUT CLEAR ONLY THAT NECESSARY FOR                                       AGGREGATE OR GRAVEL, OR
                                                                   TEMPORARY CONSTRUCTION ENTRY / EXIT                                                                                                                      THE EXIT. DO NOT CLEAR ADJACENT                                         OTHERWISE TAKE WHATEVER MEASURES                                                      5. ENSURE ANY ASSOCIATED DRAINAGE
                                                                                                                                                                                                                            AREAS UNTIL THE REQUIRED EROSION                                        ARE NEEDED TO MAKE THE AREA SAFE                                                      CONTROL MEASURES ARE MAINTAINED
                                                                             SEDIMENT TRAP                                                                                                                                  AND SEDIMENT CONTROL DEVICES ARE                                                                                                                              IN ACCORDANCE WITH THEIR DESIRED
                                                                                                                                                                                                                            IN PLACE.                                                                                                                                                     OPERATIONAL CONDITION.

                                                                                                                                                                                                                            3. GRADE THE LOCATION OF THE                                                                                                                                  6. DISPOSE OF SEDIMENT AND DEBRIS IN
                                                                                                                                                                                                                            VIBRATION GRID SO THAT RUNOFF FROM                                                                                                                            A MANNER THAT WILL NOT CREATE AN
                                                                                                                                                                                                                            THE UNIT WILL NOT FLOW INTO THE                                                                                                                               EROSION OR POLLUTION HAZARD.
                                                                                                                                                                                                                            STREET, BUT WILL FLOW TOWARDS AN
                                                                                                                                                                                                                            APPROPRIATE SEDIMENT-TRAPPING
                                                                                                                                                                                                                            DEVICE.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 ISSUE FOR APPROVAL
                                                                                         AMENDMENTS                                                                                                  Associated Consultant:                                         Surveyor:                               RP Description:                     North:                                                                           Client:                                                 Scale:

No.     DATE                             DESCRIPTION                                DRAWN              No.             DATE                                                    DESCRIPTION   DRAWN
                                                                                                                                                                                                     E.J. GRECH & ASSOCIATES PTY LTD                                 CRUC SURVEYS                                       LOT 58                                                                                                                 E.J. GRECH & ASSOCIATES PTY. LTD.                     N.T.S.
A     28.08.2024 PRELIMINARY ISSUE                                                      NP                                                                                                                                                                          Plan Ref.: 1729_TP                                RP228905




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                                                                 Project:                                                Job No.
B     14.10.2024 ISSUE FOR APPROVAL                                                     JB                                                                                                                                                                          Level Datum:                            Size of Land:                       Orig. Drg. Size
                                                                                                                                                                                                                                                                    RL
                                                                                                                                                                                                                                                                                                                     2863m²
                                                                                                                                                                                                                                                                                                                                                                                                                                    PROPOSED WAREHOUSE AND TRADE HUB DEVELOPMENT                     24-099
                                                                                                                                                                                                                                                                                                                                                                           T 1300 598 544
                                                                                                                                                                                                     Approved: GREGG TYQUIN                  Drawn:    Design:       IMAGERY, CADASTRAL AND SURVEY DATA DISCLAIMER                                                         E [email protected]                                               58 RENE STREET                     Drawing No.
                                                                                                                                                                                                                                                NP        NP
                                                                                                                                                                                                                                                                     While every care is taken by NAXOS Engineers Pty Ltd to ensure the accuracy of the data
                                                                                                                                                                                                                                                                     supplied by local authorities, dial before you dig (dbyd) records, as constructed information         Level 1, Suite B
                                                                                                                                                                                                                                                                                                                                                                                                                                                    NOOSAVILLE, QLD 4566                             C211
                                                                                                                                                                                                                                                                     and detailed survey, we make no representations or warranties about its accuracy, reliability,        557 Gregory Terrace, Fortitude Valley Qld 4006
                                                                                                                                                                                                                                                                     completeness or suitability for any particular purpose and disclaim all responsibility and all        PO Box 224, Spring Hill QLD 4004                      Title:                                                  Revision:
                                                                                                                                                                                                                                             Checked: Supervisor:
                                                                                                                                                                                                                                                                     liability (including without limitation, liability in negligence) for all expenses, losses, damages                                                                    EROSION AND SEDIMENT CONTROL SHAKE
                                                                                                                                                                                                     RPEQ. 1528           Date: 14.10.2024      GT        GF         (including indirect or consequential damage) and costs which may be incurred as a result of           NAXOSENGINEERS.COM.AU                                                                                                       B
                                                                                                                                                                                                                                                                     data being inaccurate or incomplete in any way and for any reason.
                                                                                                                                                                                                                                                                                                                                                                                                                                                    DOWN DEVICE DETAILS
Log in to download the original file

24-099 RENE (58) - Fullset [B].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.