ORDINARY MEETING AGENDA 18 MAY 2017
5. Structures must be designed and constructed such that they are free standing within
the waterway and are not connected to or behind the revetment wall or rock wall. Upon
completion of works, a certification by RPEQ must be provided to Council in this regard.
6. All structures must have no detrimental effects on stormwater drains and/or
easements.
7. The jetty and deck areas must be constructed in a manner to render the underside
area vermin proof.
8. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above
the 1%AEP flood level.
9. Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.
10. Wastewater and sullage must only be disposed of at approved pumpout facilities.
11. The mooring facility must not be utilised for live-aboard purposes.
12. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act
EPA (1994) and the Environmental Protection (Water) Policy 2009.
13. Certification by a Registered Professional Engineer of Queensland that states that the
works have been constructed in accordance with best practice methods and are
structurally sound must be submitted to Council. This certification must be submitted
to Council within three (3) months of the date of this approval. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact
Council’s Planning Assessment Section (Development Audit & Response Officer
0428738563) to arrange the inspection.
14. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans.
15. All necessary State government approvals relating to this development must be
obtained.
3 OPW17/0016 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - PRESCRIBED
TIDAL WORKS (OYSTER REEF RESTORATION)
Cr Wellington declared a perceived conflict of interest in this matter (as defined in section 173 of the
Local Government Act 2009) due to his membership on the Noosa Biosphere Reserve Foundation
Board who are jointly involved in funding this project. Cr Wellington believed that he could consider
this item impartially and in the public interest and therefore remained in the meeting room for the
debate and decision on this matter. The CEO advised that in accordance with Section 173 (9) of the
Local Government Act 2009, Cr Wellington does not have an actual conflict as he was nominated by
Council to be a member of the board.
That Council note the report by the Coordinator Engineering, Mark Lewis to the Planning &
Environment Committee Meeting dated 9 May 2017 regarding Application No. OPW17/0016
for a Development Permit for Operational Works for Prescribed Tidal Works (Oyster Reef
Restoration Units) for 15 sites within the intertidal zone of the Noosa River situated at Noosa
Woods Park & Public Toilets, Claude Batten Drive, Noosa Heads and approve the application
in accordance with the following conditions:
Page 6 of 13