2021-09-07 Services & Organisation Committee Meeting Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Services & Organisation
     Committee Meeting


            Tuesday, 7 September 2021


                    commencing at 1.30pm
           Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Amelia Lorentson, Clare Stewart, Frank Wilkie




                       “Noosa Shire – different by nature”
Log in to download the original file

2021-09-07 Services & Organisation Committee Meeting Agenda(PDF, 2MB).pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 54 sections

Section 2

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA              7 SEPTEMBER 2021


TABLE OF CONTENTS


ITEM                                                                       PAGE

1      ATTENDANCE & APOLOGIES                                                3

2      CONFIRMATION OF MINUTES                                               3

3      PRESENTATIONS                                                         3

4      DEPUTATIONS                                                           3

5      REPORTS FOR CONSIDERATION OF THE COMMITTEE                            4

       1   GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT – CHRISTMAS 2021/22
           & EASTER 2022                                                     4

       2   CHANGE IN USE & TENURE - PART OF LOT 69 RP41223 AND PART OF
           LOT 2 RP839623                                                   12

       3   PROPOSED NEW LEASE – SHOP 8 SUNRISE NEIGHBOURHOOD
           SHOPPING CENTRE                                                  19

6      REPORTS FOR NOTING BY THE COMMITTEE                                  26

       4   NOOSA AQUATIC CENTRE (NAC) – FULL YEAR REPORT TO 30 JUNE 2021    26

       5   NOOSA COMMUNITY SUPPORT (NCS) – FULL YEAR REPORT TO 30 JUNE
           2021                                                             33

       6   NOOSA LEISURE CENTRE (NLC) – FULL YEAR REPORT TO 30 JUNE 2021    38

       7   THE J – FULL YEAR REPORT TO 30 JUNE 2021                         44

       8   BICENTENNIAL COMMUNITY CENTRE (BCC) – FULL YEAR REPORT TO 30
           JUNE 2021                                                        52

7      CLOSED SESSION                                                 55




                                                                    Page 2 of 55

Section 3

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                      7 SEPTEMBER 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the Services & Organisation Committee Meeting held on 10 August 2021 be
    received and confirmed.




3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




                                                                             Page 3 of 55

Section 4

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                             7 SEPTEMBER 2021


5    REPORTS FOR CONSIDERATION OF THE COMMITTEE


1    GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT – CHRISTMAS 2021/22 & EASTER
     2022

Author           Project Officer – Transport Innovation, Joanna Ferris
                 Infrastructure Services Department

Index            ECM/ Subject/ Transport Policy
                 ECM/ Project & Contract/ Transport Strategy / Car Parking Management
                 ECM/Project & Contract/ Transport Strategy / General

Attachments      Nil


EXECUTIVE SUMMARY
The Go Noosa peak period traffic management plan aims to manage traffic and congestion over the
Christmas and Easter school holidays. The plan includes a range of measures to encourage the use
of sustainable transport including free bus travel on existing TransLink bus services within Noosa,
provision of the high frequency Go Noosa loop bus, promotion of park & ride locations, promotion of
the Noosa ferry, variable message signs to raise awareness of alternative travel options, traffic
control and wayfinding signage to assist the movement of pedestrians, buses and vehicle flow and
collaboration with key stakeholders to market and promote Go Noosa.
RECOMMENDATION
That Council note the report by the Project Officer – Transport Innovation to the Services &
Organisation Committee Meeting dated 7 September 2021, and:
A.   Subject to TransLink agreement, approve the use of free travel on the temporary 065 Go
     Noosa Loop bus from 11 December 2021 - 23 January 2022 and 2 - 18 April 2022.
B.   Subject to TransLink agreement, approve the use of free travel on the temporary 064 Peregian
     Beach to Noosa Heads bus from 11 December 2021 - 23 January 2022 and 2 - 18 April 2022.
C.   Subject to TransLink agreement, approve the use of free travel on TransLink routes 626, 627,
     628, 629 and 632 from 11 December 2021 - 23 January 2022 and 2 - 18 April 2022.
D.   Delegate authority for the CEO to cancel, stand down and recommence free bus services
     based on the professional advice from Council’s COVID Safety Team and seeking the input
     from Noosa Chamber of Commerce, Tourism Noosa, the Transport Strategy Steering Group
     and Hinterland Business Representatives including advice and information from the
     Queensland Government recommended COVID Safe Public Transport Plan as to suggested
     best practice and policy guidelines as their primary Terms of Reference.
E.   Approve the continued promotion of the Noosa Ferry in Go Noosa marketing as an alternative
     mode of travel.
F.   Approve the use of the Noosa AFL ground, The J car park and Noosa Junction Transit Centre
     as Park & Ride locations.
G.   Approve the use of Variable Message Signs (VMS) at strategic locations from 11 December
     2021 - 23 January 2022 and 2 - 18 April 2022 for the purpose of informing motorists of car
     parking availability and alternative travel options to the Hastings Street precinct.
H.   Approve the use of traffic control in the Hastings Street precinct and surrounding areas to
     manage pedestrian, bus and vehicle movements from 11 December 2021 - 23 January 2022
     and 2 - 18 April 2022.


                                                                                     Page 4 of 55

Section 5

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                7 SEPTEMBER 2021


I.    Approve the use of wayfinding signage in the Hastings Street precinct, Noosa Junction and
      Noosaville from 11 December 2021 - 23 January 2022 and 2 - 18 April 2022 for the purpose
      of informing motorists of car parking availability and alternative travel options to the Hastings
      Street precinct.
J.    Approve the temporary conversion of 4 parallel car parks on the southern side of Hastings
      Street from the Hastings Street roundabout to 36 Hastings Street for other uses including,
      bicycle and scooter parking, and increased footpath, from 11 December 2021 - 23 January
      2022 and 2 - 18 April 2022.


REPORT
The purpose of this report is to seek Council approval for the implementation of the Go Noosa peak
period traffic management plan for the Queensland State School Christmas holiday period of 11
December 2021 – 23 January 2022 and the Queensland State School Easter Holiday period of 2 –
18 April 2022.

The Go Noosa peak period traffic management plan was first trialled in 2018 and has continued to
be used to manage peak period traffic congestion by aiming to reduce private vehicle traffic rather
than increase road capacity. The Go Noosa peak period traffic management plan initiatives are
aligned with the Noosa Transport Strategy principles and desired objectives.

1.    Go Noosa peak period traffic management plan 2021/22

The proposed Go Noosa peak period traffic management plan includes:
    Free buses
    Park & Ride
    Variable Message Signs
    Traffic Control
    Paid Parking –- Noosa Heads Lions
    Wayfinding signage
    Parallel parking changes in Hastings Street
    Marketing.

2.1   Free Buses

a.    Existing TransLink Services:
      The following existing TransLink bus services are recommended for inclusion in the 2021/22
      Go Noosa peak period traffic management plan:
          Route 626 – Tewantin to Sunrise Beach via Noosa Heads
          Route 627 – Tewantin to Sunshine Beach via Noosa Heads
          Route 628 – Noosa Parklands to Noosa Junction, via Noosa Civic
          Route 629 – Tewantin to Noosa Junction via Noosa Civic
          Route 632 – Noosa to Cooran via Cooroy and Pomona.
b.    Additional Bus Services:
           064 – Peregian Beach to Noosa Heads shuttle bus from 8am to 6pm
            Due to the TransLink ticketing system, the existing 620 bus service between Peregian
            Beach and Noosa Heads is unable to accommodate free travel on the Noosa component
            of the service. In order to offer a free service to residents and visitors between Peregian
            Beach and Noosa Heads, the 064 additional bus service is recommended.

                                                                                         Page 5 of 55

Section 6

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


           Council is aware that the operation of a free bus on the same route as a paid bus service
           does cause some confusion, however we aim to mitigate this with clear marketing.
           TransLink have advised that smart ticketing will be introduced in 2022 and ideally this
           will allow for free travel on Noosa journeys on Route 620 in the near future.
          065 Go Noosa Loop Bus
           The popular 065 Go Noosa Loop bus servicing Hastings Street, Noosa Drive, Weyba
           Road and Noosa Parade is recommended with services every 15 minutes from 7am-
           7pm and every 30 minutes from 7pm-10pm with the exception of 31 Jan when it is
           proposed to finish at 1am.
           Excluded Bus Services:
           The TransLink bus services 620, 630, and 631 travel outside of the Noosa Shire and are
           unable to be included in the free services due to the TransLink ticketing process as
           described above. Inclusion of the Noosa component of these services will be reviewed
           in the future once Trans Link’s Smart ticketing is introduced.
2.2   Park & Ride
To encourage people to park outside of the congested tourist areas and utilise free buses, Council
promotes the following dedicated Park and Ride locations:
     Noosa AFL grounds (approx. 400 car parks)
     The J (approx. 100 car parks)
     Noosa Junction Transit Centre (approx. 50 car parks are converted to 6P)
     Hide & Ride where people are also encouraged to park anywhere along the free bus routes
      and ferry route.
The Park & Ride locations are promoted through:
     Go Noosa directional signage
     Marketing material including posters and factsheets
     Variable Message Signs.
2.3   Variable Message Signs
Variable Message Signs (VMS) located on key routes around Noosa provide information on
expected car parking availability, and promote alternate travel options including free buses, park &
ride locations, bicycles and the ferry options.
2.4   Traffic Control
It is proposed to utilise traffic control, on an as needed basis, between 11 December 2021 – 23
January 2022 and 2 – 18 April 2022. The use and number of traffic controllers will be based on
anticipated demand and weather dependent.
The purpose of the traffic control is to:
     give priority to buses and pedestrians
     keep traffic moving so buses are not sitting in queues
     improve accessibility to the Noosa Heads area
     minimise traffic disruptions in the Noosa Heads area.
The use of traffic control is constantly monitored, evaluated and reviewed during operation with
changes made as required. Feedback is obtained from the community and key stakeholders and
incorporated into improvements to the operation of the traffic control. The Easter 2021 Go Noosa
survey data indicated that 63% of respondents found that the traffic control were effective at
prioritising the movements of buses, pedestrians and vehicle flow with 30% unsure. Additional
consultation with key stakeholders will be conducted prior to commencement.
The traffic controllers also undergo a specific Go Noosa training program to establish expected
customer service standards.

                                                                                      Page 6 of 55

Section 7

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                               7 SEPTEMBER 2021


2.5   Paid Parking - Noosa Heads Lions Park
As adopted at the Ordinary Meeting on 17 September 2020, the Noosa Heads Lions Park
greenspace will be used as an overflow car park during school holidays and long weekends for the
period of the public health declaration of the COVID-19 pandemic, weather dependent.
A request for inconsistent use of the park for paid parking has been entered into with the Department
of Natural Resources and Mines (DNRME). No further correspondence has been entered into with
DNRME due to the fact that the public health directive is still in place as such the park continues to
be used for paid parking during all school holidays and long weekends. Further discussions with
DNRME will occur as required.
The Tewantin-Noosa Lions Club will operate the car park from 8:30am to 5.00pm daily. Vehicles
are charged a flat rate of $20 (incl. GST) per day or part thereof. Revenue is shared 50/50 between
The Tewantin-Noosa Lions Club and Council.
Council’s revenue from paid parking funds:
   rectification of any damage/impact from parking on the reserve
     the hire of temporary fencing to protect children at the playground & BBQ area
     parking signage at Lions Park
     printing of tickets, and
     the use of traffic control to assist in the movement of pedestrians from Lions Park.
In addition, 50% of Council’s share will be held in reserve and allocated to recreational improvements
in the Noosa Heads Lions Park.
Paid parking at the Noosa Heads Lions park is not part of the above recommendations because use
of the park for paid parking during peak holidays was adopted at the 17 September 2021 Ordinary
Meeting (refer section on Previous Council considerations below).

2.6   Wayfinding
To further assist pedestrians and bus passengers, temporary wayfinding signage will be installed in
and around Noosa Heads and Noosa Junction as well as at bus stops.
It is also proposed to have a bus passenger assistant at the Noosa Heads Bus Interchange to assist
passengers with wayfinding on week-ends and public holidays.

2.7   End of Trip Facilities
It is proposed to investigate the provision of additional temporary bicycle racks and scooter parking
in high use areas.

2.8   Parallel parking – Hastings Street
In order to reduce vehicle traffic movements that impact on the Hastings St/Noosa Drive roundabout
it is proposed to temporarily convert four parallel car parking bays on the southern side of Hastings
Street to increase footpath space and temporary scooter parking.

2.9   Marketing and Evaluation
The Easter 2021 Go Noosa evaluation survey found that 40% of survey respondents were aware of
Go Noosa because they caught a free bus the previous year (this figure has been increasing each
year). Go Noosa aims to continue to build public awareness of the brand.
It is also proposed to use community and stakeholder networks to promote Go Noosa including
Noosa Junction Traders Association, Tourism Noosa, accommodation providers, Hastings Street
Association and TransLink.
The objectives of the Go Noosa marketing plan are to:


                                                                                        Page 7 of 55

Section 8

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


    Raise awareness of alternative transport options to driving, such as Park & Ride, Free Buses,
     walking and cycling and the Noosa Ferry.
    Offer a relaxed and stress free alternative to driving a car into the Hastings street precinct.
It is proposed to employ a number of different marketing methods including:
    Posters & Factsheets
    Energex pole banners
    Signage at bus stops
    Wayfinding signage
    Variable message signs
    Park and Ride signage
    Community radio announcements
    Paid newspaper advertisements
    Media launch
    Existing Apps (My TransLink, Moovit etc.)
    Noosa Council media channels – Facebook, website, newsletter, messages on hold etc.

3.   Evaluation
The performance of the Go Noosa peak period traffic management plan will be evaluated against
previous years’ data and assist in refining future peak period traffic management plans. Sources of
data will include but are not limited to:
     Bus patronage data
     Bus travel time information
     Pedestrian and cyclist counts
     Vehicle queue length data
     Survey (face-to-face and online)
     Stakeholder feedback.

Previous Council Consideration
Ordinary Meeting Minutes, 17 June 2021, Item 5, Page 07
That Council note the report by the Project Officer to the Services & Organisation Committee Meeting
dated 8 June 2021 regarding the evaluation of Go Noosa – Christmas 2020-21 and Easter 2021 and
note that a further report will be brought to Council on recommendations for managing peak period
traffic for Christmas 2021-22 and Easter 2022.
Ordinary Meeting Minutes, 17 September 2020, Item 8, Page 16
That Council note the report by the Project Manager Transport Innovation to the General Committee
Meeting dated 14 September 2020 and:
A.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2020/21
     Christmas holiday period from 14 December 2020 to 27 January 2021 with delegation to the
     CEO to reduce the days subject to weather and advice from the Council COVID Safe team;
B.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2021 Easter
     holiday period from 2 April 2021 to 18 April 2021 with delegation to the CEO to reduce the
     days subject to weather and advice from the Council COVID Safe team;
C.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over the 2020
     September holiday period from 19 September 2020 to 5 October 2020 with delegation to the
     CEO to reduce the days subject to weather and advice from the Council COVID Safe team;


                                                                                      Page 8 of 55

Section 9

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


D.    Write to the Department of Natural Resources, Mines and Energy and seek Ministerial
      Approval for an inconsistent secondary use of the Noosa Heads Lions Park (Lot 117 on
      SP108103) for paid car parking during school holidays and long weekends for the period of
      the public health declaration for the COVID-19 pandemic; and
E.    That an amount equivalent to 50% of Council’s share of the ‘profit’ from car parking in the
      Noosa Heads Lions Park Reserve be held ‘in reserve’ and allocated to recreational
      improvements in Lions park for residents and visitors alike, noting that the term ‘profit’ refers
      to Council’s share of the revenue less costs associated with rectifying any damage/impact from
      parking on the reserve, the hire of temporary fencing to protect children at the playground &
      BBQ area, parking signage at Lions Park, the printing of tickets and the use of traffic control to
      assist in the movement of pedestrians from Lions Park.

Finance
It is proposed that the 2021-22 Go Noosa peak period traffic management plan be funded by the
Sustainable Transport Levy and income generated from the Noosa Heads Lions Park paid parking.
The below table details all proposed initiatives and estimated costs. (Exact costs were not available
at the time of writing this report, estimates are based on quotations from previous Go Noosa
Christmas & Easter services).

Table 1: Peak Period Traffic Management Initiatives and Cost Estimates

 Initiatives        Details                                                       Xmas        Easter
                                                                                  2021-22     2022
                                                                                  Estimated   Estimated
                                                                                  Costs       Costs
 5 TransLink Bus       Route 626 – Tewantin to Sunrise Beach via Noosa Heads      $113,610      $33,125
 Services
                       Route 627 – Tewantin to Sunshine Beach via Noosa
                        Heads
                       Route 628 – Noosa Parklands to Noosa Junction, via
                        Noosa Civic
                       Route 629 – Tewantin to Noosa Junction via Noosa Civic
                       Route 632 – Noosa to Cooran via Cooroy and Pomona
 065 Go Noosa       Temporary loop Bus servicing Noosa Parade, Noosa Drive         $117,500      $34,807
 Loop Bus           and Weyba Road.
 064 Peregian       Temporary service to replace existing TransLink route 620       $72,500      $29,016
 Beach – Noosa      for Noosa Shire residents and visitors.
 Heads Bus
 Park & Ride        The Noosa AFL ground, The J carpark and the Noosa                $3,000       $1,500
                    Junction Transit Centre will be promoted as the key Park &
                    Ride locations for the free 065 Go Noosa Loop bus.
 Variable           Car parking availability and alternative transport options      $18,000      $18,000
 Message Signs      shown on digital variable message signs (VMS)

 Traffic Control    Traffic control                                                 $70,000      $38,000
 Parallel Parking   Convert 4 car parks on southern side of Hastings Street to       $1,000       $1,000
 in Hastings St     reduce congestion causing reverse parking close to
                    roundabout.
 Wayfinding         Wayfinding signage to assist residents and visitors with         $2,500       $2,500
 signage            alternative travel options and pedestrian routes within the
                    Hastings Street precinct.
 End of Trip        Provision of temporary bicycle parking, scooter parking          $5,000       $5,000
 Facilities
 Noosa Ferry        User pays. Include in marketing only.                            $1,000       $1,000

                                                                                          Page 9 of 55

Section 10

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


    Initiatives       Details                                                    Xmas          Easter
                                                                                 2021-22       2022
                                                                                 Estimated     Estimated
                                                                                 Costs         Costs
    Marketing         Promotion of Go Noosa (banners, flyers, news print etc.)     $10,000         $10,000
    Total                                                                         $414,110        $173,948
    Combined          Go Noosa Christmas 2021-22 & Easter 2022                                    $588,058
    Total
    Paid Parking      Use of Lions Park for overflow parking. Refer separate      ($93,400)      ($27,260)
    revenue –         Council report to General Committee dated 14 September
    Noosa Heads       2020.
    Lions Park
                           Lions Club (less GST)                                  $46,700         $13,630
    (Figures based
    on 2020/21
    actual revenue)        Noosa Council                                          $46,700         $13,630


Remaining Sustainable Transport Levy balance

    Sustainable Transport Levy as at 30 June 2021                                             $637,757
    Peak Period Traffic Management 2021-22 cost estimate.                                     $588,058
    Contingency 5%                                                                             $29,402
    Lions Park car park Noosa Council net revenue estimate     ($60,330)
    Net Costs                                                                                 $557,130
    Balance                                                                                    $80,627


Noting that the July rates have been levied at approximately $460,000 but are currently not included
in the above levy balance.

Risks & Opportunities
Go Noosa peak period traffic management has been operational since 2018 with improvements and
amendments made each year as required.
The key risk is the unknown situation of COVID-19 lockdowns and associated impacts on proposed
initiatives. Operational risks associated with Go Noosa can be managed through dialogue with
operators and key stakeholders.
The uncertainty of COVID-19 and the promotion of Noosa to the drive market in South-East
Queensland results in unknown traffic volumes needing to be managed.
Financial risks of not having quotations for all services are mitigated by the initiatives being
consistent with previous years spend.
Opportunities include continuing to work with key stakeholders to promote alternative transport
options to residents, workers and visitors.
Consultation
External Consultation - Community & Stakeholder
        Go Noosa feedback surveys 2020/21
        Hastings Street Association
        Tewantin Noosa Lions Club
        TransLink



                                                                                         Page 10 of 55

Section 11

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


Departments/Sections Consulted:

    Chief Executive Officer       Community Services                          Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                   X   Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                              X   Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services            Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                X   Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 11 of 55

Section 12

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


2    CHANGE IN USE & TENURE - PART OF LOT 69 RP41223 AND PART OF LOT 2 RP839623

Author            Community Development Officer, Kylie Finigan
                  Community Services Department

Index             ECM/10.02 Noosa Social Strategy

Attachments       1.   Site plans


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Development Officer to the Services & Organisation
Committee Meeting dated 07 September 2021 and:
A.   Enter into Freehold Permit (3 years) with Noosa Community Garden Inc. over part of Lot 2
     P839623 vacant open space at Wallace Park for the purpose of relocation of the Noosa
     Community Garden from Earl Street, Tewantin;
B.   Enter into Freehold Lease (3 years) with YouTurn Ltd over Lot 69 RP41223 for the purpose of
     siting two (2) prefabricated, relocatable Tiny Homes to be managed as supported short-term
     transitional accommodation for young, vulnerable people;
C.   Authorise the Chief Executive Officer to enter into tenure renewal negotiations with community
     organisations in accordance with the Community Purpose Land and Infrastructure Tenure
     Policy; and
D.   Apply the exception to the requirement for tendering under Section 236 (1) (b) (ii) of the Local
     Government Regulation 2012 for disposal of a non-current asset other than by tender or
     auction if the valuable non-current asset is disposed of to a community organisation.

REPORT
The purpose of this report is to endorse the change of use and tenure of two parcels of land to
facilitate the relocation of the Noosa Community Gardens and the establishment of YouTurn’s Tiny
Homes project for youth transitional accommodation.

1. Background
YouTurn Youth Support, formerly United Synergies and Noosa Youth Service began in 1989, have
held a long-term Freehold Lease at 12 Ernest Street, Tewantin (Lot 168 SP132627) and have
provided services to vulnerable youth for the past 32 years.
In 2012 United Synergies established a community garden within their lease boundary to support
Slow Food Noosa and community partners. United Synergies recruited from local high schools to
participate in the garden alongside other community members, United Synergies’ staff and clients.
In 2016 the community garden was relocated to the adjacent 14 Earl Street (Lot 268 SP132627) in
preparation for the relocation of Tait-Duke Community Cottage from Wallace Park. The garden
relocation was coordinated by United Synergies and undertaken by Skilling Queenslanders for Work
participants.
Tait-Duke Community Cottage was relocated to 14 Earl Street in 2016. A consortium of community
partners including United Synergies, Hutchinson Builders, Rotary Club of Noosa Heads and Skilling
Queenslanders for Work renovated the Cottage. After Tait-Duke Community Cottage was officially
opened in mid-2017, Rotary Club of Noosa Heads Inc. entered into a tenure agreement with Noosa

                                                                                      Page 12 of 55

Section 13

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


Council to operate the Cottage as a community centre and Rotary’s home-base for meetings and
activities.
In 2018 the Noosa Community Garden members became an incorporated group, expanded their
membership and activities on site and began negotiations with Council for tenure of neighbouring
Lot 69 RP41223. Tenure was granted in 2020 (3 year Freehold Permit) expiring 20 February 2023.
The Noosa Social Services Hub was established in 2018 at Tait-Duke Community Cottage providing
a fortnightly drop-in centre where those facing hardship can access medical and social support
services in the one location. Demand for the Hub services increased, with further service providers
participating in the Hub.
In 2020 United Synergies rebranded as YouTurn Youth Support and expanded their Specialist
Homelessness Services and Emergency Relief Program. In response to the COVID-19 pandemic,
Council and YouTurn partnered to upgrade laundry and shower facilities at YouTurn to meet the
growing demand of service support for people experiencing homelessness.
YouTurn, Noosa Social Services Hub and Northern Sunshine Coast Social Services Network
agencies have reported substantial increases in the demand for support services and emergency
relief by people experiencing homelessness. YouTurn alone have reported a 200% increase in the
number of emergency relief presentations.
With limited accommodation services for at-risk youth in Noosa, local organisations had been
seeking opportunities to undertake projects which fill the key gap being transitioning from emergency
accommodation to independent living. YouTurn began to explore the feasibility of Tiny Homes for
short-term, transitional housing to young families requiring homelessness support to transition to
independent living.
YouTurn launched their “Big Hearts for Tiny Homes” fundraising campaign in 2020 and approached
Council to assist in identifying potential sites for a Tiny Homes project in Noosa Shire.
Since early 2021, Noosa Community Garden Executive Committee and individual members have
consistently approached Council expressing their concern about the increasing number and
activities of people who are experiencing homelessness in the Earl Street precinct. In a written
request for assistance, Noosa Community Garden President stated that members felt unsafe while
undertaking their gardening activities and that this incompatibility of use in the precinct had resulted
in a loss of membership, financial capacity and was impacting the health and wellbeing of members.
Council officers have been in consultation with the Noosa Community Garden Executive to develop
options which will resolve the concerns of their members.
2. Summary of the Proposal
YouTurn have made a formal request to Council to consider Earl Street as a suitable location for two
(2) tiny homes to provide supported short-term housing for vulnerable young people transitioning
from emergency accommodation to independent living.
In response to the approaches to Council by Noosa Community Garden and YouTurn, Council has
considered:
     Noosa Community Garden members’ ability to undertake their gardening activities with a
      feeling of safety and to continue operating with financial stability;
     The projected increase in demand for support from people experiencing homelessness across
      the Shire;
     Vulnerable people's challenges in accessing housing and support services in an appropriate
      environment, and
     Identified need for transitional housing for young people in Noosa Shire.
i)    Noosa Community Garden relocation
Following the review of the concerns of the community garden members, a relocation of the Noosa
Community Garden was recommended and Wallace Park identified as a viable site for relocation.


                                                                                        Page 13 of 55

Section 14

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


Lot 69 RP41223 consists of a number of community facilities including Noosaville Library, Noosa
Leisure Centre and Noosa Community Support Centre.
The relocation of the Noosa Community Garden to Wallace Park provides an opportunity for
collaboration with complimentary community organisations, increased visibility, membership growth
and community profile.
The proposed Part of the vacant land for use as the Noosa Community Garden is located adjacent
to Noosaville Library, at the rear of Noosa Community Support Centre. There is currently no planned
use on this Part of Lot 69 RP41223.
Consultation and subsequent site visit resulted in Noosa Community Garden formally accepting an
offer by Council for a supported relocation to Part of Lot 2 RP839623, Wallace Park Noosaville, with
a resolution being made at their Annual General Meeting on 25 August 2021.
Council officers consider this a highly positive outcome to the ongoing concerns of community
garden members.
ii)   YouTurn Tiny Homes Project
Council officers have worked with YouTurn and internal stakeholders to further understand and fully
consider the feasibility of YouTurn’s request for the Tiny Homes project. The location is considered
highly advantageous given the proximity to YouTurn’s service centre and Noosa’s Social Services
Hub allowing ongoing support as needed, shared utilities and resources with YouTurn, the quiet cul
de sac position within a community precinct and good access to employment, education and public
transport. The project will act as a pilot for potentially further housing projects for YouTurn or other
community housing providers.
The proposal offers a unique opportunity to showcase an innovative Community and Council
collaborative response to an identified need for transitional housing for young people in our
community.
The relocation of the Noosa Community Garden from Earl Street Tewantin allows for better
placement of the tiny homes and reduces probable conflict between user types.
3. Strategic alignment
Council officers consider that both of these proposals strongly align with key Council and other
relevant strategies.
The proposed new purpose and tenure of Part of Lot 2 RP839623 Wallace Park Noosaville aligns
with Noosa Social Strategy key initiatives:
     Improve and advocate for inclusive access to public spaces, places and services, and
     Assist community groups and sporting organisations to maintain their assets.
The proposed changes to purpose and tenure of Lot 69 RP41223, Earl Street Tewantin align with
Noosa Social Strategy key initiative:
    Work with government agencies, not-for-profit organisations and business sector to explore
     innovative ways of tackling housing affordability.
Youth are a priority cohort under the National Housing and Homelessness Agreement (NAHA; 2018),
which is carried over into Queensland State Government strategy: “Homelessness to Housing
Strategy 2020” calling for enhanced service models and significant support from the broader
community.
4. Planning requirements
i)     Part of Lot 2 RP839623
The proposed Noosa Community Garden relocation site is a section of vacant land at Wallace Park
zoned Community Facilities for Community Use. The use is consistent with a community garden.
ii)    Lot 69 RP41223


                                                                                        Page 14 of 55

Section 15

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


The proposed site of the Tiny Homes is zoned Recreation Open Space.
Relocatable homes is not a consistent use although Planning Regulations 2017, Schedule 6, Part 2,
s2(1) planning schemes are prohibited from making the following assessable development: A
material change of use of premises for a class 1 or 2 building, if the use is providing support services
and temporary accommodation for persons escaping domestic violence.
This proposed project qualifies for an exemption under Regulations 2017, Schedule 6, Part 2, s2(1).
iii)   Flooding
Lot 69 RP41223 is located in an active water flow area. Whilst flood levels have not been recorded
for this land parcel, a Flood Information Certificate has indicated applicable minimum floor level for
habitable room/area which can be achieved through the tiny home design.
As the tiny homes are relocatable and have easy road access for evacuation if required, this has
been considered in YouTurn’s risk management plans and Council officers consider these plans to
be a satisfactory mitigation plan.
5. Tenure
Council Officers have recommended the following tenure arrangements:
Freehold Permit (3 years) to Noosa Community Garden Inc. over part of Lot 2 RP839623 at Wallace
Park for the purpose of relocation of the Noosa Community Garden and;
Freehold Lease (3 years) to YouTurn Ltd over Lot 69 RP41223 for the purpose of siting two (2)
prefabricated, relocatable tiny homes.
In accordance with the Local Government Regulation 2012 section 236, Council may enter into a
contract to dispose of an interest in a non-valuable asset including the granting of a lease over land
or a building without completing the tender process section 228 prescribes, if a relevant exception
applies.
Accordingly, the relevant exception is referenced in Section 236 (1) (b) (ii) whereby Council is not
required to tender of these properties as the purpose of the tenure renewals are to community
organisations. The requirement of this exception is that a relevant Council resolution is first obtained.
Previous Council Consideration
Nil.
Finance
i.   Relocation of Noosa Community Garden
Council will seek external funding and labour support for the relocation of Noosa Community Garden
from Earl Street to Wallace Park. Estimates are being prepared, although costs are not expected to
exceed $20,000. Council will provide in-kind labour support and the offer of surplus materials
however a direct cash contribution will not be required.
Tenure responsibilities will be in accordance with Freehold Permit. Future stages of the Noosa
Community Garden development will be eligible for funding in the Noosa Council Community &
Environment Grants Program and other funding programs e.g. Gambling Community Benefit Fund.
Noosa Community Garden is eligible for Council’s Community Grant Program - Water Rebates.
ii.    You Turn - Tiny Homes
Funding has been secured for two (2) tiny homes and associated ancillary costs through YouTurn’s
sponsorship and a major fundraising campaign “Big Hearts for Tiny Homes” launched in 2020.
YouTurn will be responsible for all maintenance and operational costs of the tiny homes and have
built in an affordable rental fee under a resident tenancy agreement which will contribute to
maintenance and improvements. YouTurn are eligible for Council’s Community Grant Program -
Water Rebates and are recipients of Council’s Three-Year Community Alliance Agreement.



                                                                                         Page 15 of 55

Section 16

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                7 SEPTEMBER 2021


Project Management and delivery will be the responsibility of YouTurn with Community Development
Officer as Council Liaison.
There is no expectation of financial contribution from Council for the Tiny Homes project.
Human Rights
The needs of all involved stakeholders have been considered in accordance with the requirements
of the Queensland Human Rights Act 2019. The proposed changes are seen as a positive outcome
for the priority user groups – vulnerable young people and community garden members.
Opportunities & Risks
A detailed Risk and Opportunity Assessment was undertaken in preparation of this report.
Meeting the needs of both community organisations and their members and clients supports the
creation of places and spaces that foster safety, cohesion, wellbeing and sustainable living for
everyone, including advocacy for marginalised persons with higher needs.
The relocation of the Noosa Community Garden enables the growth of the ecosystem in a
complimentary community precinct. Tiny homes for youth transitional housing contributes directly to
Council’s response to the housing crisis.
Should Council not support the relocation of Noosa Community Garden to Wallace Park, there is a
risk that the conflict between Noosa Community Garden member’s ability to undertake gardening
activities safely and vulnerable persons’ ability to access housing and support services in an
appropriate environment will be significantly escalated. This will require ongoing input from Council
officers to manage and is likely to see the demise of the community garden.
Risks associated with the garden relocation include:
     External funding and support is not secured by Council to undertake the relocation as per
      agreement with Noosa Community Gardens. This risk is mitigated by Community Development
      Officers’ extensive network of agencies providing financial and in-kind support in place,
      including Noosa Community Training Centre.
     Materials and labour cost escalation; mitigated through minimising time delays between quotes
      and engagement of contractors. 10% contingency will also be included in the project budget.
     Time delays due to wet weather: A two week allowance for inclement weather delays is
      factored into the project delivery plan. Noosa Community Gardens working group will take
      responsibility for the removal, care and replanting of plants to be relocated.
There is a risk if Council approves the new land use and YouTurn cannot meet terms pursuant to
the Freehold Lease, the project could fail resulting in reputational impact to Council. As YouTurn is
a financially sound organisation with 30 years proven experience, has established support programs,
property management and risk management frameworks in place, these risks are considered to be
a low likelihood.
If Council does not support the project, it misses an opportunity to facilitate an innovative housing
pilot project which could improve the pathway for people with housing insecurity. This could result in
poorer outcomes for vulnerable young people, health and safety impacts in the community, potential
reputational/public trust impacts and economic impacts.
Consultation
Consultation has been undertaken with neighbouring businesses and residents in Hilton Terrace in
regards to the Earl Street Tiny Homes project with mainly positive feedback. The only issue of note
raised was concern over the potential impact on existing parking demand. YouTurn states that
potential tenants are likely to rely on public transport, and should a tenant have a vehicle, a parking
space will be allocated in YouTurn’s onsite car park.
Some stakeholders have raised concerns regarding the potential for more than two homes to be
located on the site and creating the perception of a relocatable home village. Council officers have

                                                                                       Page 16 of 55

Section 17

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         7 SEPTEMBER 2021


been clear that two homes are considered a reasonable number for the site.
Additional parking demand with the relocation of the Noosa Community Garden to Wallace Park
precinct was considered in the identification of a suitable site. Existing precinct parking, including
overflow parking off Wallace Drive will be monitored.
Consultation with community facilities and organisations in Wallace Park Precinct has been
undertaken with an overwhelmingly positive response.
All stakeholder concerns and questions have been addressed and both projects have obtained
strong support.
External Consultation
        YouTurn Youth Support Inc.
        Noosa Community Garden Inc.
        Rotary Club of Noosa Heads Inc.
        Northern Sunshine Coast Social Services Network – 28 agencies
        Noosa Community Training Centre Inc.
        Oz Harvest Inc.
        Neighbouring businesses – Hilton Terrace and neighbouring residence – Ernest Street
        Wallace Park Precinct facility managers and community organisations

Internal Consultation
        CEO                                                         Environment & Sustainable
        Community Services Director                                  Development Director
        Community Development                                       Building & Plumbing Services
        Community Facilities                                        Development Assessment
        Libraries & Galleries                                       Environmental Services
        Corporate Services Director                                 Strategic Land Use Planning
        Property                                                    Infrastructure Services Director
        Executive Services Director                                 Building & Facilities
        Community Engagement                                        Civil Operations
        Governance                                                  Infrastructure Planning, Design &
                                                                      Delivery

    Departments/Sections Consulted:

     x   Chief Executive Officer   x   Community Services                          x   Corporate Services
         Executive Support             Director                                        Director
                                       Community Development                           Financial Services
                                       Community Facilities                            Fleet
                                       Libraries & Galleries                           ICT
                                       Local Laws                                      Procurement
                                       Waste & Environmental Health                    Property
                                                                                       Revenue Services

     x   Executive Services        x   Environment & Sustainable Development       x   Infrastructure Services
         Director                      Director                                        Director
         Community Engagement          Building & Plumbing Services                    Asset Management
         Customer Service              Development Assessment                          Buildings and Facilities
         Governance                    Economic Development                            Civil Operations
         People and Culture            Environmental Services                          Disaster Management
                                       Strategic Land Use Planning                     Infrastructure Planning,
                                                                                       Design and Delivery




                                                                                                  Page 17 of 55

Section 18

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   7 SEPTEMBER 2021




                                                        Page 18 of 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                        7 SEPTEMBER 2021

 ATTACHMENT 1

                          Ps             ys       NS / -
                                        ,
                                              ~~                      id
                                     -    4 Ps                             ri
                                    i           t                   ree! 26  am
                         “        |    2
                                   re        i
                                                  Ye |
                                               peta lot
                                    hee Tt                     oe           ap

                                        PM               Tt
                        Placement of Tiny Homes on Lot 69 RP41223, Earl Street,
                                 Tewantin. For indicative purposes only.

                                           Pee          a =                  y

                             .             f      4                         ’
                                               '  A pe ,      P
                                                 fay                         |
                                                 a ihe
                                 Drive     ;  —                              ;
                        Sater                                mas           J
                             ¢     5                 De: 8
                         oe ; A,             oid                            2
                           ae                 ‘                      Jaz:
                         pe                                      Pay
                             '                /                         £
                        rr      SN       ei                            by
                        yr              ;                            7
                                s       ’         = | . : —y       ¥
                           PN                          a    ae
                             >         ’        Pm                 a A _ - =
                Proposed location of Noosa Community Garden on Part of Lot 2 RP839623
                          Wallace Park, Noosaville. For indicative purposes only.

                                                                               Page 18 of 55

Section 19

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


3     PROPOSED NEW LEASE – SHOP 8 SUNRISE NEIGHBOURHOOD SHOPPING CENTRE

Author            Property Advisor – Commercial Property, Robyn Mercer
                  Corporate Services Department

Index             ECM/Subject: 46.01 Leases

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Property Advisor – Commercial Property to the Services &
Organisation Committee Meeting dated 7 September 2021 regarding the lease of Shop 8, Sunrise
Neighbourhood Shopping Centre and:
A.    Agree to enter a commercial lease of the premises to Tro Management Australia Pty Ltd, for
      a ten (10) year term, as generally outlined in the report;
B.    Agree to an initial rent-free period of 12 months;
C.    Authorise the CEO to award up to 5 subsequent lease extensions each of 3 years, subject
      to the lessee complying with the terms of the lease, and
D.    Note that capital investment of up to $700,000 will be required to be considered in budget
      review 2 or 3 to fund the expansion works required once a lease is finalised.

REPORT
The purpose of this report is to seek Council approval to enter into a new lease for Shop 8 - Sunrise
Neighbourhood Shopping Centre. Council owns the Centre and Shop 8 is the largest tenancy in
the Centre comprising 305m2. It has traditionally been leased as a convenience store/grocer and
is the key anchor tenancy at the Centre. In recent years the shop has been vacant which has
affected the performance of the Centre.

At Council’s April Ordinary Meeting, Council agreed to enter into a commercial lease of the
premises with Tanglewood Company Pty Ltd. Subsequently, Tanglewood provided notice that it
did seek to continue lease negotiations for Shop 8.

Colliers International (Council’s managing agent for the Centre) have continued to actively seek a
new tenant for the vacant shop and have received an offer to lease from Tro Management Australia
Pty Ltd for an IGA supermarket. The lessor’s proposed operation will require expansion of Shop 8
to approximately 500m2.

In accordance with their role as managing agent, Colliers has undertaken an assessment of the
lease proposal and supporting information as per the Tenant Assessment Criteria noted in
Attachment 1. The proposal scored highly against the criteria and Colliers notes in their opinion
‘…an IGA is an excellent fit for the Sunrise Beach Shops’.

The agreed rent achieves a fair market value in line with an independent market valuation. The
primary lease provisions proposed are as follows:



                                                                                     Page 19 of 55

Section 20

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                7 SEPTEMBER 2021


 Lease Provision                 Proposal
 Lessee Name:                    Tro Management Australia Pty Ltd
 Premises:                       Part of Lot 8 RP901384
 Annual Rent:                    $130,000 plus GST
 Nett Lettable Area:             Approximately 500m2
 Indicative Commencement Date:   1 October 2022
 Rent Free Period:               12 months
 Initial Lease Terms:            10 years
 Options to Extend:              5 x 3 years
 Market Rent Reviews:            At the commencement of each option.
 Outgoings:                      Lessee is responsible for their proportionate share of outgoings for the
                                 centre.
 Permitted Use:                  Supermarket
Previous Council Consideration
Ordinary Meeting, 15 April 2021, Item 3, Page 8
That Council note the report by the Property Advisor – Commercial Property to the General
Committee Meeting dated 12 April 2021 regarding the lease of Shop 8, Sunrise Neighbourhood
Shopping Centre and:
A. Agree to enter a commercial lease of the premises to Tanglewood Company Pty Ltd, for a five
   (5) year term, as generally outlined in the report;
B. Agree to an initial rent-free period of 6 months; and
C. Authorise the CEO to award up to 4 subsequent lease extensions each of 5 years, subject to
   the lessee complying with the terms of the lease.
Finance
The annual financial return posed by the new lease commencing in October 2022 is as detailed
above. The lease will however require the expansion of the Shop 8 footprint from 305m 2 to
approximately 500m2, with Council proposed to fund the expansion works at an estimated cost of
between $650,000 and $700,000. Should Council endorse the recommendations in this report the
cost of the works will need to be considered for inclusion in budget review 2 or 3.
Comprehensive financial viability analysis has been undertaken to determine the value of Council’s
investment into expanding Shop 8. The analysis has been reviewed by the Director Corporate
Services and demonstrates positive returns for Council, with a positive net present value within 10
years and a payback period on investment of 6 years for ratepayers (applying a discount rate of
7.5%).
Tro Management Australia Pty Ltd will undertake substantial fit out works to the premises. The
proposed twelve (12) month rent free period is intended to help offset the lessee’s establishment
costs, with lease revenue to be recognised in the 2023/24 budget (i.e. from October 2023).
Risks & Opportunities
Risks
The proposed lease poses minimal risk because it seeks to re-establish an anchor commercial
tenant in the centre.
Opportunities
The lessee’s proposal demonstrates a commitment to the Centre and identifies new business and
employment opportunities. The new lease proposal will help activate the Centre and meet the
needs of the community.




                                                                                        Page 20 of 55

Section 21

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                7 SEPTEMBER 2021


Consultation
External Consultation - Community & Stakeholder
Colliers International Sunshine Coast
Savills Valuations Pty Ltd

Internal Consultation
   Director Corporate Services
   Property Manager
   Finance Manager

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      x   Corporate Services
    Executive Officer             Director                                x   Director
    Executive Support             Community Development                   x   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                              x   Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 21 of 55

Section 22

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   7 SEPTEMBER 2021



                                                        Attachment 1




                                                        Page 22 of 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                7 SEPTEMBER 2021

                                                                                                         Attachment 1

                     Level 5, 57 The Esplanade PO Box 796            MAIN +61 7 5478 3788              Colliers
                     Cotton Tree QLD 4558    Cotton Tree QLD 4558    FAX  +61 7 5443 5982
                                             www.colliers.com.au     MOB  +61 468 495 640
                                                                     EMAIL [email protected]

                     12 August 2021

                     Robyn Mercer
                     Noosa Council (Commercial Property)
                     PO Box 141
                    TEWANTIN QLD 4565

                     Dear Robyn
                     Re:    Application of Tro Management Australia Pty Ltd (Todd O'Reilly trading as IGA)
                    Thank you for the privilege of allowing us to assist with your tenant search for the 2 Grasstree
                     Court (Sunrise Beach Shops). It is the view of Colliers Sunshine Coast that the successful placement
                    of IGA operated by Todd O'Reilly will be a key milestone in Noosa Council's strategic objective of
                     re-activating the complex. This letter outlines the process that was followed to procure O'Reilly
                     IGA in addition to our assessment of O'Reilly IGA as a potential tenant for the complex.

                     Procurement Process
                     Colliers International (Sunshine Coast) followed the procurement processes required of Council, in
                    addition to generally accepted methods of advertising online and approaching potentially suitable
                    tenants within our own database. The below table outlines the timeframes surrounding the tenant
                     procurement.

                     Procurement Timeline
                    Pre November 2019           Property had been advertised with other commercial leasing agents.
                    15 November 2019 to         Publicly advertised online via major commercial real estate websites:
                    current                     e  Realcommercial.com.au
                                                e  Commercialrealestate.com.au
                                                e  Colliers.com.au
                    10 December 2019            Publicly Advertised in Noosa News (1/4 page advert.). See Annexure A.
                    2 December 2019 to          Discussions with several potential users over the leasing period
                    26 February 2021
                    26 February 2021 to April   Agreed terms with Tanglewood and presented proposal for Council's
                    2021                        consideration. Council agreed to support the proposal.
                    April 2021 to June 2021     Tanglewood changed their position and terms.
                    June 2021 to July 2021      e  Tanglewood advised they were no longer interested in the
                                                   opportunity.
                                                e   Received offers from Metcash on behalf of a Sunshine Coast based
                                                    IGA operator and Todd O'Reilly another Sunshine Coast based IGA
                                                   operator.

                                                                                                  Accelerating success. —————
            Colliers International (Sunshine Coast) Pty Ltd | ABN 73 599 247 155

                                                                                                         Page 22 of 55

Section 23

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   7 SEPTEMBER 2021




                                                        Page 23 of 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             7 SEPTEMBER 2021

                                                                                                       Colliers

                                               Negotiated further with Todd O'Reilly and agreed on principal terms.
                    July 2021 to August 2021   Multiple follow ups made with Metcash with no return correspondence
                                               - assumed no further interest.

                    9 August 2020              Submitted application for Todd O'Reilly (IGA).

                    Tenant Overview: Tro Management Australia Pty Ltd (Todd O'Reilly trading as IGA)
                    IGA is an Australian chain of supermarkets owned by Metcash with individual stores independently
                    owned. Todd O'Reilly has extensive experience owning and operating IGA supermarkets on the
                    Sunshine Coast with stores in Little Mountain, Mooloolaba and Chancellor Park.

                    Tenant Assessment Criteria
                    Commercial Terms               19/20     The commercial lease terms offered by Todd O'Reilly
                                                             are reflective of the asking terms. The “rent free
                                                             incentive” is  below   market   in  a  post   covid
                                                             environment.
                     Business Track Record         19/20     Todd and his family have successfully run multiple IGA
                                                             stores across the Sunshine Coast. Todd has an
                                                             accounting background which has helped him achieve
                                                             a strong trade across his stores.
                    Capability and Resources       18/20     Based on an asset and liability statement provided and
                                                             a recommendation from Thomas Brown (previously
                                                             the business development manager at Metcash), we
                                                             are confident that Todd will be able to meet the
                                                             financial obligations of the lease.
                    Suitability & Compatibility    17/20     IGA Sunrise Beach will be backed by a _ national
                                                             company and run by a local resident on the Sunshine
                                                             Coast. IGA will support local suppliers, brands and
                                                             other businesses. IGA Sunrise Beach is set to attract
                                                             large volumes of patrons to the complex and fill a gap
                                                             in the market.
                    Contribution to Local          20/20     In addition to working with other local business, IGA
                     Economy                                 Sunrise Beach will be providing the surrounding
                                                             catchment areas with the opportunity to shop for
                                                             fresh produce as well as activating Sunrise Beach
                                                             Shops, strengthening the trade for existing businesses
                                                             in the complex.
                    Total Assessment               93/100    It is the opinion of Colliers that Todd O'Reilly (IGA) is an
                                                             excellent fit for the Sunrise Beach Shops.

                                                                                                Accelerating success. —————
                                                                 2

                                                                                                     Page 23 of 55

Section 24

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   7 SEPTEMBER 2021




                                                        Page 24 of 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           7 SEPTEMBER 2021

                                                                                                     Ory liTSas

                    Conclusion
                    We again thank you for the opportunity to work alongside Noosa Council to find a suitable tenant
                    for the Sunrise Shops. Having followed the Council's due process and having assessed the potential
                    tenant against the Council's criteria, we strongly support the application of Todd O'Reilly (IGA) and
                    can be called upon anytime to provide further feedback.

                    Yours sincerely
                    Colliers

                       BZ
                    Jesse Howitt
                    Executive - Commercial Sales & Leasing
                    Mobile: 0468 495 640

                                                                                               Accelerating success. —————
                                                                3

                                                                                                    Page 24 of 55

Section 25

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   7 SEPTEMBER 2021




                                                        Page 25 of 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         7 SEPTEMBER 2021

                                                                                                   Colliers

                   Annexure A -

                    Newspaper advertisement image:

                                     Accelerating success.                              OTS
                                     Reach more people - better results faster

                              COMMERCIAL TENANCIES FOR LEASE
                              FOR LEASE

                             cla meta
                                                                       SHOP 8/2 GRASSTREE COURT,
                                                 a                     SUNRISE BEACH
                               een                  7
                             >                       e re    AS
                               —                    Tce                           Lf
                               a                    wri        ;           2
                                 ae                   So ER         5
                                 io Oe of            Cas  Fe’            300 -  Anchor      Busy
                                  :   ‘=              Wa    ‘           1,000m?  tenant  neighbourhood
                             E      a :               ps  es N  7                sought    centre
                              yas edd we                         -
                             Toad FA             YS,                   PEREGIAN BEACH DIGITAL HUB
                             8           __ Bee                        253 DAVID LOW WAY,
                             a            Ng                           PEREGIAN BEACH
                                         ei  ] MN
                                 u           Nh                    Lm             gQ
                                         “           — |        :  p     45m?    Close to — Join vibrant
                                                         :      :                beach     digital
                                           Cotore | J yi  a3                             community

                                                                       COOROY DATA CENTRE
                                                                       11A MAPLE STREET,
                                                                       COOROY
                                                                         m        $
                                                                         97m?   $36,375 pa Purpose
                               ita                                               excl GST built deta
                                                        _                                 centre
                                           a

                              Jesse Howitt 0468 495 640
                                                                                       colliers.com.au

                                                                                             Accelerating success. —————
                                                              4

                                                                                                  Page 25 of 55

Section 26

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


6     REPORTS FOR NOTING BY THE COMMITTEE

4     NOOSA AQUATIC CENTRE (NAC) – FULL YEAR REPORT TO 30 JUNE 2021

Author            Noosa Aquatic Centre Coordinator, Stephen James
                  Community Services Department

Index             ECM/ Subject/ 72.02 Noosa Aquatic Centre

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Noosa Aquatic Centre Coordinator to the Services &
Organisation Committee meeting dated 7 September 2021, providing an end of year update on the
activities of the Noosa Aquatic Centre for the 2020/21 financial year.


REPORT

The purpose of this report is to advise Councillors of the Noosa Aquatic Centre’s (NAC) activities
for the financial year ending 30 June 2021.

The NAC comprises a 50m Olympic-sized pool, 25m pool, leisure pool, fitness studio, change
rooms and associated amenities. The NAC also oversees the maintenance of the Sunshine Beach
Skate Park.

The NAC provides a broad range of aquatic and leisure programs including recreational swimming,
learn to swim (LTS) programs, elite squad training, aqua aerobics and water polo, as well as circuit
classes and general gym usage in the fitness studio.

1.    FINANCIAL PERFORMANCE

The objective of all services within the Community Facilities branch is to balance the demands of
access, equity and community service obligations with sound financial management and to
improve revenue through innovative and entrepreneurial approaches, whilst minimising operational
costs.

It is important to note that Covid-19, its associated operating restrictions and the general
uncertainty around how facilities would be able to operate throughout the year had a significant
impact on the reported financial performance of all of Council’s community facilities in 2020/21. A
large component of this impact related to the difficulty of setting accurate budgets prior to the
commencement of the year, given the high level of operating uncertainty at the time. Despite
making some budget adjustments following completion of the third quarter there was ultimately still
a level of variability between budgeted and actual financial performance. Given this situation it may
be more meaningful to gauge the year’s performance by comparing to previous years’ results than
against budget.




                                                                                     Page 26 of 55

Section 27

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    7 SEPTEMBER 2021


NAC interim financial performance as at end of financial year 30 June 2021.

 Statement of Income and Expenses          2020-21         2020-21        2020-21         %
                                           Original         YTD             YTD         Current         YTD
                                           Budget          Budget         Actuals       Budget        Variance

 Total Revenue                                929,614      1,559,614      1,826,947       117.1%         267,333
 Total Expenditure                          2,590,457      2,775,757      2,918,645       105.1%       (142,888)
 Net Result - Surplus/(Deficit)           (1,660,843)     (1,216,143)    (1,091,698)                     124,445


 Total Revenue                                929,614      1,559,614      1,826,947       117.1%         267,333
 Direct Costs (Controllable)
   Employee Benefits                        1,112,265      1,222,265      1,325,374       108.4%       (103,108)
   Finance Costs                                      0              0              8     100.0%                (8)
   Materials & Services                       609,444        684,744        731,498       106.8%        (46,755)
   Other Expenses                               1,087          1,087          1,103       101.5%               (17)
 Subtotal Direct Costs (Controllable)       1,722,796      1,908,096      2,057,984       107.9%       (149,888)
 Operating Surplus/Deficit                  (793,181)      (348,481)      (231,036)                      417,221
 Indirect Costs (Corporate)
   Depreciation & Amortization                239,018        239,018        239,018       100.0%                 0
   Internal Charges                           628,644        628,644        621,644         98.9%             7,000
 Subtotal Indirect Costs (Corporate)          867,662        867,662        860,662         99.2%             7,000
 Net Result - Surplus/(Deficit)           (1,660,843)     (1,216,143)    (1,091,698)                     124,445
*Please note figures are interim financial results only as final figures were not available at the time
of compiling this report.


                                  Noosa Aquatic Centre
 3,500,000
 3,000,000
 2,500,000
 2,000,000
 1,500,000
 1,000,000
   500,000
          0
                      Total Revenue              Total Expenditure           Net Result - Surplus/(Deficit)
  (500,000)
(1,000,000)
(1,500,000)


                                            2020-21           2020-21
                                            YTD               YTD
                                            Budget            Actuals




                                                                                           Page 27 of 55

Section 28

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


End of year performance against budget shows revenue up 17%, while expenditure was over
budget by 5%. Overall, the centre finished $124k ahead of the net budgeted position, a strong
result given the impact and uncertainties of Covid-19.
The NAC was quite fortunate to not suffer significantly from Covid-related patron density limits
throughout the year thanks largely to the outdoor nature of the facility. That said, there were brief
periods of low visitation numbers due to shutdowns or restrictions on people being able to visit if
they’d recently been in hot spots.
All revenue streams performed strongly against budget, particularly learn to swim revenue,
however, a comparison to previous years’ performance paints a more meaningful picture. In this
regard, revenue performance was broadly in line with a three-year average across 2016/17 to
2018/19. Total revenue was just 1% below the average and while there were other small variances,
most weren’t of material concern.
Lease revenue (café) was down 57% against the average as rent-free periods were granted to
help the lessee continue to operate during our quietest periods early in the year. Admission fees
were also down but most of this related to a shift in business models where the NAC now collects
junior squad revenue directly (via the squad revenue budget line) but does not separately levy a
casual entry charge for participants, as used to be the case. Admission fees revenue has also
been impacted as more people access the centre via memberships, with this revenue instead
showing up in group fitness, squad and gym revenue.
Expenditure finished the year approximately $143k over budget which was more indicative of
inaccurate budgets rather than true overspends. When comparing results to the previously
referenced three-year average there were few material variances to report. Employee costs were
up 12% on the three-year average however this is unsurprising given the compounding effect of
pay rises over time and the additional labour required this year to administer and enforce Covid-
19 restrictions and cleaning requirements.
The snapshot of historical performance below shows that the net operating result for the NAC has
worsened a little over recent years. This is no big surprise given the disruption of Covid-19 and
increased competition in this time (St Andrew’s pool), however the team will continue to work hard
to minimise the operational cost of the facility over coming years. While revenue growth appears
to have plateaued, operational expenses (largely labour) have continued to increase and this is
the main cause of financial performance deteriorating somewhat.




                                                                                     Page 28 of 55

Section 29

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                             7 SEPTEMBER 2021


NAC historical financial performance – 2016/17 to 2020/21

                                         2016/17     2017/18      2018/19     2019/20     2020/21
Revenue                                  actuals     actuals      actuals     actuals     actuals
40023 - Miscellaneous Fees & Charges      14,038      13,139       11,194           0           0
40029 - Rent Revenue                      13,500      13,025       13,325      13,438      13,658
40034 - Lease Revenue                     61,141      65,184       53,778      30,179      25,497
41153 - Admission Fees                   494,139     513,250      482,124     314,052     430,194
42020 - Other - Sales - Retail           180,613     174,294      166,958     117,582     201,072
42072 - Learn to Swim Revenue            689,854     703,645      654,846     397,857     654,694
42073 - Squad Revenue                     97,859     111,889      126,583      72,593     184,156
42074 - Group Fitness Revenue            138,818     154,386      154,228     104,871     160,451
42075 - Gym Revenue                      106,612     147,772      155,362      98,643     150,258
42076 - Creche Revenue                     9,508       8,969        7,603       5,474       6,968
                                       1,806,082   1,905,552    1,826,002   1,154,689   1,826,947


Controllable expenses
6EX01 - Employee Benefits              1,157,384   1,181,757    1,214,416   1,046,812   1,325,374
6EX02 - Finance Costs                          0       (268)        (118)      10,645           8
6EX03 - Materials & Services             793,850     701,009      738,792     562,948     731,498
6EX06 - Other Expenses                       990       1,024        1,060       1,084       1,103
                                       1,952,224   1,883,522    1,954,151   1,621,488   2,057,984

Net operating result                   (146,143)      22,030    (128,149)   (466,800)    (231,036)


Uncontrollable expenses
6EX04 - Depreciation & Amortization     192,724      228,237     231,689      236,922     239,018
6EX12 - Internal Charges                448,309      646,462     584,076      640,418     621,644
                                        641,033      874,698     815,765      877,340     860,662

Total operating result                 (787,176)   (852,669)    (943,914) (1,344,140) (1,091,698)


2.   CUSTOMERS
The NAC recorded 232,074 attendances for the year which was a 45% increase on the previous
year’s Covid-affected figure of 159,721. Pleasingly this result was just 3.6% less than the centre’s
last full year of operation in 2018/19. This demonstrates that patrons are largely keen to maintain
their lifestyle and fitness regimes despite recurring operating disruptions.
Traditionally the NAC has had limited lane availability during peak times, although this wasn’t as
big an issue this year due to the Covid-19 restrictions and disruptions. Demand for space will
continue to be managed carefully as the centre returns to more typical utilisation levels. The St
Andrew’s pool continues to alleviate some pressure on space as select activities, including some
water polo sessions, shift away from the NAC.




                                                                                     Page 29 of 55

Section 30

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                   7 SEPTEMBER 2021



                                 NAC annual attendance comparison
 300,000


                                 245,308            242,922             240,893
 250,000          235,037                                                                                232,074


 200,000

                                                                                           159,721
 150,000



 100,000



     50,000



             0
                  2015/16        2016/17            2017/18             2018/19            2019/20       2020/21




                                 NAC annual cost per visit comparison
     $9.00                                                                                 $8.42

     $8.00

     $7.00

     $6.00

     $5.00                                                                                                     $4.70
                                                                  $3.92
     $4.00                                  $3.51
                         $3.18
                                                                                   $2.92
     $3.00

     $2.00
                                                                                                       $1.00
     $1.00       $0.57                                    $0.53
                                   -$0.09
     $0.00
                  2016/17            2017/18                  2018/19                2019/20            2020/21
 -$1.00

                                      Operating cost per visit      Total cost per visit


Tracking the cost per visit, both for operational cost (exclusive of depreciation and internal charges)
and total cost, can be an effective way to gauge efficiency of service delivery over time. The above
chart clearly shows the impact of reduced attendance on this metric over the past two Covid-
affected years.

3.       STAFFING
The NAC remains a seasonal operation and therefore a large percentage of its team are employed
as casuals, with staff levels fluctuating throughout the year.

                                                                                                        Page 30 of 55

Section 31

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                               7 SEPTEMBER 2021


Staff have worked well together throughout the year, ensuring Covid-19 systems and requirements
are upheld and have liaised closely with patrons and clients on the implications of the various
restrictions and lockdowns. Staff have been particularly grateful for the support Council has shown
them via the provision of pandemic leave and redeployment opportunities throughout Covid
shutdowns.
There are no further staffing issues of significance to report.

4.    SYSTEMS, PROCESSES AND OTHER MATTERS
     The NAC’s current software system has some limitations and we are investigating a more
      contemporary system that will allow for enhanced communication, flexibility and patron
      interface. We anticipate shifting at some point in 2022.
     The original main switchboard that was installed in 1999 has reached the end of its useful
      life and will be replaced with a modern equivalent in September. This will result in a multi-
      day shutdown in order to allow for the safe disconnection of the current switchboard and
      installation of the new one.
     The lease for the onsite café was tendered and awarded in 2021. The café operator is doing
      a great job and the high quality of their offering is appreciated by patrons.
     The NAC continues to trial in-house coordination of the junior squad program following the
      voluntary departure of the previous contract holders in 2020. The program is performing well
      so far but management are yet to determine the best long-term operating model.
     A series of promotional videos were filmed, highlighting the variety of services the NAC
      provides to the community. The videos will be uploaded on the website and used for social
      media campaigns in the near future.

5.    FUTURE DIRECTION
Similar to last year, the focus of the new financial year will continue to be on safely operating in
line with the various Covid-19 requirements and restrictions. While the team would love to see
utilisation levels grow to new highs, this must be done in a way that ensures staff and patron safety.
Given the program’s size and significance, the NAC has completed preliminary works to aid the
development of a strategy to guide the learn to swim program over the coming years. The program
has consistently performed to a high standard and is well regarded in the industry, however, the
team are keen to determine ways to stay ahead of the curve and ensure it remains a highly
successful program.
In addition, the NAC is to undertake a master planning process to ensure we continue to search
for ways to be even better and to provide the community with a facility that continues to adapt to
meet the changing ways in which our community recreates. While it was hoped that this piece of
work would have been completed by now, internal resourcing limitations have prevented that from
occurring. In the interim the NAC will continue to seek funding opportunities for the conceptualised
family change space and a standalone multipurpose room for group fitness programing and use
by a variety of associated key user and community groups.
Risks & Opportunities
This report does not propose any new actions or activities which would shift risks or opportunities
beyond the current levels encountered as part of the NAC’s day-to-day operations. However, it
should be noted that the ongoing COVID-19 pandemic presents significant operational risk to the
NAC in the form of staff and patron safety and financial performance of the centre. Management
will continue to do all they can to effectively balance service provision and safety by operating
within the parameters set by State and Federal governments and departments, and those
endorsed by Council’s own internal COVID-19 taskforce.



                                                                                      Page 31 of 55

Section 32

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Management Accountant, Corporate Services
Departments/Sections Consulted:

      Chief Executive Officer   x   Community Services                      x   Corporate Services
      Executive Support         x   Director                                    Director
                                    Community Development                   x   Financial Services
                                x   Community Facilities                        Fleet
                                    Libraries & Galleries                       ICT
                                    Local Laws                                  Procurement
                                    Waste & Environmental Health                Property
                                                                                Revenue Services

      Executive Services            Environment & Sustainable Development       Infrastructure Services
      Director                      Director                                    Director
      Community Engagement          Building & Plumbing Services                Asset Management
      Customer Service              Development Assessment                      Buildings and Facilities
      Governance                    Economic Development                        Civil Operations
      People and Culture            Environmental Services                      Disaster Management
                                    Strategic Land Use Planning                 Infrastructure Planning,
                                                                                Design and Delivery




                                                                                           Page 32 of 55

Section 33

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                            7 SEPTEMBER 2021


5    NOOSA COMMUNITY SUPPORT (NCS) – FULL YEAR REPORT TO 30 JUNE 2021

Author            Noosa Community Support Coordinator, Linda Wylie
                  Community Services Department


Index             ECM/ Subject/ 1.05 Community Support Management

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Noosa Community Support Coordinator to the Services &
Organisation Committee meeting dated 7 September 2021, providing an update on the activities
of Noosa Community Support for the 2020/21 financial year.

REPORT
The purpose of this report is to advise Councillors of Noosa Community Support (NCS) activities
for the financial year ending 30 June 2021.

NCS receives funding from the Department of Health - Commonwealth Home Support Programme
(CHSP) to provide a broad range of entry-level services to assist frail older people aged 65 years
and over (50 years and over for Aboriginal and Torres Strait Islander people) who have functional
limitations (including cognitive), to remain living independently at home and in their community.

CHSP services are:
    domestic assistance
    social support - individual
    allied health care
    personal care
    social support – groups
    wellness and reablement groups
    flexible respite
    centre based day respite
    counselling /support, information and advocacy
    transport
    home maintenance
    minor home modifications
    goods, equipment and assistive technology.

NCS also receives funding from the Department of Housing and Public Works for the Home Assist
Secure (HAS) program to provide the following services to people aged 60 years and over or who
have a disability and hold a current pensioner concession card:
    information and referrals regarding health and wellbeing, home safety and security
    home maintenance
    minor home modifications



                                                                                   Page 33 of 55

Section 34

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


1.     FINANCIAL PERFORMANCE
The objective of all services within the Community Facilities branch is to balance the demands of
access, equity and community service obligations with sound financial management and improving
revenue through innovative and entrepreneurial approaches, whilst minimising operational costs.
NCS operates under funding agreements with both the State and Federal governments. The
requirements of the various funding agreements dictate that NCS should aim to perform to a ‘zero
bottom line’ standard, i.e. that all funding received should be fully expended on relevant programs
and services.
As per last year, while Covid-19 had a major impact on the team’s operations and their ability to
deliver certain services, this didn’t translate to a reduction in revenue because of the nature of the
bulk funding agreements in place at NCS. Funding bodies again advised of their willingness to be
flexible in how funding was expended during Covid-19.
NCS finished the year with a reported actual surplus of nearly $51k, however, it is expected that
this will reduce as year-end figures continue to be finalised. While revenue was down on budget
by $130k due to a reduction in fees and charges as a result of restricted programming, this was
fully offset by $202k of expenditure savings. Expenditure savings were realised in employee costs
and contractor services, again mainly as a result of restricted programming.

NCS interim financial performance as at 30 June 2021

 Statement of Income and Expenses          2020-21        2020-21       2020-21        %
                                           Original        YTD            YTD        Current       YTD
                                           Budget         Budget        Actuals      Budget      Variance
 Total Revenue                              2,635,171     2,764,741     2,634,594      95.3%         (130,148)
 Total Expenditure                          2,635,171     2,786,020     2,583,182      92.7%          202,838
 Net Result - Surplus/(Deficit)                       0    (21,278)       51,411                       72,690


 Total Revenue                              2,635,171     2,764,741     2,634,594      95.3%         (130,148)
 Direct Costs (Controllable)
     Employee Benefits                      1,520,099     1,520,099     1,457,629      95.9%           62,470
     Finance Costs                                    0             0      5,723      100.0%           (5,723)
     Materials & Services                    610,269       761,117       626,440       82.3%          134,678
     Other Expenses                               541          541           549      101.5%               (8)
 Subtotal Direct Costs (Controllable)       2,130,909     2,281,758     2,090,341      91.6%          191,417
 Operating Surplus/Deficit                   504,262       482,984       544,253                     (321,565)
 Indirect Costs (Corporate)
     Depreciation & Amortization               34,642       34,642        34,642      100.0%                0
     Internal Charges                        469,620       469,620       458,199       97.6%           11,420
 Subtotal Indirect Costs (Corporate)         504,262       504,262       492,842       97.7%           11,420
 Net Result - Surplus/(Deficit)                       0    (21,278)       51,411                       72,690

*Please note figures are interim financial results only as final figures were not available at the
time of compiling this report.




                                                                                       Page 34 of 55

Section 35

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    7 SEPTEMBER 2021



                                    Noosa Community Support
3,000,000

2,500,000

2,000,000

1,500,000

1,000,000

     500,000

           0
                         Total Revenue                Total Expenditure      Net Result - Surplus/(Deficit)
(500,000)


                                                  2020-21         2020-21
                                                  YTD             YTD
                                                  Budget          Actuals



2.      CUSTOMERS

                            Commonwealth Home Support Program YTD Outputs
                                     1 July 2020 to 30 June 2021
      Service                                                                      Services provided
      Allied Health Care                                                                       531
      Social Support - Group                                                                 6,562
                                     Telephone welfare checks     During COVID               2,212
                                                 Welfare visits   During COVID                  87
                                         Zoom exercise classes    During COVID                 220
      Goods & Assistive Technology Aids                                                         20
      Domestic Assistance                                                                    2,892
      Home Maintenance                                                                       1,909
      Home Modification                                                                        221
      Personal Care                                                                          1,220
      Flexible Respite                                                                         240
      Centre based day respite                                                                 118
      Social support - Individual                                                            2,261
      Transport                                                                              7,804
      Total                                                                                26,297


The above services (excluding welfare checks and zoom classes) delivered a total of 37,123 hours
of service to NCS CHSP clients during this period. Welfare telephone calls and visits ranged from
15 minutes to 2.5 hours, depending on the needs of the client.


                                                                                            Page 35 of 55

Section 36

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


                           Noosa Home Assist Summary YTD Outputs
                                  1 July 2020 to 30 June 2021
      Information & Referral                                  Services provided
         Total clients received info & referral                          1,361
      Home Maintenance/Minor Modifications
         HAS output hours                                                3,103

The above services delivered a total of 3,900 hours of service to clients through Noosa Home
Assist Secure during this period.

3.    STAFFING
A number of staff changes occurred during the year which gave the team the opportunity to
continue to streamline the structure and ensure staff skillsets are utilised as effectively as possible.
Group activities across NCS have operated intermittently between Covid-19 outbreaks and
subsequent restrictions. All other services continued and in some cases, grew, albeit with some
modifications to ensure staff and client safety. Staff who would normally deliver group activities
were reassigned to other NCS tasks and as such did not see a material drop in hours during Covid-
19.
There are no further staffing issues of significance to report.

4.    SYSTEMS, PROCESSES AND OTHER MATTERS
     Whilst group activities were restricted due to Covid-19, our clients continued to receive
      services during their isolation (home visits, telephone welfare checks, home delivery of
      shopping and other supplies).
     It was business as usual for Home Assist Secure and transport services, and in fact the
      demand for these services increased.
     Dementia-specific activities and services continue to be provided for our respite clients.
     All staff and volunteers have been trained in infection control and have adequate access to
      personal protective equipment (PPE) to help manage the risks of Covid-19.
     All guidelines and procedures have been updated to allow for appropriate Covid-19 safety
      measures.
     An operational review of the Home Assist Secure service model and structure has been
      finalised and guidelines and procedures have been updated and implemented accordingly.
     NCS continues to work closely with Council’s Community Development team. Additional
      Ageing Well Noosa fitness classes have been introduced in Cooroy, Pomona, Cooran,
      Noosaville (Noosa Leisure Centre), Tewantin Pool and Peregian Beach. These classes are
      very popular and provide significant benefit to attendees.
     Recommendations from the Royal Commission into Aged Care are being addressed to
      ensure NCS achieves ongoing compliance.
     CHSP funding will be extended through to June 2023, however the format of the funding may
      change somewhat (there is a proposed shift to a payment in arrears funding model). Beyond
      June 2023 there is a proposed new funding model called ‘Support at Home’ which NCS is
      currently investigating to determine how we can remain competitive within a changed funding
      landscape. CHSP funding comprises approximately 86% of total funding for NCS; HAS
      funding currently runs through to June 2023.

5.    FUTURE DIRECTION
     NCS will continue to work closely with Carers Gateway who provide financial and emotional
      support to carers. NCS has provided a counselling room to be used by a Carers Gateway
      social worker and counsellor. The impact of Covid-19 on carers has become highly evident


                                                                                        Page 36 of 55

Section 37

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                   7 SEPTEMBER 2021


        of late and more support for carers is one of the recommendations from the Royal
        Commission report.
       The local Parkinson’s Queensland support group have recently begun utilising the centre for
        their monthly meetings and social events and this mutually beneficial partnership will
        continue on in 2021/22.
       NCS will continue to collaborate with various Council teams and facilities to develop and
        implement innovative activities aimed at increasing the wellness of Noosa’s senior residents.
       Operations will continue to be streamlined and refined.
       Future improvements to the Centre to further enhance quality service provision for clients will
        be considered.

Previous Council Consideration
Nil.

Finance
Refer to Section 1 of this report.

Risks & Opportunities
This report does not propose any new actions or activities which would shift risks or opportunities
beyond the current levels encountered as part of the day-to-day operations at NCS. However, it
should be noted that the ongoing Covid-19 pandemic presents significant operational risk to NCS
in the form of staff and client safety. Management will continue to do all they can to effectively
balance service provision and safety by operating within the parameters set by State and Federal
governments and departments, and those endorsed by Council’s own internal Covid-19 taskforce.

Consultation
External Consultation - Community & Stakeholder
Nil

Internal Consultation
Management Accountant, Corporate Services.

Departments/Sections Consulted:


       Chief Executive Officer   x   Community Services                      x   Corporate Services
       Executive Support         x   Director                                    Director
                                     Community Development                   x   Financial Services
                                 x   Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

       Executive Services            Environment & Sustainable Development       Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 37 of 55

Section 38

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


6       NOOSA LEISURE CENTRE (NLC) – FULL YEAR REPORT TO 30 JUNE 2021

Author               Noosa Leisure Centre Coordinator, Cathy Simon
                     Community Services Department

Index                ECM /Subject / 72.03 Noosa Leisure Centre

Attachments          Nil

EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Noosa Leisure Centre Coordinator to the Services &
Organisation Committee meeting dated 7 September 2021, providing an update on the activities
of the Noosa Leisure Centre for the 2020/21 financial year.

REPORT
The purpose of this report is to advise Councillors of the Noosa Leisure Centre’s (NLC) activities
for the year ending 30 June 2021.
The NLC caters for badminton, futsal (indoor soccer), netball, basketball, volleyball, pickleball, kids’
playroom, group fitness classes, indoor rock climbing, corporate training, including Council
programs and school sessions, special events and venue hire. Meeting and conference rooms are
also available for hire. The indoor rock climbing wall is managed by an external contractor.

1.      FINANCIAL PERFORMANCE
The objective of all services within the Community Facilities branch is to balance the demands of
access, equity and community service obligations with sound financial management and to
improve revenue through innovative and entrepreneurial approaches, whilst minimising operational
costs.
It is important to note that Covid-19, its associated operating restrictions and the general
uncertainty around how facilities would be able to operate throughout the year had a significant
impact on the reported financial performance of all of Council’s community facilities in 2020/21. A
large component of this impact related to the difficulty of setting accurate budgets prior to the
commencement of the year, given the high level of operating uncertainty at the time. Despite
making some budget adjustments following completion of the third quarter there was ultimately still
a level of variability between budgeted and actual financial performance. Given this situation it may
be more meaningful to gauge the year’s performance by comparing to previous years’ results than
against budget.

NLC interim financial performance as at 30 June 2021

    Statement of Income and Expenses       2020-21        2020-21       2020-21        %
                                           Original        YTD            YTD        Current        YTD
                                           Budget         Budget        Actuals      Budget       Variance

 Total Revenue                                313,698       475,698      555,997       116.9%         80,299
 Total Expenditure                          1,069,419     1,083,419    1,127,210       104.0%       (43,791)
 Net Result - Surplus/(Deficit)              (755,721)    (607,721)     (571,213)                     36,509



                                                                                        Page 38 of 55

Section 39

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


 Statement of Income and Expenses          2020-21        2020-21       2020-21         %
                                           Original        YTD            YTD         Current         YTD
                                           Budget         Budget        Actuals       Budget        Variance

 Total Revenue                               313,698       475,698       555,997        116.9%            80,299
 Direct Costs (Controllable)
   Employee Benefits                         444,212       458,212       472,183        103.0%           (13,971)
   Finance Costs                                      0             0    (11,930)       100.0%            11,930
   Materials & Services                      296,517       296,517       340,259        114.8%           (43,743)
   Other Expenses                               3,207        3,207          3,257       101.5%               (50)
 Subtotal Direct Costs (Controllable)        743,936       757,936       803,770        106.0%           (45,834)
 Operating Surplus/Deficit                  (430,238)     (282,238)     (247,772)                        126,133
 Indirect Costs (Corporate)
   Depreciation & Amortization                 89,044       89,044        89,044        100.0%                 0
   Internal Charges                          236,439       236,439       234,396          99.1%            2,043
 Subtotal Indirect Costs (Corporate)         325,484       325,484       323,440          99.4%            2,043
 Net Result - Surplus/(Deficit)             (755,721)     (607,721)     (571,213)                         36,509
*Please note figures are interim financial results only as final figures were not available at the
time of compiling this report.


                                  Noosa Leisure Centre
1,400,000
1,200,000
1,000,000
  800,000
  600,000
  400,000
  200,000
        0
(200,000)             Total Revenue            Total Expenditure        Net Result - Surplus/(Deficit)
(400,000)
(600,000)
(800,000)


                                          2020-21          2020-21
                                          YTD…             YTD…


End of year performance against budget shows revenue up 17%, while expenditure was over
budget by 4%. Overall, the centre finished $36k ahead of the net budgeted position, a strong result
given the impact and uncertainties of Covid-19.
NLC operated with quite restrictive patron density limits in place throughout the first quarter but
was largely able to operate as per normal thereafter. That said, there were brief periods of low
visitation numbers due to shutdowns or restrictions on people being able to visit if they’d recently
been in hot spots.
All revenue streams performed strongly against budget, particularly group fitness revenue,
however, a comparison to previous years’ performance paints a more meaningful picture. When

                                                                                         Page 39 of 55

Section 40

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     7 SEPTEMBER 2021


compared to the three-year average across 2016/17 to 2018/19, venue hire was down 18%, food
(café) sales down 22%, retail down 10% and crèche down 52%. This underperformance points to
a structural shift in consumers’ usage patterns since Covid-19 emerged and it is expected that we
will continue to see underperformance in these areas moving forward.
Pleasingly, NLC saw very strong revenue performance from the group fitness program which
produced revenue of $221k, roughly $70k or 47% higher than the three-year average. Sports
program revenue also performed well, up 17% on the three-year average. The group fitness
program has continued its impressive growth trajectory over recent years and NLC’s evolving
offering is clearly being well received by locals who are keen to exercise and connect with each
other. It’s a similar story for sports program revenue, with strong performance in this category
thanks to growing participation in stadium sports such as pickleball and badminton, as well as
others. Both group fitness and sports programs benefit from membership revenue and have been
beneficiaries of more patrons choosing to utilise NLC’s services via a membership instead of as a
casual user or visit pass holder.
Expenditure finished the year approximately $44k over budget which was more indicative of
inaccurate budgets rather than true overspends. When comparing results to the previously
referenced three-year average there were few material variances to report. Employee costs were
up 10% on the three-year average, however, this is unsurprising given the compounding effect of
pay rises, growth in group fitness labour and expanded weekend operating hours over this time.
The snapshot of historical performance below shows that the net operating result for NLC has
remained relatively consistent over recent years. This is particularly pleasing given the impacts of
Covid-19 over the past two years and the negative structural changes we’re seeing to revenue
streams such as venue hire and café sales.
NLC historical financial performance – 2016/17 to 2020/21
                                             2016/17     2017/18     2018/19     2019/20     2020/21
Revenue                                      actuals     actuals     actuals     actuals     actuals
40023 - Miscellaneous Fees & Charges               0           0           0           0           0
41103 - Other - Sales - Bar & Kiosk Sales          0           0           0           0           0
41154 - Venue Hire                           159,382     174,028     174,233     125,455     139,362
42019 - Other - Sales - Food                 177,777     180,011     177,696     131,115     138,806
42020 - Other - Sales - Retail                   563       7,165       4,181       3,948       3,564
42074 - Group Fitness Revenue                118,451     146,775     185,424     161,104     221,021
42076 - Creche Revenue                         9,712       8,704       8,253       4,964       4,258
42077 - Kids Playroom Revenue                 17,198      21,507      22,895      13,623      20,957
42078 - Sports Program Revenue                20,234      25,587      25,927      23,250      28,029
49030 - Internal Recoveries - Catering             0           0           0           0           0
                                             503,318     563,776     598,607     463,459     555,997


Controllable expenses
6EX01 - Employee Benefits                    413,875     427,629     446,174     413,505     472,183
6EX02 - Finance Costs                          1,174       (851)       (220)       (187)     (11,930)
6EX03 - Materials & Services                 329,676     341,621     369,887     293,039     340,259
6EX06 - Other Expenses                         2,921       3,023       3,129       2,985        3,257
                                             747,646     771,423     818,970     709,343     803,770

Net operating result                        (244,327)   (207,646)   (220,362)   (245,884)   (247,772)


Uncontrollable expenses
6EX04 - Depreciation & Amortization           74,755      84,767      84,767      88,938      89,044
6EX12 - Internal Charges                     147,793     304,066     213,217     224,039     234,396
                                             222,548     388,833     297,984     312,977     323,440

Total operating result                      (466,875)   (596,479)   (518,347)   (558,861)   (571,213)

                                                                                            Page 40 of 55

Section 41

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                7 SEPTEMBER 2021


2.       CUSTOMERS
NLC recorded 80,898 attendances for the year, up 10% on the previous year’s total of 73,470
(noting that 2019/20 was more heavily impacted by Covid-19 shutdowns and restrictions). Covid-
19 restrictions continue to have a large impact on NLC’s visitation numbers, particularly as limited
spectators are permitted to watch sporting groups and children’s activities. Additionally, a reduction
in venue hire bookings and café visits impacted the overall attendance figures for the year.
Although the era of hosting large events at NLC seems to have ended for now, it was pleasing to
see the return of Rotary Noosa Daybreak’s annual charity event, Bookfest, following the
cancellation of last year’s event due to Covid-19.

                           NLC annual attendance comparison
 140,000
                                                                127,580

 120,000
                                                 109,108
                             101,877
 100,000         89,840
                                                                                                 80,898
     80,000                                                                           73,470


     60,000


     40,000


     20,000


         0
                 2015/16     2016/17             2017/18        2018/19              2019/20     2020/21

Tracking the cost per visit, both for operational cost (exclusive of depreciation and internal charges)
and total cost, can be an effective way to gauge efficiency of service delivery over time. The below
chart clearly shows the impact of reduced attendance on this metric over the past two Covid-
affected years.

                           NLC annual cost per visit comparison
 $8.00                                                                                  $7.61
                                                                                                    $7.06
 $7.00

 $6.00                                             $5.46
                  $5.30
 $5.00                         $4.54
                                                                   $4.06
 $4.00                                                                           $3.35
                                                                                                $3.06
              $2.81
 $3.00                     $2.36
                                              $1.90           $1.72
 $2.00

 $1.00

 $0.00
              2015/16       2016/17            2017/18         2018/19               2019/20    2020/21

                                   Operating cost per visit   Total cost per visit


                                                                                                          Page 41 of 55

Section 42

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                              7 SEPTEMBER 2021


3.     STAFFING
NLC has one full-time staff member (NLC Coordinator) and approximately 15 casual staff.
Staff have worked well together throughout the year, ensuring Covid-19 systems and requirements
are upheld and have liaised closely with patrons and clients on the implications of the various
restrictions and lockdowns. Staff have been particularly grateful for the support Council has shown
them via the provision of pandemic leave and redeployment opportunities throughout Covid
shutdowns.
There are no further staffing issues of significance to report.

4.     SYSTEMS, PROCESSES AND OTHER MATTERS
      With the assistance of Council’s Covid-19 Taskforce and the Queensland Ambulance
       Service, NLC was activated as a temporary Covid-19 testing site in January for just under
       two weeks. While the stadium was used for the entry and exit of participants being tested,
       the facility was able to continue running some non-stadium programs during this time.
      To improve awareness of NLC all year round, a promotional video was filmed, highlighting
       the multiple services NLC provides for the community. The videos will be uploaded on the
       website and used for social media campaigns in the near future.
      In an effort to improve lighting in the car parks and pathways throughout the Wallace Park
       Precinct, an upgrade of the LED lights throughout the precinct is in progress. Not only will
       the improved lighting benefit our participants who attend evening programs, it will also
       provide extra security and comfort to evacuees when the facility is utilised for emergency
       evacuation purposes. Funding has been secured through the 2019 Queensland Bushfires –
       DRFA Category D funding program.
      Completion of a number of planned maintenance projects including:
       -    Installation of covers over stadium exhaust fans to prevent water ingress onto stadium
            floors, particularly during wild weather events.
       -    Upgrade of ageing and faulty stadium scoreboard in Court 2.
      An upgrade to the upstairs meeting room was also completed, which included new carpet,
       bench, sink and cupboards and a more energy efficient air conditioning system.
5.     FUTURE DIRECTION
      Safe management of the facility in line with Covid-19 restrictions and rebuilding of the
       centre’s customer and revenue base.
      Continue to monitor and review attendance numbers for NLC programs to ensure programs
       continue to represent a viable ongoing offering.
      Upgrade of faulting scoreboard on Court 1.
      Complete strategic planning for the facility, including the development of a ‘current state of
       affairs’ report which will look to kick-start the thinking around the long-term development of
       the centre.
      Continued enhancements to the centre’s aesthetics.
      Upgrade of current Links centre management software to allow for enhanced online
       offerings, as well as a more reliable in-house experience for staff.
      A review of the current usage arrangements with long-term hirers.
Previous Council Consideration
Nil.


                                                                                      Page 42 of 55

Section 43

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                   7 SEPTEMBER 2021


Finance
Refer to Section 1 of this report.

Risks & Opportunities
This report does not propose any new actions or activities which would shift risks or opportunities
beyond the current levels encountered as part of NLC’s day-to-day operations. However, it should
be noted that the ongoing Covid-19 pandemic presents significant operational risk to NLC in the
form of staff and patron safety and financial performance of the centre. Management will continue
to do all they can to effectively balance service provision and safety by operating within the
parameters set by State and Federal governments and departments, and those endorsed by
Council’s own internal Covid-19 taskforce.

Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Management Accountant, Corporate Services

Departments/Sections Consulted:

       Chief Executive Officer   x   Community Services                      x   Corporate Services
       Executive Support         x   Director                                    Director
                                     Community Development                   x   Financial Services
                                 x   Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

       Executive Services            Environment & Sustainable Development       Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 43 of 55

Section 44

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


7     THE J – FULL YEAR REPORT TO 30 JUNE 2021

Author            The J & BCC Coordinator, Scott Braby
                  Community Services Department

Index             ECM/ Subject/ 72.01 The J

Attachments       Nil


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by The J & Bicentennial Community Centre Coordinator to the Services
& Organisation Committee meeting dated 7 September 2021, providing an update on the activities
of The J for the 2020/21 financial year.

REPORT
The purpose of this report is to advise Councillors of The J’s activities for the financial year ending
30 June 2021.
The J continues to operate as a versatile, multi-use community venue. It hosts a wide range of
activities, performances and live entertainment. It is also home to current tenants the University of
the Sunshine Coast (who will cease their lease agreement on 31 December 2021) and Noosa
Community Radio.
The J is the venue of choice for a number of community groups including Community Solutions,
Sunshine Coast Youth Justice, STEPS, Noosa Chorale, Alliance Françoise, Noosa Alive, Hillsong
Church, USC–CIDSEL, Noosa Music Society, Noosa Film Society, and numerous school and
commercial dance/theatre groups who conduct a range of youth activities, performances, awards
and presentation ceremonies.
The J’s theatre/auditorium capacity sits at 402 (including portable mezzanine seating for 64). The
mezzanine area continues to be regularly utilised by hirers to extend theatre capacity or as a
separate meeting space for up to 50 people. The J also offers a combination of additional flexible
meeting spaces, conference rooms and facilities for hire which are complemented by covered
outdoor areas and stylish open foyers.

1.    FINANCIAL PERFORMANCE
The objective of all services within the Community Facilities branch is to balance the demands of
access, equity and community service obligations with sound financial management and to improve
revenue through innovative and entrepreneurial approaches, whilst minimising operational costs.
It is important to note that Covid-19, its associated operating restrictions and the general uncertainty
around how facilities would be able to operate throughout the year had a significant impact on the
reported financial performance of all of Council’s community facilities in 2020/21. A large component
of this impact related to the difficulty of setting accurate budgets prior to the commencement of the
year, given the high level of operating uncertainty at the time. That said, The J was also
disproportionately affected by operating restrictions in comparison to other facilities. Given this
situation it may be more meaningful to gauge the year’s performance by comparing to previous
years’ results than against budget.



                                                                                        Page 44 of 55

Section 45

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      7 SEPTEMBER 2021


The J interim financial performance as at 30 June 2021

 Statement of Income and Expenses            2020-21        2020-21       2020-21         %
                                             Original        YTD            YTD         Current        YTD
                                             Budget         Budget        Actuals       Budget       Variance

 Total Revenue                                 362,792       362,792        407,220       112.2%         44,428
 Total Expenditure                            1,272,604     1,272,604     1,249,500        98.2%         23,105
 Net Result - Surplus/(Deficit)               (909,812)     (909,812)     (842,279)                      67,533


 Total Revenue                                 362,792       362,792        407,220       112.2%         44,428
 Direct Costs (Controllable)
   Employee Benefits                           422,707       422,707        431,660       102.1%         (8,952)
   Finance Costs                                        0             0          36       100.0%            (36)
   Materials & Services                        306,739       306,739        284,678        92.8%         22,061
   Other Expenses                                 1,087         1,087         1,103       101.5%            (17)
 Subtotal Direct Costs (Controllable)          730,533       730,533        717,477        98.2%         13,055
 Operating Surplus/Deficit                    (367,741)     (367,741)     (310,257)                      31,373
 Indirect Costs (Corporate)
   Depreciation & Amortization                 267,185       267,185        267,185       100.0%                0
   Internal Charges                            274,887       274,887        264,837        96.3%         10,050
 Subtotal Indirect Costs (Corporate)           542,072       542,072        532,022        98.1%         10,050
 Net Result - Surplus/(Deficit)               (909,812)     (909,812)     (842,279)                      67,533
*Please note figures are interim financial results only as final figures were not available at the time
of compiling this report.


                      The J Community Centre
 1,500,000

 1,000,000

   500,000

          0
                   Total Revenue        Total Expenditure         Net Result -
  (500,000)                                                      Surplus/(Deficit)

(1,000,000)

(1,500,000)

                                   2020-21        2020-21
                                   YTD…           YTD…


The J’s financial result was considerably impacted by ongoing Covid-19 operating restrictions which
effectively rendered the venue inoperable for the first half of the year. The centre largely lost all ability
to generate revenue throughout this period and was also required to issue a number of refunds to
customers and hirers for cancelled bookings. The second half of the year resembled something
closer to a normal operating period and was at times very busy as rescheduled performances were
slotted in amongst pre-existing bookings. A real highlight during this time was selling out five Kitty
Flanagan performances!
                                                                                             Page 45 of 55

Section 46

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        7 SEPTEMBER 2021


By end of year, revenue was 12% ahead of budget, while expenditure was roughly 2% below budget.
Overall, the centre finished $67k ahead of the net budgeted position, a strong result given the
significant impact and uncertainties of Covid-19.
All revenue streams performed strongly against budget, however, a comparison to previous years’
performance paints a more meaningful picture. When compared to the three-year average across
2016/17 to 2018/19, revenue performance as a whole was down around 38%, with that level of
reduction fairly consistent across most revenue streams. The one exception was lease revenue
which was down only 10% on the average as a majority of rental payments were made in line with
budget throughout the year.
Expenditure finished the year broadly in line with budget expectations. When compared to three-
year averages, materials and services costs tracked roughly 31% under the three-year average
which is reflective of savings made in areas directly related to hosting performances. Employee costs
were down 7% on the three-year average, with only minor labour savings made because staff were
largely redeployed or working on behind the scenes tasks during operating restrictions.
The comparison of historical financial performance below clearly shows the negative impact of
Covid-19 on revenue from 2019/20 onwards. While some expenditure savings have been achieved
during Covid, they have not been sufficient to fully offset the negative revenue impacts and therefore
the operating performance of the venue has understandably deteriorated over the past two years.
Despite this, staff remain committed to running the venue as efficiently and effectively as the
operating conditions allow for.
The J historical financial performance – 2016/17 to 2020/21
                                                    2016/17     2017/18     2018/19     2019/20       2020/21
Revenue                                             actuals     actuals     actuals     actuals       actuals
40025 - Misc Fees - Venue Catering                    2,240         127           0           0             0
40032 - Other - Sales - Equipment Hire               42,323      55,644      54,931      47,758        38,957
40034 - Lease Revenue                                81,372      88,825      91,759      84,976        78,887
41103 - Other - Sales - Bar & Kiosk Sales           120,015     141,696     125,955      81,394        73,288
41154 - Venue Hire                                  164,521     187,961     192,983     143,570        95,118
42000 - Other - Commission Received                  46,122      60,278      55,173      38,467        28,400
42017 - Other - Sales - Tickets                      27,749      26,684      21,956       7,116        21,075
42032 - Other - Sundry Recoupment                     4,822      12,359       9,598      10,802         9,108
42043 - Other - Misc - Photocopying and Printing      4,050       3,781       4,521       3,113           250
42044 - Other - Misc - Employee Cost Recoveries      73,944     123,677     110,170      84,817        55,927
42046 - Other - Misc - Telephone Transaction Fee      1,413       1,364       1,207         757           714
42050 - Marketing Recoupment/Recovery                 2,603       5,666       4,690       8,440         5,496
49029 - Internal Recoveries - Venue Hire              1,485           0           0           0             0
                                                    572,658     708,062     672,942     511,210       407,220


Controllable expenses
6EX01 - Employee Benefits                           435,061     462,775     489,231     465,299       431,660
6EX02 - Finance Costs                                     0       (214)       (101)         (26)           36
6EX03 - Materials & Services                        400,108     446,584     397,606     309,742       284,678
6EX06 - Other Expenses                                   74       1,024       1,060       1,084         1,103
                                                    835,243     910,169     887,795     776,099       717,477

Net operating result                               (262,585)   (202,106)   (214,854)   (264,889)     (310,257)


Uncontrollable expenses
6EX04 - Depreciation & Amortization                 241,050     257,369     258,648     266,695       267,185
6EX12 - Internal Charges                            199,305     299,393     263,568     277,808       264,837
                                                    440,356     556,762     522,216     544,503       532,022

Total operating result                             (702,940)   (758,868)   (737,069)   (809,393)     (842,279)

                                                                                                   Page 46 of 55

Section 47

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                          7 SEPTEMBER 2021


2.   CUSTOMERS

An overview of users and events accommodated at The J over the past 12 months is as follows:

Education/Schools/Govt – Workshops, performances and presentations
    St Teresa’s Catholic College
    St Andrews Anglican College
    Good Shepherd Lutheran College
    USC & USC-CIDSEL International Development
    Sunshine Coast Youth Justice
    Noosa Flexible Learning
    Federal & State MP’s
    Qld Fire & Rescue Service
    Noosa Professional Dance Academy
    The Dance Centre Peregian Beach
    NDIS
    Australian Energy Foundation
    Office of Liquor & Gaming
    LGMA

Community groups
   Noosa Council Community & internal/workshops
   Noosa Chorale
   Noosa Heads Jazz Club
   Noosa Music Society
   Noosa Business Mentoring
   Noosa Chances
   Sunshine Coast Community Orchestra
   Sunshine Coast Creative Alliance
   Community Focus Association
   Community Solutions
   Wesley Mission
   STEPS
   Endeavour Foundation
   United Synergies
   Noosa Community Radio
   Tourism Noosa
   Hillsong Church
   Sunshine Beach SLSC
   QMusic

Special events
    Noosa Alive (Noosa Long Weekend Festival)
    Australian Citizenship Ceremonies
    Noosa Jazz Party
    Ironman Oz
    Santa’s Classy Helpers

Comedy
   Melbourne Comedy International Road Show
   Sydney Comedy Festival
   Sunshine Coast Comedy Festival – Mel Buttle
   Kitty Flanagan
                                                                                 Page 47 of 55

Section 48

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                          7 SEPTEMBER 2021


        Jimeoin
        Arj Barker
        Anna Brennan
        Nickelby
        Comedy Circus Stunt Show

Live music/bands/dance
     Sound Feast Open Mic/Live Bands
     Tribute Bands (various)
     Soweto Gospel Choir
     A Taste of Ireland

Theatre
    Sunshine Coast Youth Theatre
    Mad About Theatre
    Little Seed Theatre Company
    Coast Academy of Song & Dance
    Hamburger Productions
    Performing Arts Factory
    Jally Productions
Film
    Flickerfest
    Manhattan Short Film Festival
    Ocean Film Festival
    Banff Mountain Film Festival
    Radical Reals
    Top Dog Film Festival


                        The J annual attendance comparison
    100,000
                                                 90,992
     90,000                          85,089
                          79,740
     80,000    76,970

     70,000                                                  62,881
     60,000

     50,000
                                                                          39,161
     40,000

     30,000

     20,000

     10,000

         0
              2015/16     2016/17   2017/18      2018/19     2019/20     2020/21


The above attendance figures are inclusive of USC and Noosa Community Radio attendances and
all events and bookings at The J. The ongoing effects of Covid-19 through 2020/21 are clear and
saw attendance numbers decline to their lowest levels in recent history.



                                                                                   Page 48 of 55

Section 49

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                      7 SEPTEMBER 2021



                             Total value of tickets sold at The J
 $1,200,000
                                               $1,053,134
                                                                 $1,013,781
 $1,000,000
                               $872,971

  $800,000
                                                                                    $652,156          $677,213
                  $595,673
  $600,000


  $400,000


  $200,000


          $0
                  2015/16      2016/17          2017/18           2018/19           2019/20           2020/21


The total value of tickets sold in 2020/21 was marginally higher than the previous year which shows
just how strong the second half of the year was given nearly all ticket sales occurred in this period
alone (for comparison, 2019/20’s result related to approximately nine months of the year).


                              The J annual cost per visit comparison
 $25.00

                                                                                                                    $21.51

 $20.00



 $15.00
                                                                                               $12.87

                   $9.64
 $10.00                           $8.76                $8.92
                                                                            $8.10                               $7.92


  $5.00                                                                                    $4.21
               $3.48          $3.25
                                                 $2.38               $2.36


  $0.00
                2015/16        2016/17            2017/18             2018/19               2019/20              2020/21

                                      Operating cost per visit      Total cost per visit


Tracking the cost per visit, both for operational cost (exclusive of depreciation and internal charges)
and total cost, can be an effective way to gauge efficiency of service delivery over time. The above
chart clearly shows the impact of reduced attendance on this metric over the past two Covid-affected
years.




                                                                                                                 Page 49 of 55

Section 50

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


3.    STAFFING
The J’s small team continues to work well, running the centre in a highly efficient manner, particularly
when compared to other similar venues with larger teams. The impact of Covid-19 remains
significant for the team and continues to cause operational headaches as shows are cancelled,
performers are unable to enter Qld and/or theatre occupancy limits are reduced in line with ever-
changing operating restrictions. The team have handled this volatile period extremely well and
continue to operate with the utmost professionalism during a highly stressful period.
On a positive note, a new part-time Marketing & Communications Officer was appointed earlier this
year, filling a long-term void within the structure.

4.    SYSTEMS & PROCESSES AND OTHER MATTERS
     A much-needed refurbishment of the theatre’s 15-year-old seating took place this year thanks
      to a State Government Covid grant. Initial feedback from patrons is that the seats are now
      much more comfortable.
     The J continued to support other Council departments during the prolonged Covid closure and
      were deployed to assist several community organisations during this time.

5.    FUTURE DIRECTION
     Manage the ongoing challenges of Covid-19 and the at times significant impact of operating
      restrictions.
     Review of The J’s booking system and consideration of alternatives.
     Development of a new 5-year business plan.
     Ongoing liaison with Noosa FM with the view to formalise an extended lease given their recent
      achievement of greater operational and financial stability.
     Following USC’s decision not to activate their next 5-year lease option at The J, prepare an
      options paper outlining possible future uses of this space. The options paper will consider a
      wide range of possibilities with a focus on ensuring any future uses are compatible with existing
      operations at The J.

Previous Council Consideration
Nil

Finance
Refer to Section 1 of this report.

Risks & Opportunities
This report does not propose any new actions or activities which would shift risks or opportunities
beyond the current levels encountered as part of The J’s day-to-day operations. However, it should
be noted that the ongoing Covid-19 pandemic presents significant operational risk to the centre in
the form of staff and patron safety and financial performance. Management will continue to do all
they can to effectively balance service provision and safety by operating within the parameters set
by State and Federal governments and departments, and those endorsed by Council’s own internal
Covid-19 taskforce.

Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Management Accountant, Corporate Services

                                                                                        Page 50 of 55

Section 51

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                  7 SEPTEMBER 2021


Departments/Sections Consulted:

    Chief Executive Officer   x   Community Services                      x   Corporate Services
    Executive Support         x   Director                                    Director
                                  Community Development                   x   Financial Services
                              x   Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                                  Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 51 of 55

Section 52

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 7 SEPTEMBER 2021


8     BICENTENNIAL COMMUNITY CENTRE (BCC) – FULL YEAR REPORT TO 30 JUNE 2021

Author            The J & BCC Coordinator, Scott Braby
                  Community Services Department

Index             ECM/ Subject/ 72.01 BCC

Attachments       Nil


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by The J & Bicentennial Community Centre Coordinator to the Services
& Organisation Committee meeting dated 7 September 2021, providing an update on the activities
of the Bicentennial Community Centre for the 2020/21 financial year.


REPORT
The purpose of this report is to advise Councillors of Bicentennial Community Centre’s (BCC)
activities for the financial year ending 30 June 2021.
The BCC comprises the Main Hall, Annexe and Demountable buildings. The BCC is permanently
occupied by two community groups, being Noosa Gymnastics Club (Main Hall) and Montessori
Noosa (Demountable and Annexe).

1.    FINANCIAL PERFORMANCE
The objective of all services within the Community Facilities branch is to balance the demands of
access, equity and community service obligations with sound financial management and to improve
revenue through innovative and entrepreneurial approaches, whilst minimising operational costs.
It is important to note that Covid-19, its associated operating restrictions and the general uncertainty
around how facilities would be able to operate throughout the year had a significant impact on the
reported financial performance of all of Council’s community facilities in 2020/21. A large component
of this impact related to the difficulty of setting accurate budgets prior to the commencement of the
year, given the high level of operating uncertainty at the time. Given this situation it may be more
meaningful to gauge the year’s performance by comparing to previous years’ results than against
budget.




                                                                                        Page 52 of 55

Section 53

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     7 SEPTEMBER 2021


BCC interim financial performance as at 30 June 2021
 Statement of Income and Expenses         2020-21        2020-21       2020-21         %
                                          Original        YTD            YTD         Current         YTD
                                          Budget         Budget        Actuals       Budget        Variance

 Total Revenue                             148,198        148,198       137,929         93.1%        (10,269)
 Total Expenditure                         134,695        134,695       127,230         94.5%             7,466
 Net Result - Surplus/(Deficit)              13,503        13,503        10,700                       (2,803)
 Total Revenue                             148,198        148,198       137,929         93.1%        (10,269)
 Direct Costs (Controllable)
   Employee Benefits                         12,000        12,000        13,235        110.3%         (1,235)
   Finance Costs                                     0             0             0        0.0%               0
   Materials & Services                      38,060        38,060        29,372         77.2%             8,687
   Other Expenses                               541          541            549        101.5%               (8)
 Subtotal Direct Costs (Controllable)        50,601        50,601        43,157         85.3%             7,444
 Operating Surplus/Deficit                   97,597        97,597        94,773                      (17,712)
 Indirect Costs (Corporate)
   Depreciation & Amortization               73,019        73,019        73,019        100.0%                0
   Internal Charges                          11,075        11,075        11,053         99.8%               22
 Subtotal Indirect Costs (Corporate)         84,095        84,095        84,073        100.0%               22
 Net Result - Surplus/(Deficit)              13,503        13,503        10,700                       (2,803)
*Please note figures are interim financial results only as final figures were not available at the time
of compiling this report.


                           Bicentennial Community Centre
160,000

140,000

120,000

100,000

 80,000

 60,000

 40,000

 20,000

       0
                     Total Revenue            Total Expenditure          Net Result - Surplus/(Deficit)
                                            2020-21          2020-21
                                            YTD              YTD
                                            Budget           Actuals


BCC’s revenue suffered slightly as a result of rent relief provided to Noosa Gymnastics Club during
their enforced Covid-19 shutdown at the start of the year. However, the revenue shortfall was largely
offset by maintenance expenditure savings and as a result the net financial result for the year was
just $3k behind budget.
                                                                                     Page 53 of 55

Section 54

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                               7 SEPTEMBER 2021


The comparison of historical financial performance below reveals that revenue growth has plateaued
over the past few years. Fortunately, controllable expenses have reduced over the same period,
creating a trend of enhanced operating performance. While this trend is now expected to stabilise,
it’s pleasing to see BCC performing so strongly.

BCC historical financial performance – 2016/17 to 2020/21

                                          2016/17     2017/18      2018/19     2019/20      2020/21
Revenue                                   actuals     actuals      actuals     actuals      actuals
40034 - Lease Revenue                      76,670     101,045      103,246      91,413       97,929
41154 - Venue Hire                         36,125      20,726       35,000      40,000       40,000
                                          112,795     121,771      138,246     131,413      137,929


Controllable expenses
6EX01 - Employee Benefits                  12,884       9,258       10,374      12,813       13,235
6EX02 - Finance Costs                           0         387            0           0            0
6EX03 - Materials & Services               53,318      58,469       43,011      37,868       29,372
6EX06 - Other Expenses                        493         510          528         540          549
                                           66,695      68,624       53,913      51,221       43,157

Net operating result                      46,100       53,147      84,333       80,193       94,773


Uncontrollable expenses
6EX04 - Depreciation & Amortization        50,286      56,067       68,050      84,532       73,019
6EX12 - Internal Charges                    7,346       7,230        7,515      11,425       11,053
                                           57,632      63,297       75,565      95,957       84,073

Total operating result                   (11,532)     (10,150)       8,768     (15,764)      10,700


2.    CUSTOMERS
The key customers at BCC remain Noosa Gymnastics Club (Main Hall lease), Noosa Montessori
School (Demountable building lease and Annexe hire with intention to lease) and Little Seed Theatre
Company (Noosa Montessori School sublets space to this group). No usage occurs outside of these
groups due to the permanent and exclusive nature of the usage agreements.
Council does not maintain visitation statistics for BCC and thus statistics are unable to be provided.

3.    STAFFING
The J staff continue to oversee BCC’s operations and the small team does a great job of running
both centres in a highly efficient manner. Given the nature of BCC’s utilisation by permanent tenants,
there is now little day-to-day involvement at BCC for Council staff. However, relationship
management and oversight of major building maintenance projects remain a priority.

4.    SYSTEMS & PROCESSES AND OTHER MATTERS
     Montessori Noosa has continued to expand. Negotiations are ongoing to finalise an expanded
      lease arrangement with Montessori Noosa, encompassing both the Demountable and Annexe
      buildings.
     A new lease is proposed for Noosa Gymnastics Club to encompass the extensions of the BCC
      Main Hall, however the formalisation of this lease has been delayed during the recent Covid-
      disrupted period.
                                                                                    Page 54 of 55

Section 55

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     7 SEPTEMBER 2021


5.     FUTURE DIRECTION
      Continue liaison with all key users of BCC and update leases to reflect changing usage of the
       site.
      Review and prioritise ongoing maintenance requirements, especially given the age and
       condition of parts of the facility.

Previous Council Consideration
Nil

Finance
Refer to Section 1 of this report.

Risks & Opportunities
This report does not propose any new actions or activities which would shift risks or opportunities
beyond the current levels encountered as part of BCC’s day-to-day operations. However, it should
be noted that the ongoing COVID-19 pandemic presents significant operational risk to the centre in
the form of lessee and patron safety and financial performance of the site. Management will continue
to do all they can to effectively balance service provision and safety by ensuring lessees are
operating within the parameters set by State and Federal governments and departments.

Consultation
External Consultation - Community & Stakeholder
Nil

Internal Consultation
Management Accountant, Corporate Services
Departments/Sections Consulted:

      Chief Executive Officer   x    Community Services                      x   Corporate Services
      Executive Support         x    Director                                    Director
                                     Community Development                   x   Financial Services
                                x    Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

      Executive Services             Environment & Sustainable Development       Infrastructure Services
      Director                       Director                                    Director
      Community Engagement           Building & Plumbing Services                Asset Management
      Customer Service               Development Assessment                      Buildings and Facilities
      Governance                     Economic Development                        Civil Operations
      People and Culture             Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




7      CLOSED SESSION

       Nil.
                                                                                              Page 55 of 55

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.