Original source · versioned page text
Swmp Rfi
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
33 Pavilion Street, Pomona PSP Developments Pty Ltd Flood and Stormwater Management Plan 23-0167SMP01-V2 October 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalThe download may take up to a minute.
Full text of the other 50 sections
Section 2
Commercial in Confidence
This document is commercial-in-confidence. The recipient of this document agrees to hold all information presented
within as confidential and agree not to use or disclose or allow to use or disclosure of the said information to
unauthorized parties, directly or indirectly, irrespective of the acceptance or rejection of the presentation or at any time
before, during or after an agreement has been reached, without prior written consent.
This report is prepared by Colliers | Engineering & Design for exclusive use by its client only. No responsibility is accepted
for the use of or reliance upon this report in whole or in part by any third party.
Limitations
The sole purpose of this report and the associated services performed by Colliers | Engineering & Design is to display
information in accordance with the scope of services set out in the contract/quotation between Colliers | Engineering &
Design and its client. The scope of works and services were defined by the requests of the client, by the time and
budgetary constraints imposed by the client, and by the availability of access to site/s and information.
This report is prepared with information supplied by the client and possibly others which is presumed to be accurate and
complete. No responsibility is accepted for information that is withheld, incorrect or that is inaccurate, nor for changes
to the conditions over the passage of time or from latent circumstance or conditions. No warranty or guarantee is made
in relation to the data, findings and conclusions expressed in this report.
This report has been compiled at the level of detail specified in the report and no responsibility is accepted for
interpretations made at more detailed levels than so indicated.
Report Contact:
Name: Lochlan Gillis
Position Senior Water Resources Engineer
Phone: (07) 3532 1300
Document Control
21-0352FSMP02-V3
Version Date Details Prepared Checked Approved Signed RPEQ
1 18/07/2023 Issue BB / LG LG KM 09298
2 06/10/2023 Issue LG KM KM 09298
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page i
Section 3
Executive Summary Colliers Engineering and Design have been engaged by PSP Developments Pty Ltd to prepare a Stormwater Management Plan (SMP) in support of a development application to Noosa Shire Council (NSC) over land located at 33 Pavilion Street, Pomona (Lot 4 RP809059). This development application seeks a development permit for a Reconfiguration a Lot (ROL) to create 8 residential lots. The site has an existing building at Lot 1 and no works are required to create lot 1. The location of the proposed development site has a total land holdings area covering 3.33ha. The site is consistent with a rural residential land use type with some wooded vegetation cover over the site. The site is accessed by Pavilion Street to the east and Majestic Place to the south and is bounded by private allotments to the north, east and south. Cooroora Creek is located in the adjacent property to the west. It can be seen from the results presented that the treatment measures proposed for the development site achieve the performance criteria set by the NSC Planning Scheme (2020) and SPP (July 2017). Annual Load Reductions of Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen (TN) and Gross Pollutants (GP) between the Mitigated and Unmitigated Scenarios have been achieved through the upgrade of the existing bioretention basin from 80m2 to 130m2. It has been demonstrated that non-worsening of peak flows has been achieved to the discharge point for events up to the 1% AEP event. The results show that there is non-worsening for events up the 1% AEP. The intent of sizing the detention basin is to mitigate flows up to the 10% AEP storm event to ensure non-worsening of discharges into the downstream flow path. In larger events, flows from the site will start to sheet flow across the rear of the site to Cooroora Creek. As the discharge point for the site becomes inundated from Cooroora Creek flooding in the major storm event, it is considered non-worsening has been achieved. The catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha and it is considered that no quantifiable change to downstream flooding conditions would result. The development is located above the regional 1% (2100) AEP flood extent with 500mm freeboard recommended to future dwellings on the new allotments. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 4
Table of Contents
Executive Summary ................................................................................ 2
1. Introduction ..................................................................................... 6
1.1 Site Characteristics ................................................................................ 6
1.1. Flood Overlay ......................................................................................... 7
1.2. Lawful Point of Discharge .................................................................... 8
1.3. Request for Information ....................................................................... 9
Item 10: Issue – Earthworks ..............................................................................9
Item 11 9
Item: Flood impact assessment ........................................................................9
Item 16 / 17 ...................................................................................................... 10
Items 18 - 20 .................................................................................................... 10
Item 21 11
Item 23 / 24 ...................................................................................................... 12
2. STORMWATER QUANTITY.............................................................. 13
2.1. Hydrologic Assessment ...................................................................... 13
2.1.1. Existing Scenario .............................................................................. 13
2.1.2. Rational Method Check ................................................................... 14
2.1.3. Developed Scenario ......................................................................... 15
2.1.4. Mitigation Scenario.......................................................................... 17
2.2. Flood Investigation .............................................................................. 19
2.2.1. Flood Model ...................................................................................... 19
2.2.2. Existing Scenario (E05) .................................................................... 19
2.2.3. Proposed Scenario (P06)................................................................. 19
2.2.4. Afflux .................................................................................................. 19
2.2.5. Peak Flow .......................................................................................... 20
2.2.6. Flood Storage ................................................................................... 20
2.2.7. Flood Immunity ................................................................................ 21
3. STORMWATER QUALITY ................................................................ 23
3.1. Design Objectives ................................................................................ 23
3.2. Stormwater Quality Treatment ......................................................... 23
3.2.1. Strategy ............................................................................................. 23
3.2.2. MUSIC Parameters........................................................................... 23
3.2.3. Catchment Areas .............................................................................. 24
3.2.4. MUSIC Model Layout ....................................................................... 25
3.3. Treatment Measures .......................................................................... 26
3.3.1. Bioretention System ......................................................................... 26
3.3.2. Sediment Forebays .......................................................................... 27
3.4. Results .................................................................................................. 27
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 5
4. CONSTRUCTION PHASE MANAGEMENT ...................................... 29
4.1. Erosion and Sediment Control .......................................................... 29
5. ESTABLISHMENT AND OPERATIONAL PHASE
MANAGEMENT ............................................................................... 30
5.1. Establishment ...................................................................................... 30
5.2. Operational .......................................................................................... 30
6. CONCLUSION .................................................................................. 31
7. REFERENCES.................................................................................... 32
List of Tables
Table 2-1: Summary of Existing Catchment Parameters .......................... 14
Table 2-2: Existing Catchment Peak Flows – SUB3..................................... 14
Table 2-3: Comparison of WBNM and Rational Method Peak Flows –
SUB3 ................................................................................................................ 14
Table 2-4: External catchment overland flow (entering site) and pipe
flow (diverted around site via Pavilion St)................................................... 16
Table 2-5: Summary of Developed Catchment Parameters ..................... 16
Table 2-6: Comparison of Peak Flows At Site Outlet (Existing Vs.
Developed)...................................................................................................... 16
Table 2-7: Summary of Basin Structure Details ......................................... 17
Table 2-8: Comparison of Peak Flows (Existing Vs. Mitigated) ................. 18
Table 2-9: Comparison of 1% AEP event across all durations (Existing
Vs. Mitigated) .................................................................................................. 18
Table 2-10: Existing and Proposed Peak discharge at the Site
Boundary. ....................................................................................................... 20
Table 2-11: 1% AEP Flood Storage Comparison. ........................................ 20
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood
Levels............................................................................................................... 21
Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ....... 23
Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export
Parameters ..................................................................................................... 24
Table 3-3: MUSIC Runoff Generation Parameters ..................................... 24
Table 3-4: Catchment Areas ......................................................................... 24
Table 3-5: Bioretention Design Parameters ............................................... 27
Table 3-6: Sediment Forebay Design Parameters...................................... 27
Table 3-7: MUSIC Results – Load Based Pollutant Outputs ...................... 27
Table 3-8: MUSIC Results – Portion of total pollutant loads for External
Catchment and Site ....................................................................................... 28
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 6
List of Figures
Figure 1-1: Site Location .................................................................................. 7
Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping
(2019 Aerial)...................................................................................................... 8
Figure 2-1: Existing Catchment Delineation................................................ 13
Figure 2-2: Developed Catchment Delineation .......................................... 15
Figure 2-3: Proposed cut / fill areas and extent of 1% AEP (CC) flood
level ................................................................................................................. 21
Figure 2-4: 1% (2100) AEP Peak Water Surface Elevation Reporting
Locations ......................................................................................................... 22
Figure 3-1: WSUD Catchment Locality Plan ................................................ 25
Figure 3-2: MUSIC Model Layout .................................................................. 26
Appendices
Reconfiguration of Lot Plan and Concept Engineering
Rational Method and WBNM Output
Existing Flood Map
Proposed Flood Map
Flood Afflux Map
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 7
1. Introduction
Colliers Engineering and Design have been engaged by PSP Developments Pty Ltd to prepare a Stormwater
Management Plan (SMP) in support of a development application to Noosa Shire Council (NSC) over land
located at 33 Pavilion Street, Pomona (Lot 4 RP809059). This development application seeks a development
permit for a Reconfiguration a Lot (ROL) to create 8 residential lots. The site has an existing building at Lot 1
and no works are required to create lot 1.
The proposed outcome of this document is to identify stormwater management options that could be
implemented within the development in order to achieve the requirements and targets of NSC Planning
Scheme “Water Quality and Drainage Code” as well as the relevant provisions of State Planning Policy (SPP
2017). The intent of the codes associated with these documents will be achieved through the appropriate
integration of stormwater management options within the proposed residential land-use. The objectives of
this Stormwater Management Plan are to:
Detail the proposed stormwater quality management strategy and how the load reduction
objectives specified by the State Planning Policy (SPP, DSDIP 2017) and NSC Planning Scheme are
achieved during the operational phase of the development;
Consider suitable Stormwater Quality Improvement Devices (SQID’s) based on Water Sensitive
Urban Design (WSUD) principles;
Outline the maintenance requirements for the proposed stormwater quality improvement
devices;
Ensure the development achieves non-worsening of stormwater flows downstream of the site;
and
Demonstrate how the lawful point of discharge requirements for the site will be achieved.
Demonstrate development is located outside of Flood Hazard Overlay Mapping.
The proposed development layout and preliminary engineering drawings is provided in Appendix A.
1.1 Site Characteristics
The location of the proposed development site is shown in Figure 1-1, with a total land holdings area
covering 3.33ha. The site is consistent with a rural residential land use type with some wooded vegetation
cover over the site. The site is accessed by Pavilion Street to the east and Majestic Place to the south and is
bounded by private allotments to the north, east and south. Cooroora Creek is located in the adjacent
property to the west.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 6
Section 8
SITE Figure 1-1: Site Location 1.1. Flood Overlay The rear of the site is partially influenced by flooding from Cooroora Creek, which is located to the west of the property. The inundation extent identified in the Flood Hazard Overlay is highlighted in Figure 1-2. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 7
Section 9
Figure 1-2: Overland Flow Paths and Flood Hazard Overlay Mapping (2019 Aerial)
1.2. Lawful Point of Discharge
As outlined by the Queensland Urban Drainage Manual (4th Edition – Institute of Public Works Engineering
Australasia, Queensland Division) a test can be undertaken to determine whether a lawful point of
discharge exists:
The criteria for determining the lawful point of discharge are:
(i) Will the proposed development alter the site’s stormwater discharge characteristics in a manner
that may substantially damage a third-party property (see Section 3.6)?
If not, then no further steps are required to obtain tenure for a lawful point of discharge
(assuming any previous circumstances and changes were lawful).
It is proposed that discharge of runoff from the proposed development site will be maintained to the
property boundary within the mapped waterway.
It is considered that discharge from the site will be managed in such a manner as to not substantially
damage third party property, and as a result it is considered suitable lawful points of discharge has been
identified and achieved.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 8
Section 10
1.3. Request for Information
An information request from Noosa Council, dated 15 August 2023, requested further information on the
development application (RAL23/0013). Items relevant to the Flood Investigation and Stormwater
Management Plan are listed below together with the relevant response(s).
Item 10: Issue – Earthworks
Section 2.2.1 of Collier’s Flood and Stormwater Plan proposes the following:
a. A drain at a depth of 0.4m in a 3-metre-wide easement; and
b. 1,250m of cut at a depth of 0.1m.
Insufficient information has been provided demonstrating the location and extent of these works. Any works that
is located outside of the subject site (33 Pavilion Street) must be supported with the landowners’ written consent.
Response:
The earthworks (drain in 3mtr easement, and 1250m3 cut) are part of 25 Pavilion works and have been
constructed.
Section 2.2.1 of the SMP has been updated to show the works as “existing” to clarify this point.
Item 11
Provide additional detail demonstrating the location and extent of the works proposed in Section 2.2.1 of Collier’s
Flood and Stormwater Plan. The additional detail must be prepared by a suitably qualified person (RPEQ –
Registered Professional Engineer of Queensland) and include, but not be limited to:
a. details of the proposed stormwater drain and easement (location, grades, lots benefitted and burdened);
and
b. where works are located outside of the subject site (33 Pavilion Street), provide all respective landowners’
written consent.
Response:
The stormwater drain and easement are not proposed works. They are existing works as part of adjoining
application 25 Pavilion. Section 2.2.1 SMP has been updated to clarify this point.
Item: Flood impact assessment
The submitted Flood and Stormwater Plan prepared by Colliers includes aerial imagery that does not reflect the
recent subdivision at 25 Pavilion Street (now Majestic Drive). It is unclear to Council if survey data reflecting the
newly completed works has been used in conjunction with Lidar to provide an accurate assessment of the
proposed flood and afflux mapping. Council is concerned that the proposed earthworks may adversely affect the
flood characteristics of external sites.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 9
Section 11
Response:
Note: Afflux mapping has been updated since V1 of the report as follows:
existing scenario has been revised from E03 to E04,
proposed scenario has been revised from P04 to P06.
The existing scenario (E04) includes:
site survey of 25 Pavilion St, Pomona, prior to development works.
a design surface of the engineering design at 25 Pavilion St, Pomona
SMP-V2 has figures updated with aerial imagery that reflects the recent subdivision at 25 Pavilion Street
(now Majestic Drive), showing the subdivision has been considered in the existing scenario.
Item 16 / 17
16. Provide additional comment detailing that the submitted Flood Investigation has been conducted using recent
survey data of the completed works along 25 Pavilion Street (now Majestic Drive).
17. Alternatively, provide an amended Flood Investigation that utilises recent survey data in conjunction with Lidar
to more accurately assess the impacts the proposed subdivision works will have on flood depths on external sites.
The amended Flood Investigation must be prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland).
Response:
The flood investigation has conducted using the design surface supplied by TOD consulting, which 25
Pavilion St has been constructed to, and is considered of sufficient accuracy for the purpose of the flood
investigation.
Items 18 - 20
Provide an updated flood impact assessment and proposal plans which address the following:
18. Provide updated proposal plans which show drainage easement overall balance areas of Lot 9 which will
remain below the 1%AEP (2100) flood level
19. Amend the earthworks design for Lots 8 and 9 such that there is no net loss of floodplainstorage (e.g. provide
partial retaining)
20. Provide an additional flood afflux map showing the impacts associated with this development only (i.e. not
combined impacts with 25 Pavilion St development).
Response:
18. Figure 2-3 in the report has been added to clarify proposed cut and fill areas in relation to the 1% AEP
(Climate change) flood level/
19. Updated
20. Afflux map updated (E05 vs P06) – Refer SMP-V2 Appendix E.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 10
Section 12
Item 21
Issue: Storage sizing does not appear to be in accordance with QUDM and ARR2019.
Information Request
21. Provide revised sizing/modelling and associated engineering drawings and reporting for the detention storage
proposed for the development site, which achieves the following:
a. Is undertaken using the ensemble storms approach of ARR2019
b. The detention storage volume of ~200m3/ha (of development) is considered low for this type of land use
change. The pervious initial loss reported in the SWMP appears to be much lower than the
recommendations of either QUDM or ARR2019 and is likely to result in under-sizing of the detention
storage due to an over-estimate of the pre-development peak flows. Justify the assumed initial loss or
adopt a revised value consistent with QUDM and ARR2019
c. Provide a copy of the WBNM model for review
d. Update the basin design to ensure the freeboard requirements of QUDM are achieved for the 1%AEP
(2100) event. The proposed freeboard of 50mm is not acceptable as it presents an unacceptable risk of
embankment overtopping and failure
e. Demonstrate no increase in peak flows for all events up to and including the 1%AEP (2100) event, for the
range of durations applicable to the downstream land, not just the critical duration at the site boundary.
f. Explanation is required for why the 1%AEP (2100) peak flow is predicted to decrease in Table 2-5 rather
than increase following development?
g. Are Tables 2-1 and 2-2 meant to refer to Sub3 rather than Sub1 (the neighbouring site)?
h. The SWMP makes a number of assumptions regarding contribution of flows from East of Pavilion St,
without justifying how this has been quantified. Calculations supporting the estimated conveyance
capacity of Pavilion St are requested.
Response:
21. Figure 2-3 in the report has been added to clarify proposed cut and fill areas in relation to the 1% AEP
(Climate change) flood level/
a. iWBNM Lite (2019 version) ultilised, which applies ARR2019 with ensemble storms.
b. IL revised to 35mm and CL revised to 2.4 mm/hr in line with ARR2019 datahub values.
c. Files will be supplied to Council as requested.
d. The updated basin achieves a freeboard of 0.19m. This improves upon the existing approved
freeboard (0.14m) currently provided within the basin for 25 Pavilion St, Pomona, as per
Stormwater Management Plan 21-066-SMP02-V1.
The augmented basin design has considered flood storage area within the flood overlay, and has
limited fill to achieve a balance between providing basin capacity, and achieving flood storage area.
As the basin has capacity to contain the 1% AEP (climate change) in the fully blocked case, it is
considered that the basin design satisfies the multiple objectives at the site.
e. Refer Table 2-9 for a summary of peak mitigated flows for the 1% AEP event across all storm
durations. The analysis demonstrates non-worsening has been achieved across a range of
durations.
f. Table updated.
g. Tables updated.
h. Table 2-4 has been provided to qualify the contribution of flows from catchments Ex1 and Ex2 east
of Pavilion St, demonstrating the portion of 10% AEP pipe flow diverted around the site and the
portion of overland flow that tops Pavilion St and enters the site.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 11
Section 13
Item 23 / 24 Issue - Stormwater Quality It is unclear how compliance with the pollutant load reduction targets have been calculated. The development source node unmitigated loads should be factored by the required pollutant reduction percentages and then compared to the results from the model. It is unclear if this has been done. Information Request: 23. Provide a copy of the MUSIC model. 24. Provide further reporting of results which shows: the unmitigated loads from the development site(s) nodes only, the required load reductions (kg/yr) from the development site loads in order to meet the targets, and the mitigated results at the receiving node. Response: 24. Calculations for mitigated loads are shown in Table 3-8, demonstrating that the bioretention basin meets the target reductions for the development site. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 12
Section 14
2. STORMWATER QUANTITY
The objective of this component of the study is to investigate the potential impact that the proposed
development will have on peak flows discharging downstream from the site.
2.1. Hydrologic Assessment
Hydrologic modelling of the catchments has been undertaken using WBNM software (Boyd et al, 2019),
developed jointly by the University of Wollongong, Rienco Consulting and Balance R&D. The 2019 version
has been used for this investigation which utilizes ARR2019 hydrology.
Modelling has been carried out for the 1, 2, 5, 10, 20, 50 and 100-year Average Recurrence Interval (ARI)
storm events for the following scenarios:
1. Existing Scenario (base case)
2. Developed Scenario
3. Mitigated Scenario
2.1.1. Existing Scenario
Sub-catchments have been delineated using 1m contours sourced from the NSC catalogue, developed
using 2015 LiDAR and site survey. The fraction impervious values have been calculated using aerial imagery.
Figure 2-1 shows the existing catchment delineation with a summary of parameters shown in Table 2-1.
Figure 2-1: Existing Catchment Delineation
The existing drainage capacity of Pavilion Street is approximately equivalent to the 10% AEP storm event,
with flow greater than this overtopping the verge and entering the site at both 25 and 33 Pavilion Street. To
account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP. The portion
of flow greater than the 10% AEP was converted into a ratio, which was then applied to the catchment area
as detailed below in Table 2-1. This ensured that flows from SUB1-Ex greater than the 10% AEP were
routed through the site.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 13
Section 15
Table 2-1: Summary of Existing Catchment Parameters
Sub-catchment Downstream Area (ha) Imperviousness (%)
Catchment
Ex2 SUB3 1.960 50
Ex1 SUB1 0.287 50
SUB3 SUB4 2.085 21
SUB1 SUB2 2.079 11
SUB2 SUB4 1.354 5
SUB4 SINK 0.511 5
Ex1 (<10% AEP) 0.0* -
Ex1 (5% AEP) 0.047* 50
Ex1 (2% AEP) 0.095* 50
Ex1 (1% AEP) 0.138* 50
Ex2 (<10% AEP) 0.0* -
Ex2 (5% AEP) 0.455* 50
Ex2 (2% AEP) 0.979* 50
Ex2 (1% AEP) 1.388* 50
* area factored based on flow rate for events greater than 10% AEP
The WBNM model has been run for events from 1 to 100-year ARI and for durations of 20 minutes to 3
hours. A WBNM catchment lag factor of 1.6 was applied which is within the recommended range. An initial
and continuing loss of 10mm and 2.4mm/hr has been applied (refer to Rational Method Check). The
resulting peak flows for the critical duration are provided in Table 2-2 for each event at the outlet reporting
locations.
Table 2-2: Existing Catchment Peak Flows – SUB3
Event AEP 63.20% 50% 20% 10% 5% 2% 1% 1%CC
Existing (m3/s) 0.13 0.16 0.30 0.38 0.47 0.58 0.68 0.88
2.1.2. Rational Method Check
Pre-development peak flows have been checked against peak flows determined using the Rational Method
(RM) for SUB3, as shown in Table 2-3. A time of concentration of 20.6 minutes was determined for SUB3
rational method. It can be seen there is values are generally within ten percent difference across events
assessed, indicating that the WBNM model flows are suitable for use. Refer to Appendix B for a summary of
rational method parameters used.
Table 2-3: Comparison of WBNM and Rational Method Peak Flows – SUB3
Event AEP 63.20% 50% 20% 10% 5% 2% 1% 1%CC
Rational 0.15 0.18 0.28 0.34 0.41 0.52 0.60 0.72
Existing (m3/s) 0.13 0.16 0.30 0.38 0.47 0.58 0.68 0.88
Change (%) -13% -10% 7% 11% 14% 11% 13% 22%
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 14
Section 16
2.1.3. Developed Scenario The Developed Scenario has been modelled in WBNM by adjusting the site’s fractions impervious values and catchment delineation to represent the proposed development. The impervious fraction for the developed portion of the SUB1 (adjoining approval) and SUB3 has increased from 11% to 50% (values consistent with ‘Urban Residential – low density (Including roads)’ catchments in QUDM (2017)). The developed catchment delineation is shown in Figure 2-2. SUB1 and SUB3 represents the development with flows being routed through the existing detention basin (which has been increased in volume). The catchment parameters are summarised in Table 2-5. Figure 2-2: Developed Catchment Delineation Similar to the existing scenario, the existing drainage capacity of Pavilion Street is approximately equivalent to the 10% AEP storm event, with flow greater than this overtopping the verge and entering the site. To account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP. The portion of flow greater than the 10% AEP was converted into a ratio, which was then applied to the catchment area as detailed below in Table 2-4 and Table 2-5. This ensured that flows from SUB1-Ex greater than the 10% AEP were routed through the site. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 15
Section 17
Table 2-4: External catchment overland flow (entering site) and pipe flow (diverted around site via Pavilion St)
Flow 10% AEP 5% AEP 2% AEP 1% AEP 1% CC AEP
Area Flow Area Flow Area Flow Area Flow Area Flow
(ha) (m3/s) (ha) (m3/s) (ha) (m3/s) (ha) (m3/s) (ha) (m3/s)
TOTAL 1.960 0.437 1.960 0.534 1.960 0.671 1.960 0.768 1.960 0.982
EX2 Overland - - 0.300 0.097 0.618 0.234 0.782 0.331 1.032 0.545
Pipe 0.437 0.437 0.437 0.437 0.437
TOTAL 0.287 0.165 0.287 0.093 0.287 0.114 0.287 0.130 0.287 0.165
EX1 Overland - - 0.049 0.018 0.093 0.039 0.116 0.055 0.152 0.091
Pipe flow 0.075 0.075 0.075 0.075 0.075
Table 2-5: Summary of Developed Catchment Parameters
Sub-catchment Downstream Area (ha) Imperviousness (%)
Catchment
Ex2 SUB3 1.960 50
Ex1 SUB1 0.287 50
SUB3 SUB2 1.780 50
SUB1 SUB2 2.079 50
SUB2 SUB4 1.354 5
SUB4 SINK 0.819 5
Ex1 (<10% AEP) 0.0* -
Ex1 (5% AEP) 0.049* 50
Ex1 (2% AEP) 0.093* 50
Ex1 (1% AEP) 0.116* 50
Ex1 (1% AEP CC) 0.152* 50
Ex2 (<10% AEP) 0.0* -
Ex2 (5% AEP) 0.300* 50
Ex2 (2% AEP) 0.618* 50
Ex2 (1% AEP) 0.782* 50
Ex2 (1% AEP CC) 1.032* 50
* area factored based on flow rate for events greater than 10% AEP
The increased imperviousness and changes to catchment areas associated with the development resulted
in an increase in peak flows to the sites outlet as shown in Table 2-6. Mitigation will be required to ensure
non-worsening downstream and satisfy the lawful point of discharge requirements.
Table 2-6: Comparison of Peak Flows At Site Outlet (Existing Vs. Developed)
Event AEP 63.20% 50% 20% 10% 5% 2% 1% 1%CC
Existing (m3/s) 0.32 0.41 0.69 0.90 1.21 1.62 2.01 2.57
Developed (m3/s) 0.34 0.43 0.73 0.94 1.25 1.66 2.04 2.63
Change (m3/s) 0.03 0.02 0.03 0.04 0.03 0.04 0.04 0.06
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 16
Section 18
2.1.4. Mitigation Scenario
When comparing the peak flows in the existing and developed scenarios, increases in the peak discharge
are predicted at the site outlet. A detention basin is proposed to attenuate peak flows discharging from the
site to demonstrate non-worsening and meet the legal point of discharge requirements.
All modelling parameters remain consistent between the developed and mitigated scenarios, with the
addition of detention basins. The proposed basin structure details are summarised in Table 2-7 with
Concept Engineering Drawings included in Appendix A.
Table 2-7: Summary of Basin Structure Details
Sub-catchment Existing Basin Upgraded Basin
Elevation (RL) Storage (m3)
0 0 0
0.1 26 35
0.2 55 74
0.3 87 117
0.4 123 163
0.5 162 214
0.6 205 268
0.7 251 327
0.8 301 391
0.9 338 458
0.97 - 508
Pipe Outlet 1 x 450mm RCP at RL0.0m 1 x 450mm RCP at RL0.0m
Bioretention Outlet Not modelled 1 x 450mm RCP at RL-0.9m
Weir Outlet 4m wide at RL.0.60m 8m wide at RL.0.60m
Crest Level RL 0.97m RL 0.97m
Q100CC WSL RL 0.83m RL0.78m
Q100CC Freeboard 0.14m 0.19m
Peak flows from the mitigated scenario modelling are presented in Table 2-8 with a comparison against the
existing peak flows. The results show that there is non-worsening for events up the 1% AEP. The intent of
sizing the detention basin is to mitigate flows up to the 10% AEP storm event to ensure non-worsening of
discharges into the downstream flow path. In larger events, flows from the site will start to sheet flow
across the rear of the site to Cooroora Creek. As the discharge point for the site becomes inundated from
Cooroora Creek flooding in the major storm event (refer Figure 1-2), it is considered that the non-worsening
has been achieved.
Table 2-8 contains a summary of peak mitigated flows for the 1% AEP event across all storm durations. The
analysis demonstrates non-worsening has been achieved across a range of durations.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 17
Section 19
Table 2-8: Comparison of Peak Flows (Existing Vs. Mitigated)
Event AEP 63.2% 50% 20% 10% 5% 2% 1% 1% CC
Existing (m3/s) 0.33 0.43 0.72 0.92 1.21 1.55 1.86 2.57
Mitigated (m3/s) 0.34 0.43 0.66 0.82 1.04 1.49 1.82 2.46
Change (m3/s) 0.01 0.00 -0.06 -0.10 -0.17 -0.06 -0.04 -0.10
Table 2-9: Comparison of 1% AEP event across all durations (Existing Vs. Mitigated)
Duration
10 15 20 25 30 45 60 90 120 180 270 360
(min)
Existing
0.98 1.68 2.13 2.45 2.57 2.49 2.45 2.29 2.16 2.04 1.77 2.02
(m3/s)
Mitigated
0.91 1.53 1.96 2.28 2.38 2.46 2.35 2.20 2.06 1.89 1.69 1.92
(m3/s)
Change
-0.07 -0.15 -0.17 -0.17 -0.18 -0.03 -0.09 -0.09 -0.11 -0.15 -0.08 -0.10
(m3/s)
Table 2-7 provides a summary of the basin configuration and it is noted there is 0.19m freeboard from the
1% (2100) AEP flood level to the basin crest. A sensitivity analysis was undertaken to assess the impact of
100% blockage of both basin outlet configurations. Under this scenario the flood level rose to RL0.89m and
demonstrates the spillway is able to convey the 1% (2100) AEP flows under fully blocked conditions without
overtopping the embankment crest. Given this and the fact that the land downstream of the detention
basin will remain undeveloped it is considered that the 0.08m from the 1% (2100) AEP flood level (and
0.37m from spillway level) to basin crest level is acceptable.
It is noted that with the inclusion of 0.3m of Extended Detention Depth for the co-located bioretention
basin, the total Q20 depth for the basin is expected to be less than the 1.2m recommended by QUDM for
safety concerns.
Refer to Appendix B for summary of WBNM output.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 18
Section 20
2.2. Flood Investigation
The proposed development footprint is currently largely located outside of the NSC Flood Hazard Overlay
Mapping; however, the rear of lot 8 and 9 is partially inundated in the 1% (2100) AEP. The Noosa Plan Flood
Hazard Overlay Code identifies that any development / filling below the 1% (2100) AEP flood level must
demonstrate that no off-site impacts and no loss of flood plain storage is demonstrated.
Council’s Pomona Flood Model was utilised to represent the development proposal and demonstrate the
requirements of the Flood Hazard Overlay Code.
2.2.1. Flood Model
The NSC Pomona Flood Model was utilised as the basis for the flood assessment to represent flooding in
the 1% (2100) AEP event. The model was setup and run for the Existing and Proposed Scenarios. The
model was utilised in full, with the following updates made to represent these two scenarios:
Existing (E05)
Reduce model grid size from 5m to 2m.
Update model terrain to utilise 2015 Lidar and site survey.
Model was run using HPC and the latest TUFLOW engine (version 2020-10-AA).
Represented 1D channels in 2D with smaller grid size.
Site survey of 25 Pavilion St, Pomona, prior to development works.
Represented design for 25 Pavilion St, Pomona, including:
o surface of preliminary engineering design
o drain in 3m easement (approx. 0.4m deep at 1% grade).
o area of cut, 1,250m2 and 0.1m deep.
Site survey of 33 Pavilion St, Pomona.
Proposed (P06)
Update model terrain to include updated engineering design for 33 Pavilion St, Pomona (supplied
by TOD Consulting, 21 September 2023).
2.2.2. Existing Scenario (E05)
The existing case model has been setup and run for the 1% (2100) AEP flood event. The results of this have
been used as the basis for assessing the potential impacts that may result from the development.
Appendix C details the existing flood extent in relation to the development site.
2.2.3. Proposed Scenario (P06)
The proposed case model has been setup and run for the 1% (2100) AEP flood event, which incorporates
the proposed development site. Appendix D details the proposed flood extent in relation to the
development site. An indicative site plan is overlaid on this figure to highlight how the development relates
to the flood extent.
2.2.4. Afflux
Afflux mapping has been undertaken for the 1% (2100) AEP events to identify whether there are any
impacts resulting, and if so, whether an alternative development arrangement needs to be investigated.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 19
Section 21
Appendix E details the afflux map which compares the existing and proposed case for the 1% (2100) AEP
flood levels. It is noted that based on the current development arrangement there are no increases in flood
levels noted either upstream or downstream as a result of the development site itself.
2.2.5. Peak Flow
The assessment found the peak discharge at the site boundary are predicted to decrease slightly. This is
shown in Table 2-10 which compares the Existing and Proposed peak discharge at the site boundary. As
such it is considered that non-worsening is achieved, and the development does not impact peak flow rates
in the regional flood event.
Table 2-10: Existing and Proposed Peak discharge at the Site Boundary.
Peak Flow 1% (2100) AEP
Existing – E03 (m3/s) 304.53
Proposed – P06 (m3/s) 303.96
Change (m3/s) -0.57
2.2.6. Flood Storage
A flood storage assessment has been completed over the site to ensure there is no loss of flood plain
storage has resulted from the development. The assessment includes the adjacent site at 25 Pavilion St, as
a small amount of earthworks to extend into 25 Pavilion St is proposed to augment the capacity of the
detention basin. The assessment found that there was some loss of flood plain storage due to the
development. Therefore, a proposed (with cut) scenario is proposed to achieve the flood storage balance.
For the existing flood storage calculation, the existing peak 1% (2100) AEP flood surface was compared to
the existing model terrain (after construction of 25 Pavilion St). Similarly with the proposed flood storage
calculation, the proposed (no cut) peak 1% (2100) AEP flood surface was compared to the proposed model
terrain. The proposed (with cut) scenario incorporates an area of shallow cut to offset loss of floodplain
storage between the building pad fill at lot 8 and the vegetation covenant. Refer to engineering drawings
(Appendix A) for extent of proposed cut.
Details of the flood plain storage within 33 and 25 Pavilion Street, Pomona, in the existing, proposed and
mitigated cases is summarised below in Table 2-11. A summary of proposed cut and fill areas in relation to
the 1% AEP (Climate change) flood level is shown in Figure 2-3.
Table 2-11: 1% AEP Flood Storage Comparison.
Scenario Flood Plain Storage (m3)
25 Pavilion St 33 Pavilion St Total Balance
Existing 7899 10440 18339
Proposed (no cut) 7890 10353 18243 -96
Proposed (with
7890 10449 18339 0
cut)
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 20
Section 22
Existing 1% AEP flood level
Area of shallow cut to offset
loss of floodplain storage.
Fill – earthworks to augment the
capacity of the existing basin
Fill at lot 8 building platform
Figure 2-3: Proposed cut / fill areas and extent of 1% AEP (CC) flood level
2.2.7. Flood Immunity
The NSC Planning Scheme identifies the Defined Flood Event, from which freeboard is set is the 1% (2100)
AEP flood event. Flood levels around the site for the 1% (2100) AEP are detailed for various reporting
locations as shown in Figure 2-4. This shows the proposed new lots are above the 1% (2100) AEP peak flood
levels. The peak flood level, minimum finished flood level and proposed lot level is shown in Table 2-12. It
is seen that greater than 500mm freeboard is provided to lot. It is recommended that future buildings on
each lot achieve a minimum of 500mm freeboard above the regional 1% (2100) AEP flood level.
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood Levels
Lot 1% AEP Peak Flood Minimum Freeboard Min Finished Floor Proposed Min Lot
Level (m AHD) to Floor (m) Level (m AHD) Level (m AHD)
8 83.44 0.5 83.94 87.61*
*Reported level is min lot level within the proposed building footprint area
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 21
Section 23
Figure 2-4: 1% (2100) AEP Peak Water Surface Elevation Reporting Locations It is noted that flood levels at 25 Pavilion St for the 1% (2100) AEP are unaffected by the proposal at 33 Pavilion St, with exception of the small area of afflux adjacent Lot 10. In this area, water surface elevation has increased from 83.71m AHD to 83.8m AHD. However, this has no impact on Lot 10, 25 Pavilion St, as the 1% AEP Peak Level adjacent the site is consistent with peak level of 85.11m AHD as per previous modelling for 25 Pavilion St (report 21-0166SMP01-V1). The afflux is reasoned to be a small area of instability within the model and is not predicted to be observable in practice. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 22
Section 24
3. STORMWATER QUALITY
3.1. Design Objectives
This report identifies the stormwater quality management objectives for the operational phase (post-
construction phase) of the proposed development. Construction based stormwater quality management
objectives will need to be addressed as part of operational works documentation.
NSC Planning Scheme (2020) defines the post-construction phase Water Quality Objectives as shown in
Table 3-1.
Table 3-1: Site Stormwater Quality Objectives (Operational Phase)
Minimum reductions in mean annual loads from unmitigated development (%)
Total Suspended Total Phosphorous Total Nitrogen Gross pollutants
Solids (TSS) (TP) (TN) >5 mm
80 60 45 90
3.2. Stormwater Quality Treatment
3.2.1. Strategy
The objective of this report is to assess the stormwater quality measures required based on the
development layout to support the development application. Runoff from the development will be
collected in a stormwater drainage system and discharged into a bioretention basin prior to being
discharged from the site, with the existing bioretention basin associated with 25 Pavilion Street, being
extended.
3.2.2. MUSIC Parameters
An assessment of stormwater runoff quality from the existing conditions and proposed developed
conditions has been undertaken using the Model for Urban Stormwater Improvement Conceptualisation
(MUSIC) – Version 6.3, released in 2018.
Climate data for the catchment was sourced from the MUSIC model database. The rainfall and evaporation
data template for this site has been based on data from Cooroy from 1/1/1973- 31/12/1983 with six (6)
minute rainfall duration.
Table 3-2 and Table 3-3 outline the adopted source node parameters from “MUSIC Modelling Guidelines”
(Water By Design, 2010) that were used in the MUSIC model.
The site density of 10 dwellings per hectare, with the source nodes being assigned percentage impervious
values based on 10 dwellings per hectare
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 23
Section 25
Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters
Total Suspended
Total Phosphorous Total Nitrogen
Solids
(Log10 mg/L) (Log10 mg/L)
Land Use Parameter (Log10 mg/L)
Storm Base Storm Base Storm Base
Flow Flow Flow Flow Flow Flow
Mean 2.18 1.0 -0.47 -0.97 0.26 0.20
Ground
Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20
Mean 2.43 1.0 -0.30 -0.97 0.26 0.20
Road
Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20
Mean 1.30 N/A -0.89 N/A 0.26 N/A
Roof
Std Deviation 0.39 N/A 0.31 N/A 0.23 N/A
Table 3-3: MUSIC Runoff Generation Parameters
Parameter Urban
Rainfall Threshold (mm) 1
Soil Capacity (mm) 500
Initial Storage (%) 10
Field Capacity 200
Infiltration Capacity Coefficient a 211
Infiltration Capacity Coefficient b 5
Initial Depth (mm) 50
Daily Recharge (%) 28
Daily Drainage (%) 27
Daily Deep Seepage Rate (%) 0
3.2.3. Catchment Areas
The development site and external catchment has been split into three catchments containing split source
nodes (road, roof and ground) representing total developed area reporting to the bioretention basin. As it
is proposed to extend the existing bioretention basin approved with reconfiguration of lot at 25 Pavilion
Street, the catchment setup from that approval has also been represented. Table 3-4 outlines the
catchment areas and imperviousness represented within the MUSIC model. The stormwater quality
catchments are provided in Figure 3-1.
Table 3-4: Catchment Areas
Catchment Road (ha) Roof (ha) Ground (ha) Total (ha)
1 0.342 0.250 0.791 1.384
Ex1 - 0.049 0.415 0.464
2 0.157 0.250 0.854 1.261
Ex2 0.091 0.639 0.73
Impervious % 60 100 15 -
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 24
Section 26
Figure 3-1: WSUD Catchment Locality Plan 3.2.4. MUSIC Model Layout As the management of urban stormwater needs to take a holistic approach, specific management measures need to be implemented in series to form a treatment train. The correct utilisation of various devices within the treatment train is imperative to target the desired pollutants, from the gross solids to the fine colloidal partials. Figure 3-2 shows the MUSIC model layout for the development. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 25
Section 27
Figure 3-2: MUSIC Model Layout 3.3. Treatment Measures Runoff from the development will be treated through a bioretention basins. The locality of the treatment devices servicing the development is shown in Figure 3-1. 3.3.1. Bioretention System Bioretention systems use ponding above a treatment surface to maximise the volume of runoff flowing through the filtration media. They typically convey flows above the design event through overflow pits or a weir. The treatment system operates by firstly filtering surface flows through surface vegetation and then percolating runoff through prescribed filtration media. This media provides treatment through fine filtration, extended detention and biological uptake of nutrients. As these systems take approximately 12-24hrs to drain, the maximum depth of pondage allowed to occur over the filter area has been limited to 300mm, with a minimum filter media depth of 500mm. Table 3-5 summarises the proposed design parameters for the main bioretention system for this development, and highlights the size of the existing bioretention basin approved as part of 25 Pavilion Street, along with the upgraded size to account for the additional development from 33 Pavilion Street . As noted above this may be split into several devices on detailed design. It is to be noted that the Orthophosphate content of the filter media has been reduced to 30mg/kg in line with recent advice from Healthy Waterways. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 26
Section 28
Table 3-5: Bioretention Design Parameters
Parameter Existing Basin Upgraded Basin
Extended Detention Depth (m) 0.30 0.30
Storage Surface Area (m2) 80 130
2
Filter Media Area (m ) 80 130
Unlined Filter Media Perimeter (m) 0.01 0.01
Saturated Hydraulic Conductivity (mm/hr) 200 200
Filter Depth (m) 0.5 0.5
TN Content of Filter Media (mg/kg) 400 400
Orthophosphate Content of Filter Media (mg/kg) 30 30
Exfiltration Rate (mm/hr) 0.0 0.0
Overflow Weir (m) 2 2
3.3.2. Sediment Forebays
To ensure that the deposition of coarse sediment on the filter media surface does not affect its function,
bioretention systems should be designed with pre-treatment to limit the amount of coarse sediment
reaching the filter media. The sediment forebay has been sized in accordance with the WaterByDesign’s
Bioretention Technical Design Guideline. Table 3-6 summarises the proposed design parameters for the
proposed sediment forebay.
Table 3-6: Sediment Forebay Design Parameters
Parameter Value
Site Catchment (ha) 2.645
Min Area of Forebay (m2) 26
Removal Efficiency (%) 80
3.4. Results
MUSIC modelling of the proposed treatment train for the developable area of the development at 25
Pavilion Street, Pomona was performed to ensure the WQO’s were achieved. Table 3-7 presents the load-
based outputs that are represented by this application. As the bioretention basin is treating an external
catchment, the loads generated from the external catchment have been subtracted from the mitigated
loads. The results show the mitigated scenario, which achieves compliant load reductions set out within the
NSC Planning Scheme. Calculations for mitigated loads are shown in Table 3-8.
Table 3-7: MUSIC Results – Load Based Pollutant Outputs
Mitigated
Unmitigated (Less External Reduction Target
Pollutant Compliance
(kg/yr) Catchment) Achieved (%) Reduction
(kg/yr)
TSS 4,650 900 81 80%
TP 9.29 2.38 74 60%
TN 51.6 24.5 53 45%
GP 332 0 100 90%
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 27
Section 29
Table 3-8: MUSIC Results – Portion of total pollutant loads for External Catchment and Site
Total Model Residual External Catchment Site – Mitigated load (less
Pollutant
load (kg/yr) Source Load (kg/yr) external catchment) (kg/yr)
TSS 2190 1290 900
TP 5.3 3.0 2.4
TN 43.5 19.0 24.5
GP 0 153 0
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 28
Section 30
4. CONSTRUCTION PHASE
MANAGEMENT
4.1. Erosion and Sediment Control
The management of the site during the construction phase is an important step in ensuring water quality
standards are achieved. Implementation of best practice Erosion and Sediment Control techniques is
imperative to managing the quality of runoff affected by construction works.
The following points provide general guidance on the management of stormwater during the construction
phase. Detailed Erosion and Sediment Control Management Plans should be developed in conjunction with
the Operational Works design prior to construction works commencing in accordance with the International
Erosion Control Association (IECA) - “Best Practice Erosion and Sediment Control (BPESC) document” and
overseen by a Certified Professional in Erosion and Sediment Control (CPESC) or Registered Professional
Engineer Queensland (RPEQ).
1. Establish a single stabilised entry/exit point for the site works;
2. Construct a shake-down grid at the entrance to facilitate the removal of sediment from trucks leaving
the site. The access road extending from the end of existing road or kerb to the grid should comprise
a 150-200mm deep pad of 40mm crushed rock;
3. Install sediment fences along the lower boundaries of the site;
4. Construct one or more strategically placed sediment basins in the proposed drainage reserve and
construct contour drains / bunds to direct disturbed runoff to the sediment basins;
5. Install bins and/or wind-proof litter areas on-site to minimise the dispersion of gross pollutants;
6. Maintain on site sufficient materials necessary for the emergency repair of all erosion control
devices. This includes silt fences, clean crushed rock for reapplication to the entrance road and for
replacement of rock within temporary drainage channels, and flocculants for settling sediment
basins;
7. Following each day’s construction works, ensure that any material on road surfaces is swept from
the road, and not permitted to be washed down the gutters and piped drainage systems;
8. Quality of pooled water within sediment basins are to be monitored prior to dewatering, sufficient
time should be given to allow sediment to settle (possible with the assistance of a suitable flocculent
if necessary) &/or filtering during pumping operations; and
9. Final establishment of bioretention basin should not occur until full stabilisation of upstream
catchment has occurred; preferably these should be temporarily turfed during the maintenance
period while dwelling construction is occurring.
It shall be the responsibility of the developer, through their principal contractor, to ensure that temporary
sediment and erosion controls are installed and maintained correctly.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 29
Section 31
5. ESTABLISHMENT AND OPERATIONAL
PHASE MANAGEMENT
5.1. Establishment
Experience shows that the critical periods in the life of WSUD vegetated stormwater systems are the
construction and establishment phases. The timing and approach to these systems must be carefully
considered to ensure successful establishment and long-term performance. Bioretention systems are now
common stormwater treatment devices for new urban developments in Queensland. Successful
construction and allowing adequate time for the systems to establish is critical to their long-term
performance and function. Construction of the system is also linked to having suitable bioretention designs
in place to ensure, civil contractors have appropriate plans to construct to. Applying due care in the design
and construction phase will ensure the function of the system whilst also keeping on-going maintenance to
a minimum. It is highly recommended that the constructed activities be completed in accordance with the
Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Apr 2010). This will
require a sacrificial turf layer to be installed to protect the filter media from the building phase.
5.2. Operational
It is not proposed for water quality monitoring of the bioretention system to be undertaken during the
operational phase of its life. The “Maintaining Vegetated Asset” guideline highlights that water quality
monitoring is not recommended to determine the performance of every vegetated stormwater asset, as it
is a specialized field that is complex and costly. In line with this guideline the on-going monitoring of water
quality from this device is not considered necessary considering the small size of the development.
The bioretention system will be maintained by the NSC, who as the asset custodian, will be responsible for
the on-going maintenance of the water quality device. Maintenance for the bioretention basin may involve
the following:
1. Scheduled inspections;
2. Removal of noxious plants or weeds;
3. Maintaining the desired vegetation;
4. Repairing erosion;
5. Unblocking inlets and outlets;
6. Removing litter and debris;
7. Managing algal or moss growth; and
8. Maintaining the permeability of the filtration.
Operations and maintenance should be conducted in accordance with the Maintaining Vegetated Stormwater
Assets (Feb 2012) guideline.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 30
Section 32
6. CONCLUSION
Colliers Engineering and Design have been engaged by PSP Developments Pty Ltd to prepare a Stormwater
Management Plan (SMP) in support of a development application to Noosa Shire Council (NSC) over land
located at 33 Pavilion Street, Pomona (Lot 4 RP809059). This development application seeks a development
permit for a Reconfiguration a Lot (ROL) to create 8 residential lots. The site has an existing building at Lot 1
and no works are required to create lot 1.
It can be seen from the results, presented in Table 3-7 that the treatment measures proposed for the
development site achieve the performance criteria set by the NSC Planning Scheme (2020) and SPP (July
2017). Annual Load Reductions of Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen (TN)
and Gross Pollutants (GP) between the Mitigated and Unmitigated Scenarios have been achieved through
the upgrade of the existing bioretention basin from 80m2 to 130m2.
It has been demonstrated that non-worsening of peak flows has been achieved to the discharge point for
events up to the 1% AEP event (refer Table 2-8). The results show that there is non-worsening for events up
the 1% AEP. The intent of sizing the detention basin is to mitigate flows up to the 10% AEP storm event to
ensure non-worsening of discharges into the downstream flow path. In larger events, flows from the site
will start to sheet flow across the rear of the site to Cooroora Creek. As the discharge point for the site
becomes inundated from Cooroora Creek flooding in the major storm event, it is considered non-worsening
has been achieved. The catchment size of Cooroora Creek reporting past the site is approximately 1,400 ha
and it is considered that no quantifiable change to downstream flooding conditions would result.
This plan demonstrates that effective treatment of stormwater at the proposed development can be
achieved through the integration of Water Sensitive Urban Design (WSUD) principles. Through the
incorporation of bioretention basins, the plan successfully demonstrates:
Compliance with the requirements of the NSC Planning Scheme and SPPs Load Based Objectives;
The end of line bioretention basin is upgraded to 130m2 to cater for the proposed development.
Ecological sustainability in terms of the development’s impact upon receiving waters and the viability of
the proposed site development.
Non-worsening of peak flows is achieved through the upgrade of the existing basin.
The development is located above the regional 1% (2100 AEP flood extent with 500mm freeboard
recommended to future dwellings on the new allotments.
We therefore request Council approval of the engineering components for the proposed development with
reasonable and relevant conditions. Detailed design may result in changes to the proposed strategy;
however, the design objectives will be maintained.
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 31
Section 33
7. REFERENCES
Noosa Shire Council (NSC) Planning Scheme 2020;
http://www.bom.gov.au/water/designRainfalls/revised-ifd (Bureau of Meteorology, Online Rainfall IFD
Data System);
State Planning Policy (Department of Infrastructure, Local Government and Planning, 2017);
Australian Rainfall and Runoff (Institute of Engineers Australia, 2019);
Queensland Urban Drainage Manual – 4th Edition (Institute of Public Works Engineering Australasia,
Queensland Division, 2017);
MUSIC Modelling Guidelines Version 1.0 (Water by Design, 2010);
Maintaining Vegetated Stormwater Assets (Water by Design, 2012); and
Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
Design 2012).
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 32
Section 34
Appendices
Reconfiguration of Lot Plan and Concept Engineering
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 35
PSP Developments
Pty Ltd
Proposal Plan
33 Pavilion Street,
Pomona
Lot 4 on RP809059
7
1001m²
Road
8 6
2.333ha
1001m²
²
e
15m Wid
STAGE 24
1033m² 5
1284m²
3
1042m²
601
284m²
2 1
1085m² 1661m²
STAGE 1
A3 1:1500
13285-PRO-01L
Section 36
LEGEND
EXISTING CONTOURS (0.5m INTERVALS)
ENANT
EXIST
N COV
1:3
84 PROPOSED CONTOURS (0.5m INTERVALS)
1:3
ETATIO
IDE VEG EXISTING KERB & CHANNEL
10m W
EXISTING DRAINAGE
85
S EXISTING SEWER
A DAM CONTAINING NO MORE THAN 500m³ MAY BE W EXISTING WATER
INSTALLED TO LOT 8 OUTSIDE OF THE COVENANT AREAS
PROPOSED KERB & CHANNEL
600
601 8 PROPOSED STORMWATER DRAINAGE
SP324164 R PROPOSED ROOFWATER DRAINAGE
SEDIMENT FOREBAY
S PROPOSED SEWER
ADDITIONAL 1:4 1:3 AN AREA OF SHALLOW CUT IS TO BE PROVIDED WITHIN THE FLOODPLAIN IN LOT 8,
BIORETENTION W PROPOSED WATER
AREA TYP PRE-DEVELOPED FLOOD EXTENT. CLEAR OF THE VEGETATION COVENANTS, TO OFFSET THE LOSS OF FLOODPLAIN
REFER STORMWATER MANAGEMENT PLAN STORAGE. REFER STORMWATER MANAGEMENT PLAN (BY OTHERS). PROPOSED TOP OF BATTER
(BY OTHERS) PROPOSED TOE OF BATTER
PROPOSED RETAINING WALL
H1.0 PROPOSED RETAINING WALL HEIGHT
PROPOSED ROAD PAVEMENT
86
PROPOSED CONCRETE PATHWAY
SC
STAGE 3 TOE OF BATTER PROPOSED CONCRETE DRIVEWAY
S
1:2
PROPOSED EARTHWORKS
W
AUGMENTATION OF EXISTING CUT FILL
BIORETENTION/DETENTION BASIN & WEIR PER STAGE 2 TOE OF BATTER
S
STORMWATER MANAGEMENT PLAN (BY OTHERS) 1:4
NOM STAGING
W
1:2 STAGE 1 : LOT 1
STAGE 2 : LOTS 2-7 & 601
S
6 STAGE 3 : LOT 8
SP324164
W
JOIN NEW FOOTPATH & BATTER SLOPE MANAGEMENT
ROAD NEATLY TO EXISTING CONNECT TO EXISTING SEWER
S
< 1 : 4 SLOPES SHALL BE GRASSED
LOT 8 1 : 3 SLOPES SHALL BE PLANTED*
CT177.313
CT204.384
1:100
NOM
TC211.65
W
BUILDING PLATFORM 1 : 2 SLOPES SHALL CONSIST OF LEVEL 1 FILL WITH PLANTING*
1:4
87 (800m²)
280
180
* PLANTING DETAILS TO BE DETERMINED DURING OPW PHASE
183
190
200
S
210
CT232.48
87
TC239.751
3
220
W
230
250
260
270
290
294
300
310
3
S S S S S S S
S
S W
S
S
S S
W
S
S
S S
EARTHWORKS TO BE WHOLLY WITHIN THE SUBJECT SITE (TYP)
TYP TYP
2m WIDE CONCRETE PATH
3%
1:4
4
S
SC
3%
SP179876
S
W
S
SC
S
H RELOCATED D4-5 HAZARD BOARD FROM END OF EXISTING ROAD
W W W W W 0.5%
W S
SC
S
S
W
W
W
W W S
W S S S S S S S S S S S S
H R H
TAKE UP & RELOCATE EXISTING D4-5 W W W W W W W W W W W W W TERMINATE WATER MAIN FOR POTENTIAL FUTURE CONNECTION AS PER SEQ CODE
HAZARD BOARD TO END OF NEW
ROAD EXTENSION
W
W W W W
H0.0 H1.3 H1.0
S
W
CONNECT TO EXISTING WATER MAIN. EXISTING SEWER HCB (TYP) WATER PROPERTY 4m WIDE CONCRETE DRIVEWAY AS PER NSC STD DRGS RS-049 & RS-050.
R
HYDRANT TO BE RETAINED. USE EXISTING TAPPING CONNECTION (TYP) REFER DRG SK102 FOR SWEPT PATH.
BAND FOR NEW LOT 3 PROPERTY SERVICE. H1.6
W W
S
TURNING FACILITY.
REFER DRG SK102 FOR SWEPT PATH.
R
7 COMBINED RETAINING WALL / BATTER INTERFACE TO OPTIMISE
W
SP324164
88 LOT USAGE AND CONTAIN WORKS WITHIN THE SUBJECT LOT.
S
LOCAL ROAD PER NOOSA COUNCIL PLANNING SCHEME FINAL CONFIGURATION TO BE DETERMINED DURING OPW PHASE.
6m WIDE (K-K) : TYPE M1 K&C
R
PLACE
W
1:100
1:100
1:100
1:100
1:100
NOM
NOM
NOM
NOM
NOM
S
R
W
6 7
MAJESTIC
S
R
88 88
S S
H0.0
2 3 H0.0
4
R
3m WIDE CONC. ACCESS FOR LOT 5
W
89
S
R
89 INTERIM 1.5m STORMWATER EASEMENT (STAGE 1)
89
TO BE EXTINGUISHED IN STAGE 2
R
90
W
S
COMBINED RETAINING WALL / BATTER INTERFACE TO OPTIMISE
J:\2023\23539SD2_33 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\1.RAL\#23539_CI_RAL.dwg
8 LOT USAGE AND CONTAIN WORKS WITHIN THE SUBJECT LOT.
90 SP324164 FINAL CONFIGURATION TO BE DETERMINED DURING OPW PHASE.
NOM
R
1:4
NOM
90
1:4
W
S
H0.0
H1.4
91
R
PROVIDE DN150 STUB TO THE BOUNDARY TO
1:3* MAX
VARIES
W
S
91
AFFORD #35 PAVILION STREET PROVISION FOR
ROOFWATER CONNECTION. FUTURE PIT BY OTHERS. 0 4 8 12 m
NOM
NOM
91
1:3
1:3
R
REFER DRAWING 23539-SK102 FOR CONTINUATION
COPYRIGHT © Associated Consultants Client Drawn Verified Section 37
Project Drawing Title Scale Sheet Size
JF DR
This drawing is subject to
copyright in accordance with
SURVEYORS & PLANNERS PSP DEVELOPMENTS P/L 'POMONA 33' : RESIDENTIAL DEVELOPMENT ENGINEERING PLAN 1 : 250 U.N.O. A1
the agreement between TOD LAND SURVEYING DYNAMICS (LSD) Designed Verified
Consulting Pty Ltd (tc) and tc's
p 0412 666 516 JF DR 33 PAVILION ST, POMONA SHEET 1 OF 2 Drawing Number
client. This drawing shall only
be used for this specific project. e [email protected] Approved RPEQ No RP DESCRIPTION 4 / RP809059 23539-SK101
This drawing shall not be used w www.landsurveyingdynamics.com Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 LOCAL AUTHORITY NOOSA COUNCIL
B 06.10.23 RAL23/0013 IR RESPONSE JF MCU APPROVAL - HORIZ DATUM MGA 2020 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 Signed
A 18.07.23 ORIGINAL ISSUE JF [email protected] www.todconsulting.com ROL APPROVAL - VERT DATUM AHD
'Issued For Construction' in the
revision description. Rev Date Revision Description Drawn ABN 39 128 805 336 OPW APPROVAL - RL DATUM - MEASUREMENT BAR - INCREMENTS IN mm B
Section 38
MAJESTI
REFER DRAWING 23539-SK101 FOR CONTINUATION
2 3 4 6 7
R
3m WIDE CONC. ACCESS FOR LOT 5
W
89
LEGEND
S
EXISTING CONTOURS (0.5m INTERVALS)
R
89 INTERIM 1.5m STORMWATER EASEMENT (STAGE 1) PROPOSED CONTOURS (0.5m INTERVALS)
89
TO BE EXTINGUISHED IN STAGE 2
EXISTING KERB & CHANNEL
EXISTING DRAINAGE
R
90 S EXISTING SEWER
W
S
COMBINED RETAINING WALL / BATTER INTERFACE TO OPTIMISE W EXISTING WATER
8 LOT USAGE AND CONTAIN WORKS WITHIN THE SUBJECT LOT.
PROPOSED KERB & CHANNEL
90 SP324164 FINAL CONFIGURATION TO BE DETERMINED DURING OPW PHASE.
NOM
R
PROPOSED STORMWATER DRAINAGE
1:4
NOM
90
1:4
W
S
R PROPOSED ROOFWATER DRAINAGE
H0.0
H1.4
S PROPOSED SEWER
91 W PROPOSED WATER
R
PROVIDE DN150 STUB TO THE BOUNDARY TO
1:3* MAX
PROPOSED TOP OF BATTER
VARIES
W
S
AFFORD #35 PAVILION STREET PROVISION FOR
91 PROPOSED TOE OF BATTER
ROOFWATER CONNECTION. FUTURE PIT BY OTHERS.
NOM
NOM
91
1:3
1:3
PROPOSED RETAINING WALL
R
W H1.0 PROPOSED RETAINING WALL HEIGHT
S
92 PROPOSED ROAD PAVEMENT
SC H0.0
R R H1.3 PROPOSED CONCRETE PATHWAY
SC R
R
R PROPOSED CONCRETE DRIVEWAY
S 92 S S S S S
92 S PROPOSED EARTHWORKS
W
VARIES CUT FILL
R
S
93 1:7 MAX
STAGING
W
R
93 STAGE 1 : LOT 1
S
93
H0.0 STAGE 2 : LOTS 2-7 & 601
H0.0 STAGE 3 : LOT 8
1:100
NOM
W
R
BATTER SLOPE MANAGEMENT
5
94
S
EXISTING (#35)
VARIES < 1 : 4 SLOPES SHALL BE GRASSED
DWELLING TO 3
R
W
94
94
BE RETAINED
1:4 MAX
RP809059 1 : 3 SLOPES SHALL BE PLANTED*
1 : 2 SLOPES SHALL CONSIST OF LEVEL 1 FILL WITH PLANTING*
1
S
9 * PLANTING DETAILS TO BE DETERMINED DURING OPW PHASE
R
SP324164
W
95
S H1.3
R
95 95
2
W
NOM
1:3
LOT 5 RP864877
EXISTING SEWER AND WATER
S
H0.0
R
CONNECTIONS SERVICING LOT 1
TO BE RETAINED
W
96
PLACE
7m
R
S
96 96
2
W
S S S S S
ENTRY MANOEUVRE 3
MAJESTIC
PROVIDE DN150 STUB TO THE BOUNDARY TO AFFORD
#29 & #31 PAVILION ST PROVISION FOR ROOFWATER EXIT MANOEUVRE
CONNECTION. FUTURE PITS BY OTHERS.
W
97 97
W
1
LOT 6 LOT 7
EXISTING ACCESS TO LOT 1 TO BE RETAINED
W
LOT 1 ACCESS VEHICLE SWEPT PATH LOT 7 ACCESS VEHICLE SWEPT PATH
(#29) (#31) STANDARDS AUSTRALIA B99 VEHICLE SCALE 1:200 STANDARDS AUSTRALIA B99 VEHICLE (FWD-IN : REV-OUT) SCALE 1:200
EMT A RP809059
98 98 6 5
W
(#27A) RP809059 RP809059
1 (#37)
RP189023 2 1 4 3
RP809059 RP154922 2
RP864877 RP864877
W
CONSTRUCT 4m x 0.9m CONCRETE
BIN PAD IN FAVOUR OF LOTS 6 & 7
W
99 99
1
W
3
J:\2023\23539SD2_33 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\1.RAL\#23539_CI_RAL.dwg
W
100 100
LOT 4 LOT 5 LOT 6 LOT 7
PAVILION STREET
TURNING FACILITY VEHICLE SWEPT PATH
STANDARDS AUSTRALIA MEDIUM RIGID VEHICLE (3-POINT TURN) SCALE 1:200
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
JF DR
This drawing is subject to
copyright in accordance with
SURVEYORS & PLANNERS PSP DEVELOPMENTS P/L 'POMONA 33' : RESIDENTIAL DEVELOPMENT ENGINEERING PLAN 1 : 250 U.N.O. A1
the agreement between TOD LAND SURVEYING DYNAMICS (LSD) Designed Verified
Consulting Pty Ltd (tc) and tc's
p 0412 666 516 JF DR 33 PAVILION ST, POMONA SHEET 2 OF 2 Drawing Number
client. This drawing shall only
be used for this specific project. e [email protected] Approved RPEQ No RP DESCRIPTION 4 / RP809059 23539-SK102
This drawing shall not be used w www.landsurveyingdynamics.com Noosa: 07 5449 9600 Sunshine Coast: 07 5329 3190 LOCAL AUTHORITY NOOSA COUNCIL
B 06.10.23 RAL23/0013 IR RESPONSE JF MCU APPROVAL - HORIZ DATUM MGA 2020 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 Signed
A 18.07.23 ORIGINAL ISSUE JF [email protected] www.todconsulting.com ROL APPROVAL - VERT DATUM AHD
'Issued For Construction' in the
revision description. Rev Date Revision Description Drawn ABN 39 128 805 336 OPW APPROVAL - RL DATUM - MEASUREMENT BAR - INCREMENTS IN mm B
Section 39
Rational Method and WBNM Output 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 40
Project Name: 33 Pavilion St Col Fi sy Project No.: 23-0167 Author: L Gillis be Date: 04/10/2023 ARR: ARR2016 RATIONAL METHOD SUMMARY & RAINFALL DATA 10 15 20 25 30 45 60.00 90.00 120.00 180.00 270.00 360.00 540.00 720.00 1080.00 1440.00 1800.00 2160.00 2880.00 4320.00 1 1.0075669| 0.6553598 | 0.22487336 | -0.113584 | 0.0190669 | -0.001362 | 3.423E-05 2 1.1258065 | 0.6506015| 0.2318719 | -0.117139 | 0.0198273 | -0.001428 | 3.616E-05 5 1.424489 | 0.6620312| 0.222184 | -0.115032 | 0.0197897 | -0.001441 | 3.667E-05 10 1.5850968 | 0.6825591| 0.20021482 | -0.10711 | 0.0185666| -0.001353 | 3.418E-05 20 5% | 1.7200166| 0.7080383| 0.17219149 | -0.096592 | 0.0168551| -0.001224 | 3.048E-05 50 2% | 1.8736345| 0.7649483| 0.10527054 | -0.068783 | 0.0116344| -0.000762| 1.48E-05 100 1% 1.976603 | 0.8128499 | 0.048541624| -0.044997 | 0.0071252| -0.000359 | 1.091E-06 Catchment Data Details: Variable | Value Units Exisiting Scenario - SUB3 Area: 1.78 ha fi 0.21 fraction Cio 0.55 fraction Rational Method Summary: Overland flow time (min) 20.60 Pipe flow time (min) Adopted Time of Concentration (tc) (min) 20.6 Duration (hours) 0.3 Freq Factor 0.80 0.85 1.05 1.15 1.20 Duration (hours) 20.60 20.60 20.60 20.60 20.60 Duration (min) 0.34 0.34 0.34 0.34 0.34 Intensity (mm/hr) 70.15, 78.92 142.26 165.46 183.04 Discharge (m°/s) 0.1536 | 0.1837 0.4089 0.5209 | 0.6013
Section 41
SUMMARY OF RESULTS E05 RESULTS % AEP 1 0.52 0.97 1.35 1.64 1.81 1.83 1.86 1.76 1.69 1.59 1.38 1.57 1.86 2 0.40 0.69 1.01 1.28 1.45 1.51 1.55 1.49 1.43 1.34 1.16 1.32 1.55 5 0.30 0.37 0.59 0.78 0.95 1.13 1.13 1.16 1.21 1.12 1.09 1.05 1.21 10 0.24 0.25 0.31 0.44 0.58 0.78 0.84 0.87 0.92 0.88 0.84 0.80 0.92 20 0.20 0.21 0.20 0.21 0.28 0.49 0.60 0.72 0.67 0.67 0.68 0.59 0.72 50 0.15 0.15 0.15 0.15 0.15 0.13 0.17 0.32 0.36 0.36 0.43 0.36 0.43 63.2 0.13 0.13 0.13 0.13 0.13 0.11 0.11 0.17 0.24 0.27 0.33 0.29 0.33 1% CC 0.98 1.68 2.13 2.45 2.57 2.49 2.45 2.29 2.16 2.04 1.77 2.02 2.57 DO5 Results % AEP 1 0.75 1.20 1.51 1.75 1.83 1.89 1.85 1.74 1.65 1.53 1.35 1.55 1.89 2 0.59 0.95 1.22 1.43 1.51 1.58 1.56 1.48 1.40 1.30 1.14 1.31 1.58 5 0.48 0.65 0.86 0.99 1.10 1.22 1.16 1.16 1.20 1.11 1.08 1.04 1.22 10 0.39 0.48 0.60 0.70 0.78 0.90 0.89 0.90 0.94 0.89 0.84 0.80 0.94 20 0.33 0.40 0.43 0.47 0.52 0.61 0.67 0.73 0.67 0.71 0.69 0.60 0.73 50 0.23 0.28 0.31 0.32 0.32 0.29 0.31 0.38 0.38 0.40 0.43 0.36 0.43 63.2 0.20 0.24 0.27 0.28 0.28 0.26 0.25 0.25 0.28 0.30 0.34 0.29 0.34 1% CC 1.17 1.80 2.19 2.48 2.52 2.52 2.42 2.25 2.10 1.96 1.73 1.98 2.52 Mitigated Results NTA Max WSL (m) 1 0.59 0.93 1.27 1.53 1.66 1.82 1.77 1.68 1.58 1.43 1.28 1.46 1.82 0.39 2 0.49 0.72 0.96 1.19 1.30 1.49 1.46 1.40 1.29 1.15 1.04 1.21 1.49 0.39 5 0.42 0.53 0.68 0.79 0.87 1.02 1.04 1.00 1.03 1.00 0.97 0.92 1.04 0.39 10 0.37 0.42 0.51 0.60 0.67 0.78 0.78 0.78 0.82 0.80 0.75 0.72 0.82 0.39 20 0.33 0.38 0.40 0.43 0.48 0.57 0.62 0.65 0.62 0.66 0.64 0.58 0.66 0.20 50 0.23 0.29 0.31 0.32 0.32 0.29 0.31 0.37 0.38 0.40 0.43 0.36 0.43 0.04 63.2 0.20 0.25 0.27 0.28 0.28 0.26 0.25 0.25 0.28 0.30 0.34 0.29 0.34 0.02 1% CC 0.91 1.53 1.96 2.28 2.38 2.46 2.35 2.20 2.06 1.89 1.69 1.92 2.46 0.78 1% Blocked 0.81 1% CC Blocked 0.89 Difference 1% AEP 0.07 -0.04 -0.08 -0.11 -0.15 -0.01 -0.09 -0.08 -0.11 -0.16 -0.10 -0.11 0.07 1% AEP CC -0.07 -0.15 -0.17 -0.17 -0.18 -0.03 -0.09 -0.09 -0.11 -0.15 -0.08 -0.10 -0.03
Section 42
Comment#1/33 Pavilion Street
Comment#2] Existing (E05) IMPORT SAVE & RUN
Comment#3/ARR19 IL & CL CLEAR_ALL BROWSE
RESULTS_ONLY BROWSE
| DEFAULTS ] BROWSE
Lag Parameter (C) 1.6 Name 5% AEP 2% AEP 1% AEP 1% AEP CC Area BROWSE
Stream Lag Factor] 1 EX2 0.300 0.618 0.782 1.032 1.960
Calculation Timestep 1)}mins EX1 0.049 0.093 0.116 0.152 0.287
Initial Loss| 35/mm
Continuing Loss Rate} 2.4|mm/hr How TIPS PomonalFD
TOPOLOGY TIPS ARR
Subarea Name Connects_to Area_ha Imp_% Storm# AEP (ARI) Dura_mins | Subarea
1/EX2 SUB3 0.782 50 1 i 10
2/Ex1 SUB1 0.116 50 2 zl 15
3/SUB3 SUB4 2.085 21 3 Hl 20 Diverts to Sub
4|SUB1 SUB2 2.079 11 4 Hl 25 Crest Elev [m]
5|SUB2 SUB4 1.354 5 5 Hl 30 Length [m]
6|SUB4 SINK 0.511 5 6 Hl 45 Weir Coeff
7 7 1 60 D_Fact
8 8 1 90 Directed to
9 9 1 120 Delay [mins]
10 10 Hl 180
11 11 Hl 270
12 12 Hl 360
SINK
1 2 3 4 5 6 7 8 9 10
Structure Averages 1 AEP 10 mins 1 AEP 15 mins 1AEP 20 mins 1 AEP 25 mins 1 AEP 30 mir1 AEP 45 mins 1 AEP 60 mins 1AEP90 mins 1 AEP 120 m1 AEP 180 mins
EX2 0.27 0.3048 0.2993 0.3166 0.3312 0.3016 0.279 0.2517 0.2426 0.2134
Ex1 0.0441 0.0531 0.0511 0.0538 0.0546 0.0513 0.0456 0.0408 0.0388 0.0326
SUB3 0.4518 0.6537 0.7599 0.8396 0.9097 0.8312 0.8307 0.7793 0.7476 0.7033
SUB1 0.2051 0.4051 0.5189 0.5914 0.6634 0.6097 0.6211 0.5851 0.5643 0.5303
SUB2 0.1797 0.4291 0.6427 0.8053 0.9036 0.9166 0.9357 0.8906 0.858 0.8132
SUB4 0.5228 0.9721 1.3489 1.6429 1.8072 1.8262 1.8554 1.7579 = 1.6859 1.591
Structure_averages
Inflow Peak [m3/s]
Outflow Peak [m3/s]
Inflow Volume [m3]
Max Vol Stored [m3]
Max Water Elev [m]
RESULTS
10 15 20 25 30 45 60 90 120 180
1 0.5228 0.9721 1.3489 1.6429 1.8072 1.8262 1.8554 1.7579 = 1.6859 1.591
2 0.3953 0.6875 1.0064 1.278 1.4451 1.5126 1.5531 1.4897 1.4294 1.3434
5 0.3043 0.3675 0.5886 0.7792 0.9472 1.1269 1.1333 1.1632 1.2074 1.1232
10 0.2421 0.2465 0.3091 0.4414 0.5812 0.7763 0.8429 0.8745 0.9193 0.8814
20 0.2025 0.2085 0.2032 0.2148 0.2814 0.4883 0.5985 0.7204 0.6667 0.6693
50 0.1451 0.1518 0.1479 0.1485 0.1463 0.1296 0.1656 0.3238 0.3561 0.3639
63.2 0.127 0.1332 0.1302 0.1307 0.1287 0.1143 0.1093 0.1702 = 0.2431 0.2693
1% CC 0.9809 1.68 2.1314 2.4494 2.5659 2.4916 2.4494 2.293 2.1621 2.0411
WBNM_Run: C:\Projects (C drive)\33 Pavilion\001\wbnm2019_w64.exe
ARR2019 Gauge C:\Projects (C drive)\33 Pavilion\004 Layout Updates\PomonalFD.\ Note this must be in same location as runfile
ARR_Catchment: QLD_ARR_Datahub.txt
ARR_Patterns: QLD_ECnorth_Increments.csv
Note this must be in same location as runfile
Note this must be in same location as runfile
LAST_BUILD: C:\Projects (C drive)\33 Pavilion\004 Layout Updates\runfiles\005.wbn
11
1 AEP 270 mins
0.1827
0.0276
0.6063
0.4565
0.7026
1.3767
270
1.3767
1.1645
1.0876
0.8425
0.6807
0.4278
0.3317
1.7709
12
1 AEP 360 mins
0.2083
0.0314
0.6874
0.5166
0.7987
1.569
360
1.569
1.3229
1.0507
0.8005
0.5905
0.3565
0.2863
2.0186
Delay [mins]
MAX
Diverts to Sub
Invert [m]
No. Barrels
Ent. Type
Dia/(Width)[mm]
(Height)[mm]
Disch-Factor
Directed to
%Per to LS
%lmp to LS
Pipe#1 Pipe#2. Pipe#3 Elevation_m Storage_m3
1.8554
1.5531
1.2074
0.9193
0.7204
0.4278
0.3317
2.5659
Section 43
Comment#1/33 Pavilion Street
Comment#2|Developed (D05) IMPORT. SAVE & RUN
Comment#3/ARR19 IL & CL CLEAR_ALL BROWSE
RESULTS_ONLY BROWSE
| DEFAULTS ] BROWSE
Lag Parameter (C) 1.6 Name 5% AEP 2% AEP 1% AEP 1% AEP CC Area BROWSE
Stream Lag Factor] 1 EX2 0.300 0.618 0.782 1.032 1.960
Calculation Timestep 1)}mins EX1 0.049 0.093 0.116 0.152 0.287
Initial Loss| 35/mm
Continuing Loss Rate} 2.4|mm/hr How TIPS PomonalFD
TOPOLOGY TIPS ARR
Subarea Name Connects_to Area_ha Imp_% Storm# AEP (ARI) Dura_mins | Subarea
1/EX2 SUB3 0.782 50 1 i 10
2/Ex1 SUB1 0.116 50 2 zl 15
3/SUB3 SUB1 1.78 50 3 Hl 20 Diverts to Sub
4|SUB1 SUB2 2.079 50 4 Hl 25 Crest Elev [m]
5|SUB2 SUB4 1.354 5 5 Hl 30 Length [m]
6|SUB4 SINK 0.819 6.5 6 Hl 45 Weir Coeff
7 7 1 60 D_Fact
8 8 1 90 Directed to
9 9 1 120 Delay [mins]
10 10 Hl 180
11 11 Hl 270
12 12 Hl 360
SINK
1 2 3 4 5 6 7 8 9 10
Structure Averages 1 AEP 10 mins 1 AEP 15 mins 1AEP 20 mins 1 AEP 25 mins 1 AEP 30 mins 1 AEP 45 mins 1AEP 60 mins 1AEP90 mins 1 AEP 120111 AEP 180 mins
EX2 0.27 0.3048 0.2993 0.3166 0.3312 0.3016 0.279 0.2517 0.2426 0.2134
Ex1 0.0441 0.0531 0.0511 0.0538 0.0546 0.0513 0.0456 0.0408 0.0388 0.0326
SUB3 0.7164 0.8185 0.8424 0.8913 0.9315 0.8415 0.8095 0.7441 = -0.7137 0.6627
SUB1 1.092 1.3032 1.3911 1.4863 1.5422 1.4207 1.3868 1.2979 1.2349 1.1662
SUB2 0.837 1.2355 1.4905 1.6897 1.7317 1.714 1.6838 1.5783 1.4912 1.404
SUB4 0.745 1.1968 1.5099 1.7534 1.8313 1.8869 1.8492 1.7418 1.6464 1.533
Structure_averages
Inflow Peak [m3/s]
Outflow Peak [m3/s]
Inflow Volume [m3]
Max Vol Stored [m3]
Max Water Elev [m]
DOS Results
10 15 20 25 30 45 60 90 120 180
1 0.745 1.1968 1.5099 1.7534 1.8313 1.8869 1.8492 1.7418 1.6464 1.533
2 0.593 0.95 1.2161 1.4339 1.5112 1.581 1.5628 1.482 1.4027 1.3002
5 0.4773 0.6458 0.8553 0.9881 1.0999 1.2208 1.1616 1.1648 = 1.1994 1.1141
10 0.3932 0.4807 0.5952 0.6954 0.7837 0.9013 0.8893 0.9028 0.9377 0.8856
20 0.3253 0.4016 0.4345 0.4689 0.5236 0.6083 0.671 0.727 ~—-0.6702 0.7067
50 0.226 0.2833 0.3083 0.3162 0.3178 0.2932 0.3067 0.375 0.3786 0.3975
63.2 0.1953 0.2446 0.2687 0.2769 0.2779 0.2568 0.2471 0.2549 0.2779 0.3044
1% CC 1.1724 1.7951 2.187 2.4777 2.5173 2.5238 2.4187 2.2471 2.1007 1.9562
WBNM_Run: C:\Projects (C drive)\33 Pavilion\001\wbnm2019_w64.exe
ARR2019 Gauge C:\Projects (C drive)\33 Pavilion\004 Layout Updates\PomonalFD.csv Note this must be in same location as runfile
ARR_Catchment: QLD_ARR_Datahub.txt
ARR_Patterns: QLD_ECnorth_Increments.csv
LAST_BUILD: C:\Projects (C drive)\33 Pavilion\004 Layout Updates\runfiles\004.wbn
11
1 AEP 270 mins
0.1827
0.0276
0.5694
1.0093
1.2272
1.3517
270
1.3517
1.1415
1.075
0.8442
0.6887
0.4338
0.3436
1.728
12
1 AEP 360 mins
0.2083
0.0314
0.6485
1.1442
1.3992
1.5457
360 MAX
1.5457
1.3089
1.0379
0.8049
0.5958
0.3646
0.2948
1.9757
Diverts to Sub
Invert [m]
No. Barrels
Ent. Type
Dia/(Width)[mm]
(Height)[mm]
Disch-Factor
Directed to
Delay [mins]
Note this must be in same location as runfile
Note this must be in same location as runfile
%Per to LS
%lmp to LS
Pipe#1. Pipe#2. Pipe#3 Elevation_m Storage_m3
1.8869
1.581
1.2208
0.9377
0.727
0.4338
0.3436
2.5238
Section 44
Comment#1]33 Pavilion Street Commenti#2|Mitigated (M05) IMPORT SAVE & RUN Comment#3]ARR19 IL & CL CLEAR_ALL BROWSE WBNM_Run: C:\Projects (C drive)\33 Pavilion\001\wbnm2019_w64.exe RESULTS_ONLY BROWSE ARR2019 Gauge C:\Projects (C drive)\33 Pavilion\004 Layout Updates\PomonalFD.csv Note this must be in same location as runfile [[veraucs_] BROWSE ARR_Catchment: QLD_ARR_Datahub.txt Note this must be in same location as runfile Lag Parameter (C) 1.6 Name 5% AEP 2% AEP 1% AEP 1% AEP CC Area BROWSE ARR_Patterns: QLD_ECnorth_Increments.csv Note this must be in same location as runfile Stream Lag Factor] 1 EX2 0.300 0.618 0.782 1.032 1.960 LAST_BUILD: C:\Projects (C drive)\33 Pavilion\004 Layout Updates\runfiles\005.wbn Calculation Timestep| 1}mins EX1 0.049 0.093 0.116 0.152 0.287 Initial Loss} 35/mm Continuing Loss Rate| 2.4|mm/hr He TIPS PomonalFD TOPOLOGY | TIPS aE Name Connects to Area_ha Imp_% Storm# ‘AEP (ARI) = IWL D-Fact Type %PertolS %lmp to LS A/EX2 SUB3 0.782 50 1 1 SUB1 0 1 OUTLET 2/Ex1 SUB1 0.116 50 2 1 Weir Weirl2 a Pipef1 Pipe#2 Pipe#3 Elevation_m Storage_m3 RL 3|SUB3. SUB1 1.78 50 3 1 Diverts to Sub SUB2 Diverts to Sub SUB2 SUB2 -0.9 0 84.4 4\SUB1 ISUB2 2.079 50 4 1 Crest Elev [m] 0.6 Invert [m] 0 -0.9 0 0 85.3 5|SUB2 ISUB4 1.354 5 5 1 Length [m] 8 No. Barrels 0 0 0.3 116.7 85.6 6|SUB4 SINK 0.819 6.5 6 1 Weir Coeff 1.6 Ent. Type 1 1 0.6 268 85.9 7 7 1 D_Fact 1 Dia/(Width)[mm] 450 450 0.9 458.1 86.2 8 8 1 Directed to TOP (Height)[mm] 0.97 508.3 86.27 9 9 1 120 Delay [mins] 0 Disch-Factor| 1 1 10 10 1 180 Directed to TOP TOP 11 11 1 270 Delay [mins] 0 0 12 12 1 360 SINK Elevation _|Freeboard RL 1% WSL 0.809 0.162 86.11 1%CC WSL 0.781 0.189 86.08 196Blocked Osi 0.159 86.11 i 2 3 4 5 6 7 8 9 10 11 12 1%CC Blocked 0.892 0.078 86.19 Structure Averages 1AEP10mins © 1AEP15 mins 1AEP20mins 1AEP 25 mins 1 AEP 30 mins 1 AEP 45 mins 1 AEP 60 mins 1AEP90 mins 1AEP 12011 AEP 180 mins 1 AEP 270 mins 1 AEP 360 mins Bund 0.970 86.27 EX2 0.27 0.3048 0.2993 0.3166 0.3312 0.3016 0.279 0.2517 0.2426 0.2134 0.1827 0.2083 Ext 0.0441 0.0531 0.0511 0.0538 0.0546 0.0513 0.0456 0.0408 0.0388 0.0326 0.0276 0.0314 SUB3 0.7164 0.8185 0.8424 0.8913 0.9315 0.8415 0.8095 0.7441 0.7137 0.6627 0.5694 0.6485 SUB1 0.8886 1.1944 1.3166 1.4336 1.4633 1.394 1.3601 1.2745 1.205 1.137 0.9905 1.1242 SUB2 0.5879 1.0481 1.3538 1.5811 1.6475 1.6819 1.651 1.552 1.4668 1.3679 1.2047 1.3771 SUB4 0.5163 0.9976 1.352 1.6183 1.7324 1.852 1.8026 1.7118 1.6168 1.4976 1.3303 1.5224 Structure_averages Inflow Peak [m3/s] 1.092 1.3032 1.3911 1.4863 1.5422 1.4207 1.3868 1.2979 1.2349 1.1662 1.0093 1.1442 Outflow Peak [m3/s] 0.8886 1.1944 1.3166 1.4336 1.4633 1.394 1.3601 1.2745 1.205 1.137 0.9905 1.1242 Inflow Volume [m3] 974.8 1461.9 1843.3 2154 2421.1 3067.7 3573.4 4379.9 5071 6209.9 7616.5 8826.2 Max Vol Stored [m3] 348.3 375.8 386.9 397.3 400.2 393.9 390.7 383.1 376.7 370.8 357.4 369.5 Max Water Elev [m] 0.7268 0.7702 0.7876 0.8045 0.8085 0.7989 0.794 0.7815 0.7719 0.762 0.7411 0.7603 Mitigated Results EVENT (% AEP) 10 15 20 25 30 45 60 90 120 180 270 360 MAX Max Water Elev [m] 1 0.5904 0.9308 1.2719 1.5347 1.661 1.8194 1.7702 1.6777 1.5808 1.4287 1.2779 1.4594 1.8194 0.8085 2 0.4927 0.7204 0.9557 1.1904 1.2975 1.4943 1.4609 1.4035 1.2873 1.153 1.0368 1.2106 1.4943 5 0.4242 0.532 0.6751 0.7879 0.8742 1.0227 1.0368 1.0047 1.0349 0.9998 0.9706 0.9206 1.0368 10 0.3731 0.4227 0.5087 0.5973 0.666 0.7812 0.7826 0.7824 0.8179 0.7971 0.7541 0.7198 0.8179 20 0.3254 0.3764 0.3962 0.4331 0.4849 0.5681 0.6179 0.6457 0.6202 0.6558 0.6367 0.575 0.6558 0.201 50 0.2318 0.2862 0.3091 0.3157 0.3169 0.2944 0.3074 0.3716 0.3765 0.3975 0.4309 0.3646 0.4309 0.041 63.2 0.2006 0.2484 0.2713 0.2781 0.2789 0.2576 0.2476 0.2549 0.2781 0.3044 0.3436 0.2948 0.3436 0.015 1% CC 0.9108 1.5348 1.9647 2.2772 2.3841 2.4626 2.3546 2.1994 2.0553 1.8887 1.6907 1.919 2.4626 0.7806 1% Blocked 0.811 1% CC Blocked 0.892 FSL EDD
Section 45
Existing Flood Map 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 46
LEGEND i" Site DCDB entities Noosa_2015_Lidar Flood Depth (m) . 1.5 0 DATE: 03/10/2023 CONSULTANT: CREATED BY: L. GILLIS J REVISION: B PAGESIZE: A3_ SCALE; /*!-500 Colliers STATUS: ISSUE COORDINATE SYSTEM: GDA 94 / MGA ZONE 56 PROJECT TITLE: 33 PAVILION STREET, POMONA - FLOOD INVESTIGATION PROJECTNO: = 23-0167 BIEN: FIGURE TITLE: FLOOD DEPTH MAP - EXISTING (E05) - 1% (2100) AEP FIGURE NO: APPENDIX C © PeakUrban
Section 47
Proposed Flood Map 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 48
LEGEND Flood depth (m) 1.5 DATE: 04/10/2023 CREATED BY: L. GILLIS REVISION: B PAGE SIZE: A3 SCALE: STATUS: ISSUE COORDINATE SYSTEM: GDA 94 / MGA ZONE 56 1:1,500 PROJECT TITLE: 33 PAVILION STREET, POMONA - FLOOD INVESTIGATION PROJECT NO: 23-0167 FIGURE TITLE; FLOOD DEPTH MAP - PROPOSED (P06) - 1% (2100) AEP FIGURE NO: APPENDIX D
Section 49
Appendix E Flood Afflux Map 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona
Section 50
LEGEND i" Site Layout — Lot boundaries --- Easement — Vegetation Covenant Noosa_2015_Lidar — 1 — 500 Afflux (m) Wl <-0.1 HM -0.075 to -0.1 MM -0.05 to -0.075 -0.025 to -0.05 -0.01 to -0.025 -0.025 -0.01 to 0.01 0.01 to 0.025 0.025 to 0.05 MP) 0.05 to 0.075 HM 0.075 to 0.1 Hl >0.1 !) Was Wet now Dry MN Was Dry now Wet ele SMa Lore 7 a Ly BATE: 04/10/2023 CONSULTANT: CREATED BY: _L, GILLIS NN j REVISION: B PAGE SIZE: A3 SCALE; !*!500 N Colliers STATUS: ISSUE COORDINATE SYSTEM: GDA 94 / MGA ZONE 56 PROJECT TITLE: 33 PAVILION STREET, POMONA - FLOOD INVESTIGATION PROJEGCNO: 23-0167 CLIENT: FIGURE TITLE: FLOOD AFFLUX MAP - PROPOSED (P06) VS EXISTING (E05) - 1% (2100) AEP FIGURE NO: APPENDDCE
Section 51
At Colliers,
we are
enterprising.
We maximise the potential of property to
accelerate the success of our clients and
our people.
Our expert advice to property occupiers, owners and investors
leads the industry into the future. We invest in relationships to
create enduring value. What sets us apart is not what we do,
but how we do it. Our people are passionate, take personal
responsibility and always do what’s right for our clients, people
and communities. We attract and develop industry leaders,
empowering them to think and act differently to drive
exceptional results. What’s more, our global reach maximizes
the potential of property, wherever our clients do business.
colliers.com.au
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona