Original source · versioned page text
Swmp Rfi
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
Item 23 / 24 Issue - Stormwater Quality It is unclear how compliance with the pollutant load reduction targets have been calculated. The development source node unmitigated loads should be factored by the required pollutant reduction percentages and then compared to the results from the model. It is unclear if this has been done. Information Request: 23. Provide a copy of the MUSIC model. 24. Provide further reporting of results which shows: the unmitigated loads from the development site(s) nodes only, the required load reductions (kg/yr) from the development site loads in order to meet the targets, and the mitigated results at the receiving node. Response: 24. Calculations for mitigated loads are shown in Table 3-8, demonstrating that the bioretention basin meets the target reductions for the development site. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.