Original source · versioned page text
Swmp Rfi
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
2.1.3. Developed Scenario The Developed Scenario has been modelled in WBNM by adjusting the site’s fractions impervious values and catchment delineation to represent the proposed development. The impervious fraction for the developed portion of the SUB1 (adjoining approval) and SUB3 has increased from 11% to 50% (values consistent with ‘Urban Residential – low density (Including roads)’ catchments in QUDM (2017)). The developed catchment delineation is shown in Figure 2-2. SUB1 and SUB3 represents the development with flows being routed through the existing detention basin (which has been increased in volume). The catchment parameters are summarised in Table 2-5. Figure 2-2: Developed Catchment Delineation Similar to the existing scenario, the existing drainage capacity of Pavilion Street is approximately equivalent to the 10% AEP storm event, with flow greater than this overtopping the verge and entering the site. To account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP. The portion of flow greater than the 10% AEP was converted into a ratio, which was then applied to the catchment area as detailed below in Table 2-4 and Table 2-5. This ensured that flows from SUB1-Ex greater than the 10% AEP were routed through the site. 23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.