Existing 1% AEP flood level
Area of shallow cut to offset
loss of floodplain storage.
Fill – earthworks to augment the
capacity of the existing basin
Fill at lot 8 building platform
Figure 2-3: Proposed cut / fill areas and extent of 1% AEP (CC) flood level
2.2.7. Flood Immunity
The NSC Planning Scheme identifies the Defined Flood Event, from which freeboard is set is the 1% (2100)
AEP flood event. Flood levels around the site for the 1% (2100) AEP are detailed for various reporting
locations as shown in Figure 2-4. This shows the proposed new lots are above the 1% (2100) AEP peak flood
levels. The peak flood level, minimum finished flood level and proposed lot level is shown in Table 2-12. It
is seen that greater than 500mm freeboard is provided to lot. It is recommended that future buildings on
each lot achieve a minimum of 500mm freeboard above the regional 1% (2100) AEP flood level.
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood Levels
Lot 1% AEP Peak Flood Minimum Freeboard Min Finished Floor Proposed Min Lot
Level (m AHD) to Floor (m) Level (m AHD) Level (m AHD)
8 83.44 0.5 83.94 87.61*
*Reported level is min lot level within the proposed building footprint area
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.