Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export Parameters
Total Suspended
Total Phosphorous Total Nitrogen
Solids
(Log10 mg/L) (Log10 mg/L)
Land Use Parameter (Log10 mg/L)
Storm Base Storm Base Storm Base
Flow Flow Flow Flow Flow Flow
Mean 2.18 1.0 -0.47 -0.97 0.26 0.20
Ground
Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20
Mean 2.43 1.0 -0.30 -0.97 0.26 0.20
Road
Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20
Mean 1.30 N/A -0.89 N/A 0.26 N/A
Roof
Std Deviation 0.39 N/A 0.31 N/A 0.23 N/A
Table 3-3: MUSIC Runoff Generation Parameters
Parameter Urban
Rainfall Threshold (mm) 1
Soil Capacity (mm) 500
Initial Storage (%) 10
Field Capacity 200
Infiltration Capacity Coefficient a 211
Infiltration Capacity Coefficient b 5
Initial Depth (mm) 50
Daily Recharge (%) 28
Daily Drainage (%) 27
Daily Deep Seepage Rate (%) 0
3.2.3. Catchment Areas
The development site and external catchment has been split into three catchments containing split source
nodes (road, roof and ground) representing total developed area reporting to the bioretention basin. As it
is proposed to extend the existing bioretention basin approved with reconfiguration of lot at 25 Pavilion
Street, the catchment setup from that approval has also been represented. Table 3-4 outlines the
catchment areas and imperviousness represented within the MUSIC model. The stormwater quality
catchments are provided in Figure 3-1.
Table 3-4: Catchment Areas
Catchment Road (ha) Roof (ha) Ground (ha) Total (ha)
1 0.342 0.250 0.791 1.384
Ex1 - 0.049 0.415 0.464
2 0.157 0.250 0.854 1.261
Ex2 0.091 0.639 0.73
Impervious % 60 100 15 -
23-0167SMP01-V2 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.