Skip to the record
Every meeting, every word.

Original source · versioned page text

2014-01-02 Budget Adoption Report Attachments

of 161

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                                                                Fees
                                                          Engineering & Environment Services
                                                                                                               2013/14


1 MINIMUM FEE
  The fee for any matter relating to a development application and requiring a report to be placed before
  Council, that is not otherwise defined in the Schedule. Where not lodged as an integrated applicaoin
  shall pay the application fee for each separate application.

  Base fee                                                                                                         $1,335

  The fee for any matter relating to a decision for a development application, or other matter not listed in
  the Schedule and not requiring a report to Council.

  Base fee                                                                                                           $813

  Works relating to Reconfiguring a Lot (eg, drainage, stormwater, roadworks, water, sewerage &
  electricial reticulation, street lighting & landscaping works etc) where lodged as an integrated
  application.

  Base fee                                                                                                         $1,645
  Increment                                                                                                          $492
  Increment scale                                                                                              Plus per lot

  Electricity Reticulation and Street, Outdoor Lighting
  Base fee                                                                                                           $323
  Increment                                                                                                           $37
  Increment scale                                                                                              Plus per lot

  Vehicle Crossover
  Base fee                                                                                                           $375

  Works relating to Landscaping for which higher order approval or Operational Works Approval is
  current
  Base fee                                                                                                         $1,645

  External Roadworks, Stormwater Drainage, Landscaping, Car Parking and Driveways (relating to
  Material Change of Use Approvals) *Capped at 5000m2 Site Area
  Base fee up to 1000m2                                                                                            $2,361
  Base fee up to 1001-12000m2                                                                                      $3,009
  Base fee up to 1201-1400m2                                                                                       $3,660
  Base fee up to 1401-5000m2                                                                                       $4,174

  Works not relating to Reconfiguring of a lot or Material Change of Use or other development
  approvals eg. Bulk earthworks, changes to natural surface levels, bridges, other infrastructure                  $1,535
     or 0.5% of Estimated Value of Work whichever is greater.
  Max fee                                                                                                         $25,000

  Carrying out Operational Works for Prescribed Tidal Works (applications for jetties & decks &
  pontoons for private use associated with a Single Residential Dwelling - canals, tidal waters)                   $1,035
  Carrying out Operational Works (applications for jetties & decks & pontoons for private use
  associated with a Single Residential Dwelling - Noosa Waters canals)                                             $1,035
  Carrying out Operational Works for Prescribed Tidal Works                                                        $1,623



                                      Engineering Environment Fees - Page 1 of 1
Log in to download the original file

2014-01-02 Budget Adoption Report Attachments(PDF, 2MB).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.