2014-01-02 Budget Adoption Report Attachments
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Council Original
Budget Schedule of Capital Works Budget
For the six months ending 30 June 2014 2013/2014
$
Bridges
Forward design for shire bridge rehabilitation program 10,000
Noosa Parade Munna Point bridge - investigation and interim preventative works 250,000
Coastal, Canal and Waterways
David Low Way, Beach Access 49 refurbishment 45,000
Gympie Terrace and William Street Noosaville revetment wall and pathway rehabilitation 50,000
Munna Point Noosaville holiday park bank protection - design 50,000
Noosa dog beach sand bank protection monitoring 20,000
Noosa river mouth groyne amd rock wall - rehabilitation 100,000
Noosa Waters estate revetment walls rehabilitation - stage 2a 1,300,000
Community Facilities
Peregian beach surf club public amenities - planning & design 15,000
Holiday Parks
Noosa North Shore beach campground - upgrade septic treatment 90,000
Information Communication Technology
ICT major projects 1,600,000
Parks and Playgrounds
Cooroy skate park minor renewal works 34,000
Gympie Terrace Noosaville park furniture renewal program 50,000
Joe Bazzo Park (Pomona community house park) BBQ relocation 12,000
Noosa Lions Park - rehabilitate shower facilities 30,000
Peregian Beach park plan - Finalise the upgrade and removal of surplus playground 30,000
Pathways and Enabling Facilities
Cooran state school - Charles Street pathway improvements 30,000
Pomona state school - Station Street pathway improvements 100,000
Weyba Creek boardwalk rehabilitation - stage 1 20,000
Gibson Road (Eumundi Noosa Road to Thomas Street) - On road cycle and pedestrian improvements 440,000
Sunshine Beach state school safety improvements 90,000
Public Transport Infrastructure
Noosa Junction mini bus shelter - install weather protection panels 25,000
Noosa Parade transit hub - stage 1 300,000
Sealed Road Network
Annual sealed road renewal & rehabilitation program 500,000
Sealed Road Pavement surveys and Investigations 60,000
Sports Grounds and Facilities
Noosa District sports complex stage 1 redevelop cricket ovals 30,000
Stormwater Drainage
Daintree estate Tewantin - flood mitigation planning and design 50,000
Gympie Terrace pipe rehabilitation - investigation and design 25,000
Rifle Street Pomona - flood mitigation planning and design 50,000
Seaview Ck Sunshine Beach - open drain civil works 25,000
Stormwater replacement program (non pipe infrastructure works) 75000
Streetscapes and Road Corridors
Forward planning for streetscape and road corridor improvements 50,000
Transport and Infrastructure Management
Eenie Creek Road / Langura Street Noosa Heads - intersection safety upgrade design 8,000
Eenie Creek Road / Walter Hay Drive Noosaville intersection safety upgrade design 15,000
Weyba Road / Reef Street Noosaville intersection improvements 125,000
Total 5,704,000
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.