Ne@len wwe Checklist - Applications Involving Land
Development & Land Use Sections

Sa

 

IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

4... APPLICATION FORMS ~
1.1 Form 1 Part A

4.1.1 Ensure that the form is fully completed. /|
4.1.2 in the case of an MCU or Op Works below the high-water mark, owners consent is required.

a4

 

 

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 | If the owner of the land is a company, either ACN No. or Company Seal required.

1.1.2.4. Ensure that each of Forms B-O which are attached are fully completed.

Pr Soa me - - ao.

2. REFERRAL INFORMATION © .
2.4 Ensure that items 1-23 have been checked and/or completed with regard to referrals.
3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES |
3.4. Ensure that Part G is completed if EPA referral is required.

 

1.2. Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. e

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on ihe application.

 

 

 

4. 7 “FORM 2% REQUEST.TO CHANGE APPROVAL. o- ge

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

5. PLANS . Se , Sag oe
5.1. Ensure that at least 6 sets of the Plan of Development (5 for Reconfi iguration and Operationat [3]
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. - SUPPORTING INFORMATION 77 ue a a ot
6.1. Ensure that at least 6 copies of any report accompanies ‘the application (5 for Reconfiguration [-]
and Operational Works). If the application is accompanied by a covering !etter, ensure that it is
capable of reproduction. [-]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
qe: FEE @ fo DOP L CUR

 

7.1 Ensure that the application fee, as determined from the ‘Council s adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form. S

Receiving Officer LS. Doha Date .... wYclek

Having completed this form and accepted the agflication, please deliver both to the following IDAS Application Receiving

trays:-

« {the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

«Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

«  Inail other circumstances ~ AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

 

 

     

 

 

 

SEPI g:\antorms\application checklist.doc
Full text of the other 26 pages

Page 2

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

   

Form-1 Development Application

Part A

Common details

  

 
 

Identification of the premises the subject of the application

1. Can any part of the premises be identified by a street address os lot on plan description?
{1 No- Answer Qi(a}

1(a} Does the application onty involve a mobile and temporary environmentally relevant activity (ERA)?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1 No-Gotoa2 (1) Yes - Complete Table A stating each local government area in which the mobile and temporary ERA is
proposed to operate: Then go to Q9
Table A Name of each local government
(1.
KL Yes - Complete Table B and answer Q1(b) and Q1(c}:
Table B
Unit | Street Officiat suburb =} Post (oc sen daptonin sop row)
number} number Street name Nocality name — | code | 13s 1 pron ype Locat govemmentarea
number } (ag RP, spp | Plan number
lt. SELENITY cLeE| NOOB HEALSESE7] © |. SP |.1TIZE1 NOOSA COUNCIL
4(b) Can the address be further described by shop/tenancy number or storey/level? ( EDIAN ST2zp
KL No CI Yes- Complete Table C =
Table C
Shopitenancy number Storeyflevet
[1.
1(c)_|s any part of the premises strategic port land under the Transport Infrastructure Act 1994?
wh No (Yes - Complete Table D
Table 0
tot on plan description Port authority for the tot
[1.
2. Can the premises best be identified by coordinates (e:g. for development proposed in waters or on a site within a large rurat ot)?
U1 No 0 Yes- Complete Table €
Table E
Coordinates .
(place each set of coordinates ina separate row) Zone Reference Local govemment area
Easting Northing. Lattude | Longitude and Datum
1. Zone Reference
.- C0 Gbas4 (preferreay
DO wesea
C1 other - Specify

 

 

 

 

 

 

 

 

 

 

 

 

Ae

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

3. Are the premises within or adjacent to a water body or watercourse?

 

 

 

 

 

 

 

No 1 Yes - Complete Table F and answer Q3(a)
Table F
Name of water body or watercourse
fi.
3(a) ts any part of the development proposed in tidat waters (ie. below high water mark}?
(J No 0 Yes
If yes, is the land in either oF both of the following —

* A tidal area for a tocat government (No £11 Yes - Complete Table G, Column 1

¢ A tidal area for strategic port land (CINo (1 Yes- Complete Table G, Column 2
Table G

COLUMN 1 COLUMN 2
Name of loca? government (if applicable) Name of port authority (if appicabie)-

 

 

 

[1.

 

4, Whats the total area of land that makes up the premises (i.e. the area covered by the application}?

 

 

 

 

Area of fand above high water mari/outside watercourse Area.in.a water body or watercourse
S10 m2 [J hectares (Tick applicable unit} Io m O hectares (TEX aupteabia unit)

 

 

 

Existing use of the premises

5. Are the premises currently used for any purpose?

mM No CI Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application,
e.g. location and nature of existing uses, buildings, structures and services

6. Are there any existing easements on the premises (e.g. for vehicutar access, electricity, overtand Raw)?

 

KL No [1 Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the
application
Table H
Purpose of each easement Entity favoured by the easement

 

 

 

ft.

 

 

Proposal details

7, Are new uses proposed on the premises?
No LZ Yes — Complete Tables

Table!

 

Each proposed new use

 

 

i.

 

 

8. Are new buildings or structures proposed to be erected on the premises?

KX No Oo Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans,
submitted with the application

Applicant details

9. Whois the applicant for the application?

 

ompany or organisation name | CRD Settler's Coe. Pty ced

 

 

 

 

-2-

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

Applicant details (continued)

 

 

 

 

 

 

 

 

 

Individual contact person details

Title Me [First name [SHARON |Last name | Gittpepa
Postal address FO BOX (423, NOOSA HEADS QuD, 4SG7
Contact telephone number (07) Suyus OBE

Mobile phone number o4uOS 752. 254

Facsimile number (07) S44D 0286

e-mail address shannen. q lard @ Cape ouvard .caw

 

 

Owner’s consent and resource entitlement

10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998(IP Reg) or

 

 

 

 

 

 

 

 

 

 

 

 

 

any other regulation?
No ao Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource-allocation or
entitlement
Table J
Nature of State-owned resource
Nature of evidence required
Allocation/entitement sel ie at State Government ‘i Date of
reference number Name of authorising officer | Position of authorising officer Department Date of issue. expiry
(1.
11. Dogs the application involve land other than State-owned land (ie. privately owned fand) and require owner's consent?
No O Yes - Complete Table K and submit, with the application, written documentation of all owner's consent
Table K
Owner name/s E Street address of lot on plan description Date written consent was obtained

 

 

{1.

 

 

 

 

Mandatory attachments and supporting information

12. What are the other parts of IDAS Application Form 4 submitted with this application, and the other mandatory attachments. and
supporting information accompanying this application, not identified in those other form parts?

 

Description of attachment or information Title (if appicable) a .
(9.9. Part C of Form 1, owner's consent, evidence of (e.g. General Authority, James Street Date Method of delivery ess
resource allocation/entitlememt, plans, drawings, reports) Traffic Report) managt

 

 

 

 

 

[1.

 

 

Portable Long Service Leave (PLSL) levy for building and construction work
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for they
appiication can be given?
No - Complete Q13(a)
13(a) Indicate the reason PLSL is not applicable.

CJ The application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g, the application is only for a change of use or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests); OF

All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
3

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

1 The work is being carried out under an ownes-builder permit issued under the Queensiand Building Services Authority Act
1991 - Complete and submit a QLeave Notification and Payment Form (no payment required if owner-buider permit number stated). The receipted
form must be sighted by the assessment manager before a development permit can be given.

OO Yes - complete Q 13{b)

13{b) Has the PLSL levy been paid?

(0 No- Comptete and submit a QLeave Notification and Payment Form. The receipted form must be sighted by the assessment manager
before a development permit can be given.
o Yes - Complete Table L and submit, with the application, the “yellow* (Local Government's (Couneif / Private Certifier's) copy of the

 

 

 

 

 

 

 

 

 

 

 

receipted QLeave Form.
Table L
Amount paid Date paid Qkeave Project Number (6 digits, starting with A, 8, E, L or P}
[ 4.
OFFICE USE ONLY
[Date received | Allott ] [Reference numbers | OX] costa
¥ t

 

FOR COMPLETION BY ASSESSMENT MANAGER

1s a QLeave Notification and Payment Form required for this application?
{] No

tL} Yes Complete Table M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table M Column 1 Column 2 | Column 3 Column 4 Column 5 Column 6
i Date receipted form .
Description of the work Amount paid Date paid Qheave Project Number | sighted by assessment Name of officer who sighted the
8) manager form
[1
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
To: | | Council.
have been engaged as the private certifier for the building work referred to in this. application.
° end rt Accreditation number Name BSA CertiScation number Building classification

 

 

 

 

 

 

 

 

 

 

Advice for completing Part A

 

General advice

« — Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’. The
assessment manger may refuse to receive an application that is not properly made.

© — Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types. of applications, are
stated in other Parts of Form 1.

« — The IDAS Assessment Checklist must also be completed for alt development applications, other than those requiting assessment against the Building Act
1975-only.

« For further information about completing this form go to IDAS Guide 1 (Making and IDAS application)

 

Q1 | + Thepremises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are: most common. Lot on plan
details can be obtained from title documents or through the loca government.

* The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land {whether or not a building of other structure is
situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

* A-description of the land is not required if the application relates to a mobile and temporary Environmentaity Relevant Activity (ERA) only. Instead
complete Q1(a).

* Strategic Port Land is within a local government area but a local government's planning scheme does not apply on Strategic Port Land. Strategic
Posi Land is declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land)
and the Queensland Transport (Ports) website.

 

Q2 | + Coordinates often provide the best means of accurately identifying the location of development proposed. in waters, or on a relatively small
development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of
the application.

« Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

 

 

 

4.

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Q3

* Asingle development application may involve land both within and outside waters.

* A'watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to which high spring
fide ordinarily floes and reflows (untess a regulation has. declared a limit for the watercourse). Generally, a watercourse is in the jurisdiction of the
Oepartment of Natural Resources and Water.

« ‘Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidat area’ for a locatgovernment and for strategic port land is defined in
the IPA (schedule 10). Generatty, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high water mark at spring
tides) establishes the boundary of a thdat area.

+ Land below high water mark is not within a local govemment’s area unless provided for under the Local Goverment Act 1993. Untess otherwise
provided for by legislation, a local government has no jurisdiction betow high water mark. A tidal area for strategic port land is within the jurisdiction of
the relevant post authority, while the Environmentat Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA
gives local governments jurisdiction for assessing and deciding apptications for prescribed tidat works within the tidal area for a locat government,
and the planning scheme may be applied to thal assessment (to the extent provided for in the code for prescribed tida! work).

 

« The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the Form 1
Application Form (including this Part and any other relevant Part} is correct.

«Ifthe applicant is a company of organisation, a contact person must be nominated.

* Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the
processes of the application or in the event of an appeat about the outcome of the application.

 

ato

+ Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource. Schedule 10 of
the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where evidence is required to be given,
and the evidence required to support the application. Link to Integrated Planning Regulation

© Section 3.2. 1(10)(a)(ii) states an application cannot be taken to be:properly made without the required evidence.

» Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmentat Protection Agency
for quarry materiat below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water
mark..

« Inthe case of applications invoiving the taking or interfering with water under the Water Act, the development application may be made at the
same time as the request for resource entitlement.

+ Inthe case of State-controlled roads, a resource entittement is not required for an activity that is exempt ancillary works or encroachment (identified
by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

 

Qit

* Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application
involves any of the following:

(i) a material change of use;

(li) teconfiguration of a lot;

(iii) work on land below high-water mark and not within a canat as defined under the Coastat Protection and Management Act 1995; or

(iv) work on rail corridor land defined under the Transport Infrastructure Act 1994.

* ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the
tent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

¢ Owner's consent is not required for a mobile and temporary ERA.

 

Qi2

Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

ats

« The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and:
construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a levy
is collected on all building and construction work carried out in Queensland where the totat cost of the work, whether direct or indirect; is $80,000 or
more inclusive of GST. This amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction
Industry (Portable Long Service Leave) Regulation 2002. included in the amount collected by Qteave is.the Workplace Health and Safety Fee and
the Building and Construction Industry Training Levy.

¢ The Building and Construction Industry (Portable Long Service Leave) Act 1994 (PLSL Act) defines the building and construction industry for the
purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing buitdings, poots,
toads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating. or draining land.

« The PLSL Act requires the portable long service leave tevy (PLSt levy) be paid-before the assessment manager may give a development permit for
certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the status of the payment
of the levy.

+ Building and Construction industry Notification and Payment Forms are avaiable from any Queensland post office or agency, on request from
QLeave, or can be completed on the QLeave website at www.qleave.ald.qov.au

* For further information contact QLeave (Tet. 1800 803 481 Web: waw.gleave.qid.qov.au )

 

 

 

 

Privacy Statement

The information collected on Form 1 wilt be used by the Department of Local Government, Panning, Sport and Recreation in accordance

with the processing and assessment of your Application, Your personal details will not be disclosed for a purpose outside of the IDAS process,
except where required by legisiation (including the Freedom of information Act 1992) or as.required by Parliament. This information may be
stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will be retained as required
by the Public Records Act 2002. For further informatian on your privacy, contact the Privacy Contact Officer for the Departmant of Local
Government, Planning, Sport and Recreation at (07) 3237 1860.

 

 

Page 7

~ef

INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007

   

Form 1 Development Application

Part E

Building &/or operational work assessable against a planning scheme

Nature of the works
1. ts io seeking approval of building work assessable against a planning scheme?
No
{J Yes
4{a) a is the application seeking approvat for more than one type of building work?

No - Complete Table A
C1 sYes- Complete a new Table A for each type of building work

 

Table A

(i) What aspect of the building work is made assessable by the planning scheme (e.g. building height greater than 8.5m, building work on high
landslip risk area)?

|

(ii) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
0

 

 

 

 

 

 

 

 

 

 

No
{Yes - Complete Table A(a)
Table A(a}
List of approval reference/s Date approved Date approval lapses
[ 1.
[ GENERATE ANOTHER TABLE A

 

2. Is the application seeking approval of operational work assessable against a planning scheme?
(1 No

Yes

2(a) ‘yes, is the application seeking approval for more than one type of operational work?
No — Complete Table 8

Yes - Complete a new Table B for each type of operational work

 

Page 8

INTEGRATED PLANNING ACT 1997

Part E, Version 3.0, 3 September 2007
Table B

 

(i) What is the nature of the operational work?

1 Roadworks 1] Stormwater CD Water infrastructure

x Landscaping (Clearing vegetation under the planning scheme
2 Orainage works [) Signage

—

(ii) Is the application for operationat work involving the creation of new lots?
No

C1 Yes - Specify number below

fT

(iii) What type of approval is being sought?
St Development Permit
{iv) Is there a current Preliminary Approval for this operational work on the premises?
No
(Yes - Complete Table B(a)
Table Bia)

C1 Sewerage infrastructure

1 Earthworks
(1 Other - Specify below

(Preliminary Approval

 

List of approval references
[4

 

Date approved | Date approval lapses

 

 

 

 

 

(v) werte works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
No
YY Yes - Complete Table 80)

 

 

 

 

 

 

 

 

 

 

 

 

 

Table Bib)
List of approval references Dateapproved | Date approval lapses
[ 1. Foéveropmenr pppeova. [REF go07 Jot | O2]OB]O 02/08 [oy
(OP WALKS = LANDSCAPING Lot 4 SPT SO0EH)
| GENERATE ANOTHER FABLE B
e@ Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of Method of lodgement
lodgement

Plans, and specifications if applicable, showing the nature and location of the proposed works
{including the extent of any cut and fil)

 

 

 

C]_ Confirmed DELIVELED

 

 

 

 

OFFICE USE ONLY

[Date received | ]__ [Reference numbers

Advice for completing Part &

General advice
« — Part A must also be completed for all IDAS development applications.
All questions must be answered unless, following a response, there is a statement to go directly to a particular question.

 

Q1&2

 

 

 

A development permit authorises development to occur, while a preliminary approvat is a step in the approval process and does not authorise
development to occur.

 

 

-2-

Page 9

INTEGRATED PLANNING ACT 1997

  
 
   

Assessment Checklist

IDAS Development Application Form 1 is the approved form forall davelopment applications under the integrated Planning Act 1997 IPA).
Form 4 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all apptications. The relevance of other Parts

of Form 1 depends onthe nature of the application.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and

the Parts of Form 4 relevant to the application.

Section t and alt other relevant sections of the IDAS Assessment Checklist must be completed for all development apptications except those
tor building work requiring assessment against the Building Act 1975 only. For more advice refer to Part B of the IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must ba completed for your application. If

unsure, phone or visit your local government or log onto the IPA website www.ipa.qid.gov.au for hetp

 

Does the application seek approval to materially change the use of the premises?
if yes - complete Section 2 of this checklist.

OYes

BXNo

 

Does the application seek approval to reconfigure a lot?
ifyes - complete Section 3 of this checklist and Part F of DAS Application Form 1, Assessment Is by the local government.

rc

 

Does the application seek approval to carry out operational work?
If yes - complete Section ¢ of this checklist.

Cino

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
Ifyes - complete Section 5 of this checklist.

[EX No

 

Does the application seek approval to carry out buitding work requiring assessment against a locat government
planning scheme?

It yes - complete Part E of IDAS Application Farm 1. Assessment is by the tocal government.

LANo

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
If yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Assessment is by a
building certifier,

 

 

Kno

 

 

Page 1

 

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 21.0, 3 September 2007

S ECT | O N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

 

HERITAGE

 

14

ts any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?

RX[No O Yes

if yes, has an exemption certificate for the proposal'.' been issued under the Queensiand Heritage Act 1992?
Yes LINo
if no, is the proposed work emergency work for the Queensland Heritage Act 19927
OyYes ([CJNo
Ifno, is the work being carried out by the State?

oO Yes oO No - (Complete Form 1, Part C) This appication requires assessment by the Queensland Heritage Council (QHC). If QHC
is not the Assessment Manzger for the application, the Council has jurisdiction as Concurrence Agency.

IPA, schedule 9, part f table 5. em 2: IP Regulation, schedule 2. table 2, tem 18: 1PA. section | 3.5 (Definitions for terms used in development)

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA

 

1.2

No Yes

If yes, is an allocation notice required under the Water Act 2000?
No Yes

If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
oO No — (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
0 Y@S - Unless the application is consistent with any property development pian applyingto the land, the Assessment Manager must refuse to receive it.
(Complete Form 1, Part Ky). if NRW is not the Assessment Manager for the-application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.

a the proposal involve removing quarry materiat from a watercourse or lake as defined under the Water Act 2000?

JPA, schedule 8, part |. table 5 item 1 1P Regulation schedule 2 table 2 em 11:!P Regulation schedule 1 table 5, dem 2 (wid ver area), Water Act 2000 section 966C. Wud Rivers Act
2005, section 434

 

ENVI

IRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

13

 

No O Yes

If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
No

{f no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of
each proposed ERA?

O No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. If the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

CO Yes
O01 Yes

If yes, is any ERA an item 20 ERA (extracting rock or other material} intended to be located in. waters?
Yes
If yes, will the application be accompanied by an allocation notice fos that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?

1 Yes - Refer to Footnote 1.2 & 1.3.
oO No - An application for the ERA would be taken to be not properly made and the Assessment Manager must refuse lo receive it. Go to Q1.4

ONo

Bi the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

 

 

 

11 In this IDAS Assessment Checklist, the term proposal rafers to the proposed use, work or lot reconfiguration the subject of the application.
12 Uniess the application is consistent with any property development plan applying to the land, and the application is accompanied by an allocation notice, the Assessment

Man:

ager must rafuse to receive il.

13 (Complete Form 1, Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to
the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has.
jurisdiction as Concurrence Agency.

Page 2

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (com)

 

 

If no, is any part of any ERA intended to be located in a high preservation area?

 

 

 

 

 

 

Ol Yes

if yes, is each proposed ERA one of the following?

« _ ERA, item +5 (sewage treatment) (1 No| (1 Yes
¢ _ ERA, item 16 (municipal water treatment plant) ONo|O1 Yes
¢ — ERA, item 19 (dredging material) Ono| C1 Yes
« ERA, item 14 (crematorium) [1 No| DO Yes
¢ ERA, item 28 (motor vehicle repair shop) C) no! D0 Yes
¢ Level 2 ERA other than - Ono} D1 Yes

« _ item 1fa) (aquaculture); item 2{a) (cattle feedlotting); item 3(a) (pig farming); item
4(a) (poultry farming); item 20 (extracting rock or other material); item 22
(screening etc. materials); or item 59 (asphalt manufacturing)

* — ERA, item 20 (extracting rock or other material) located outside waters and the {No|C Yes
activity is a borrow pit of not more than 10,000m! for -
» — specified works under the Wild Rivers Act 2005; or
+ _residential complexes, as defined undes the Environmental Protection Act 1994

« ERA, item 22 ( screening etc. materials} and carried out outside waters and the activity (No! {7 Yes
is for -
« specified works under the Wild Rivers Act 2005; or
« for residential complexes, as. defined under the Environmental Protection Act 1994

¢ ERA, item 14 (crude oil or petroteum product storage) and the activity is - No} C1 Yes
* alevel 2 ERA; and
+ for residential complexes, as defined under the Environmental Protection Act 1994; &
« carried out outside a designated urban area, as defined under the Wild Rivers Act
2005

« — An exempt environmentally relevant activity, as defined under Environmental Protection (1 No| (1 Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005

 

 

 

 

 

 

 

 

 

If yes to any one - Refer to Footnotes 1.2 on page 2, 1. 481.5

If no to all - An application for the ERA/s would be taken to be-not properly made and the Assessment Manager must refuse to receive it.

(No
Ifno, is any ERA an item 20 ERA (extracting rock oF other material) intended to be located outside waters?
LINo — Refer to Footnote 1.2 on page 2 & 1.6 Des

If yes, does the ERA meet the following?

¢ — the activity is located inside a flood management area and a borrow pit of not CNo|LJ Yes
more than 10,000m? for -
+ — specified works under the Wild Rivers Act 2005; or
« residential complexes, as defined under the Environmental Protection Act 1994

 _ the activity is located outside a flood management area Lino! Yes |

 

 

 

 

 

 

 

 

Hf yes to eithes - Refer to Footnotes 1.2 on page 2 & 1.3

If no to both - An application for the ERA would be taken to be not properly made and the Assessment manager must refuse to receive
it

IPA schedule 8, part 1. table 2. dem 1, IPA. schedule 2. part 1. table 5 dems 3 and 4, 1P Regulation schedule 2 table 2. tems 1 and 23: Environmental Protection Act 1994 section /3AA (wad
uver area): Wild Rivers Act 2005, section 434

 

 

 

 

{Complete Form 1, Part G). This apptication requires. assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

Subject to any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild Rivers Act 2005. In
particular, ERAs 15 and 16 and an ‘exempt environmentally retevant activity’ do not require assessment for the purposes of the Wild Rivers Act 2005 if the proposed is
located in a designated urban area

{Complete Form 1, Part G). This appfication requires assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wikt
Rivers Act 2005. tf the Administering Authority is not tha Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

Page 3

Page 12

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

WITHIN THE LIMITS OF A PORT

 

14

J Isany part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No OD Yes

If yes, is that part of the premises below high water mark?

CINo

OYes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 — Answer (a) to (c) below. This application requires assessment by the Port Authority for the land. if you answer no to (a), (b) and
(c) below, the Port Authority for the Port has jurisdiction as Advice Agency.

(a) 1s any part of the proposal within 200m of a shipping channel or an entry and exit shipping. corridor for the Port?
ONo (1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.

(b) Is any pert of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage-or spoil grounds?
CINe oO Y@S - The Port Authority for the Port has jurisdiction as Concurrence Agency.

(c) _ Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
O

No o Yes.- The Port Authority for the Port has jurisdiction as Concurrence Agency.
IP Regulation, schedule 2, table 2. tems 15 and 16

 

 

OECLARED FISH HABITAT AREA

 

15

No

‘es - If answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2. tem 26.

Dogs any part of the premises adjoin a declared fish habitat area under the Fisheries.Act 1994?
OY

 

COMMUNITY INFRASTRUCTURE

 

 

 

1.6 |Isny part of the premises designated for community infrastructure?
ite LI Yes
If yes, is the community infrastructure intended to be provided by a public sector entity?
No (1 Yes
If yes, is the land owned by or on behalf of the State?
OlYes [No
If no, is the development for the following?
« — For the designated purpose [No (ClYes
¢ — Carried out by, or on behalf of, the designator Ono (Yes
{tno to either or both, is the proposed development assessable under the planning scheme?
CNo (J Yes - this apptication must be referred to the Queensland Government department administering the Act authorising the
development for the designation as Concurrence Agency.
IP Regulation. schedule 2 table 3, tem 7
WASTE WATER MANAGEMENT
17

 

 

Dogs the Proporat involve the establishment or expansion of a waste water disposatsystem?
XX] No Yes

f yes, is any part tye disposat system proposed to be located in an area declared to be a catchment area under the Water Act 2600?
LJ No Yes

If yes, is the proposed waste water disposal system an environmentally retevant activity (ERA) under the Environmentat
Protection Act 1994?

O Yes [No

If no, is the proposed development involving the waste water disposal system assessable under the planning scheme?

oO No oO Yes.- This application requires assessment by the Department of Natural Resources and Water (NRW) as Concurrence
Agency.

IP Regulation, schedule 2. table 3 item 5

 

 

 

Page 4

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

S ECT | O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME

41

 

 

Is any of the proposed operational work assessable under a planning scheme?

Oo No - Go to. Q4.2 ‘eS - (Complete Form 1, Part E) Answer Os4, 1.1 - 4.1.8 below.
STATE-CONTROLLED ROAD

441

 

 

SEN part of the premises within 100m of a State-controlled road; or part of a future State-controlled road?
No

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

ONo
(Yes

If yes, is all of the proposed operational work associated with the following?

* —Amaterial change of use that is assessable under the planning scheme (no (Yes

Reconfiguring a lot that does not increase the total number of lots and does. not increase the total CINo (1) Yes
number of lots abutting the State-controlled road

Oo Yes - This application must be referred to the Department af Main Roads.{DMR) as Concurrence Agency.

If no to either or both - Answer (a) - (c) below

(a) Is any of the proposed operational work associated with access to a State-controlled road?
No Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency,

(b) Is any of the proposed operational work for filling or excavation?
Kno §=6©. Yes

If yes, is the operational work proposed in a future State-controlled road defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency
o Yes - This application must be referred to DMR as Concurrence Agency.

(c) oes any of the proposed aperational work invotve the redirection or intensification of site stormwater from the land,

through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-contratled road?
Kino = Yes

If yes, is the operational work proposed in a future State-controlled road defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.

oO Yes - This application must be referred to OMR as Concurrence Agency.

JP Regulation, schedule 2, table 3, tem 3, {P Regulation, schedule 2, table 3 tem 1(0)

ACID SULFATE SOILS

4.1.2

 

 

\s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development involving Acid Sulfate Soils?

RI No (Yes

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
No (Yes

If yes, does the proposed operational work involve the following?
« — Excavating more than 1,000m: of soil or sediment at or betow 5m AHD LNno fYes

Filling the premises with 1,000m? or more of material with an average depth of 0.5m on CINo (Yes
land, soil or sediment at or below 5m AHD

If yes to either or both - This application must to be referred to the Department of Natural Resources and Water (NRW) as Advice Agency
JP Regutation, schedule 2, table 3. tem 4; State Planning Policy 02 Planning and Managing Development invohing Acid Sullate Sous section 36

 

 

 

 

 

41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Cailiope, Catoundra, Cardwell, Carpentaria, Cook, Coaloola, Dougtas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroachy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

Page 21

Page 14

INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

EASEMENTS AND SUBSTATIONS

 

4.4.3

Is any of the proposed operational work for filling or excavation?
[No O Yes

Iyes, is the filling or excavation associated with reconfiguring a lot?

(Yes LI No - Answer both (a) and (b) below
(a) _ Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
Ono Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No (71 Yes - This application must be referredto the entity as Advice Agency.

(b) Is any of the operationat work proposed-to be located within: 10m of a substation site under the Electricity Act 1994?
oO No oO Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

IP Reguiation, schedule 2. table 3 dem 1&{a), IP Regulation, schedule 2, izble 3 dem 10d}

 

4.14

ls any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
IXINo O Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?

CINo QO Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No (1 Yes - This application must be referred to the licence holder as Advice Agency.

IP Regulation, schedule 2, table 3, dem 17

 

PUBLIC PASSENGER TRANSPORT

 

415

Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No (1 Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.

IP Reguiation, schedule 2, table 3, item 14.

 

RAILWAY SAFETY AND EFFICENCY

 

 

 

4.1.6 |\s any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshotd?
No (1 Yes - This appiication must be referred to Queensland Transport (QF) as Concurrence Agency.
IP Regulation, schedule 2, table 3. tem 15,
KOALA CONSERVATION
4.1.7. |\s any part of the premises in a koala conservation area or koala sustainabitity area?

No Dyes

If yes, is all of the proposed operational work associated with a materiat change of use or reconfiguring a lot for which referral
is required in relation to koala conservation fie. did you answer ‘yes’ to alt questions in either Q2.1.8 or Q 3.12)?
(Yes No

If no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?

OYes LINo
If no, will the activity result in the following?
© — Clearing of native vegetation over an area greater than 2,500m? CONo (Yes
e — Extracting gravel, rock or sand from an area greater than 5,000m2 LJNo [] Yes
¢ — Excavating or filling an area greater than 5,000m? CINo (Yes

lf yes to one or more - This application must be referred lo the Environmental Protection Agency (EPA) as Concurrence Agency.

 

IP Regutation schedule 2, table 3, tem 19.

 

 

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currently no declarations for any of the wiki river areas apply the Wild Rivers code to that type of development.

 

 

Page 22

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA

4.2 | |Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No Yes

 

If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part E) The aperational work associated with reconfiguring is assessed by the local government.

O Yes

If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
0 No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the focal government.

oO Yes (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government, and subject tothe
declaration for the relevant wild river area, assessment by the local government is required for the purposes of the Wild Rivers Act 2005.

IPA. schedule 8 part J, table 4. tom 2 IP Reguistion schedule |. part 2. table 5 tem I(c) Wild Revers code (Note: the code does not currently contain appkcable provisions for residential,
industrial of commercial development ips:da a designated urban area)

VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
4.3 |\s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?

 

 

K{No 0 Yes
tf yes, is the proposed clearing assessable (i.e, not an exception) under schedule 8, part 1, table 4 of the IPA?
CI No (Yes

if yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A

for one or more of the following?

(a) A project declared to bea significant project under the State Development and Public Works ~[_] No Yes
Organisation Act 1971, section 26

(b) Necessary to control non-native ptants or declared pest Ono ClYes
(c) To ensure public safety Ono (Yes
(d) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing No OYes

necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
road, track or infrastructure
(e) A natural and ordinary consequence of other assessable development for which a CINo LYes
development approvat as defined under the Planning Act was given, or a development
application as defined under the Planning Act was made, before 16 May 2003

(f} For fodder harvesting CNno (Yes

(g) For thinning (No £1 Yes

(h) For clearing of encroachment OONo (Yes

(i) For an extractive industry CONe (Yes

() For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing (]No {1 Yes
purposes

(k) For clearing regrowth on freehold land, or indigenous land, in a wild river high preservation [No ClYes
area.

If no to all~ The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application,

If yes to any one, is the proposed clearing associated with a material change of use or reconfiguring a lot for which

referratis required in relation to.clearing vegetation (ie. did you answer ‘yes’ to all questions in either Q2.1.4 or Q 3.3)?

OO yYes

CJ No - Answer (a}(b) and (c) befows Uniess the advice provided below (in relation to afl elements of the proposed clearing) is *The clearing is not a
relevant purpose and the Assessment Manager must refuse to receive the application” - Complete Form 1, Part J. This application requires

assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment Manager. the agency has jurisdiction
as Concurrence Agency.

 

 

 

 

Page 23

Page 16

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

VEGETATION CLEARING; KOALA CONSERVATION, WILD RIVER AREA (con)

 

(a) Is any of the proposed clearing in an area declared as an area of high nature conservation value (other than a
wild river dectared area) or an-area vulnerable to land degradation under the Vegetation Management Act 1999?

CNo OYes

if yes, is any of the proposed clearing for (e), (f), (i) or j) above?

C) No oO Yes - The clearing is not a relevant purpose and the Assessment Manager must refuse fo receive the

application
(b) Is any of the proposed clearing in a wild river high preservation area declared under the Wild Rivers Act 2005?
TNno C1 Yes - Answer (i) and (i) below
{i) Is any of the proposed clearing for (a), (f), (g) or (i) above?
LI No - Refer to Footnote 4.2 O Yes

It yes, is there an approved property development plan applying to the land?
oO NO - The clearing is not a-relevant purpose and the Assessment Manager must-refuse to receive the application.

oO Yes - Untess the application is consistent with any approved property development plan applying to the land,
the Assessment Manager must refuse to receive it. Refer to Footnote 4.2

(ii) 1s any of the proposed clearing in a registered area of agriculture on a registered area of agriculture map?
(1 Yes ONo
If no, is any of the clearing for {j) or (k) above?
[No - Reter to Footnote 42 = L) Yes

If yes, is there an approved property development plan applying to the land?

oO No - The clearing is not for a relevant purpose and the Assessment Manager must refuse to receiva the
application
oO Y@S - Unless the application is consistent with any approved property development plan applying to the
Jand, the Assessment Manager must refuse to receive it. Refer to Footnote 4.2
(c)__ Is any of the proposed clearing in a koala conservation area or koala sustainability area?

CINo (Yes
If yes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
telation to proposed clearing in a koala conservation area or koala sustainability area (i.e. did you answer
‘yes’ to all questions in Q3. 12)?
(Yes No
If no, is any of the proposed clearing over an area greater than 2,500m2?
C1No
(1 Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.

IPA schedule 8 part 1 table + tems JA-1G IP Rayuloton scheduie 2 «a0 2 tem 5 pegetaton sean). 'P Ragulaton senertule 2 fable 2 tem 34 jxcela conservavon: iP Reguistion. scheciie } part
3. table 4 dem (vegetaton cleanng/waid aver area), Vegetalon Management Act 1999 secon 224 (vegetation clzanng wid mer area). Wid Rivers Act 2005 sections 31F ana 134

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

 

44

 

Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a watercourse, lake

or spring (other than under the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse?

{No (1 Yes - rhis application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency

If yes, is any of the proposed operationat work to be carried out in a wild river area under the Wild Rivers Act 2005?

oO Y@s - Depending on the purpose of the operational work and its proposed location in the wild river area, assessment may be required for the purposes of
the Wild Rivers Act 2005. Also, in certain circumstances an application for operational-work is taken to be not properly made and the Assessment
Manager must refuse to receive the application. (The relevant form for an application would depend on the nature of the work)

ONo
If no, is the work for the following?
« —Awater pump CINo = (7) Yes (Compiete Form ¢. Part Kz)
© Water storage LINo — [J Yes (Complete Form 1, Part Ka)
© — Gravity diversion from a watercourse CINo = [1 Yes (complete Form 1, Part Ka)
© — Watercourse diversion (No [1 Yes (Compiete Form 1, Part Ka)
¢ — Other work for taking of interfering with water CINo (1) Yes (Compiete Form 1, Part Ka)

IPA schettule 8 part 1 table 4 items Ha): IP Regulation, soneduie 2 table 2. tem 8. JP Regulation schedule ! past } table 4 stems 3 and 3A. Water Act 2000 seciton 266A (wild nver

 

 

area), Wid Rivers Act 2005, section 43A.

 

 

42 Subject to the declaration for the relevant witd river area, the application requires assessment for the purposes of the Wild Rivers Act 2005.

Page 24

Page 17

INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 21.0, 3 September 2007

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

45 Nn of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?

Yes - (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency hes jurisdiction as Concurrence Agency.

IPA, schedule 8 part 1 table 4. tem 3(b). IP Regulation schedu'e 2. t2ble 2 lem 3, {P Regulation schedule | gait 2 table 4 tem 3, Wild Rivers code (Note the code does not currently
contain applicabie provisions for taking of snlerfenng sath artesian water}

4.6 [Js any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?

 

 

No (1 Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 Jno [Yes
¢ — Aregulation under the IPA or another Act [no Dyes

If yes to either or both - (Complete Form 1, Part Ks). This application requires assessment by the Department of Natural Resources. and Water
(NRW). If NRW is not the Assessment Manager: for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessabie in a wild river dectaration and to be carried out in a wild
river area declared under the Wild Rivers Act 20057
OINo (71 Yes - Depending on the purpose of the operational work and its propased location in the wild river area, assessment may be required for
the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an appication for operational work is taken: to be not
properly made and the Assessment Manager must refuse to receive t. (Complete Form 1, Part Kaif an application is made.)

IPA schedule 8. part f, table 4 tei 3¢cy(i). P Regulation schedule 2. table 2 tem 8 IP Reguliton schedule | part 3 table 4. tem 3: Water Act 2009 section 966A {wild aver sea), Wild
Rivers Act 2005, section 43A

4.7 |\s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

 

No O01 Yes
If yes, are the operations mentioned as assessable development in the following?
« — Awater resource plan under the Water Act 2000 (No Yes
¢ — Aregulation under the IPA or another Act LNo O Yes

If yes to either or both- (Complete Form 1, Part K;) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule 8 pat | labe 4 tem Xchs), ‘P Regulation schedule 2 table 2 dem 3 1P Regulabon schedule } pat 3 table 4 tem 3 Water Act 2000 secion 968A (iid aver area, Hole no curant Wild
Paver declaration identifies talong or inter‘enng with subartesian water as assessable) Wild River code (/.0te the code does nct currently contain appicable provisions for subartesian water)

4.8 | \s any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water

No Yes - Answer both (a) and (b) below

{a) Is the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
Y@s - Depending on the purpose of the operationat work and its proposed location in the wild river area, assessment may be required for the
purposes of the Wild Rivers Act 2005. Aiso, in certain circumstances an application for operational work is taken to be not properly made
and the Assessment Manager must refuse to receive it. (Complete Form 1, Part Kioif an application is made.)

 

LNo
{f no, are the operations mentioned as assessable development in the following?
«  Awater resource plan under the Water Act 2000 LINo O Yes
e Aregulation under the IPA or another Act (No CJ Yes

If yes to either or both - (Complete Form 1. Part K1o) This application requires assessment by the Department of Naturat Resources
and Water (NRW). if NRW is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.

(b) {s the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodptain management area} and declared to be assessable under that Act?

CJ No Oo Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
{NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule 8, part }, table 4, tems 34c)1y) and Hd), iP Regutauan scnadule 2, table 2. item 9, iP Regulatinn schedu'e |. part 3. lable 4 nem 3A Water Act 2000. section 9668 {wild river area).
4.9 | \s the proposed operational work for the following?

© — For the construction of a referable dam as defined under the Water Act 2000 RlNo OD Yes

« — Toincrease the storage capacity of a referable dam by more than 10% he CO Yes

 

If yes to either or both - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule 8 part 1 table 4, tem 4 IP Regulation schec.’e 2 ‘abie 2 dem 10.

 

 

 

 

Page 25

Page 18

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

TIDAL WORK; WILD RIVER AREA
4.10 [1s any of the proposed operational work tidal work, other than excluded work defined under the PA?
No (Yes - Answer (a) and (b) below

(a) __|s any of the proposed tidal work prescribed tidal work?

| Cl Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
No

If no, is the work proposed in a canal?
(No

{f no, is any of the proposed tidal work for a marina with more than 6 vesseF berths?

oO No - (Complete Form 1, Part P). If the Environmental Protection Agency (EPA) is not the Assessment Manager for the
appication, the agency has jurisdiction as Concurrence Agency. The application aiso requires assessment-by Queensland
Transport (Maritime Safety Qid) as Concurrence Agency.

oO Yes - (Complete Form 1, Part P). if the Environmentat Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The apptication also requires assessment by Queenstand:
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.

 

 

0 Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vesset berths?
a) No - (Comptete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qi} as
Concurrence Agency.
oO Yes - (Complete Form 1. Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.

 

O Yes _--— ce ee cee ee

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

No - An application for the operational work would be taken to be not properly made and the Assessment Manager must
\ refuse to receive it.

 

0 Yes
Ifyes, is the work proposed in a canal?
No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

Oo No - Refer to Footnote 4.3 (Complete Farm 1, Part P} If the Environmental Protection Agency (EPA) is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid} as Concurrence Agency and
assessment for the purposes of the Wild Rivers Act 2005.

oO Y@S - Refer to Footnote 4.3 (Complete Form 1, Part P) if the Environmentat Protection Agency (EPA) is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application I
also requires assessment by Queensland Transport (Maritime Safety Qld} as Concurrence Agency and Qid Fire!
and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the application
also requires assessment for the purposes of the Wild Rivers Act 2005:

0 Yes

If yes, is any of the proposed tidat work for a marina with more than 6 vessel berths? '

Oo No -- Refer to Foatnote 4.3 (Complete Form 1, Part P) This appkcation must be referred to Queensland Transport
. {Maritime Safety Qtd} as Concurrence Agency Subject to the declaration for the relevant wild river area, the |
\ application also requires assessment for the purposes of the Wild Rivers Act 2005.

O Y@S - Refer to Footnote 4.3 (Complete Form 1, Part P) This application must be referred to Queensland Transport
(Maritime Safety Qa) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency, The
_____application also requires assessment for the purposes of the Wild Rivers Act 2005,

 

 

 

 

 

 

 

LJ No - Go to the first question on the next page

 

 

43 Unless the application is consistent with any property development plan applying to the tand, the Assessment Manager must refuse to receive it
Page 26

Page 19

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

TIDAL WORK; WILD RIVER AREA (cont)

 

IEno, is any of the proposed tidal work to be carried out in a wild river area declared under the Wiki Rivers Act 2005?
O Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

(CI No - An application for the operational work would be taken to be not properly made and the Assessment Manager
must refuse to receive it.

O Yes

If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

Oo No - Refer to Footnote 4.3 on page 26 (Complete Form 1, Part M) This appication requires assessment by the Environmental
Protection Agency (EPA). If EPA is nat the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The appication also requires assessment by Queensland Transport (Maritime Safety Qid) as
Concurrence Agency and, subject tothe declaration for the relevant wild river area, assessment for the purposes of the Wiki
Rivers Act 2005.

oO Yes - Reter to Footnote 4.3 on page 26 (Complete Form 1, Part M) This application requires assessment by the Environmental
Protection Agency (EPA). If EPA is not the Assessment Manager for the appiicalion, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensiand Transport (Maritime Sefety Qid) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild
river area, the appfication also requires assessment for the purposes of the Wild Rivers Act 2005.

(No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

| No - (Comptete Form 1, Part M) This appcation requires assessment by the Environmental Protection Agency (EPA). If EPA
js not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Salety Qld) as Concurrence Agency.

Oo Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The appication

also requires assessment by Queensland Transport (Maritime Safety Qk) as Concurrence Agency) and QM Fire and
Rescue Service as Advice Agency:

 

 

(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
© One only local government tidal area Ono (Yes

© — Starting in one local government tidal area and extending into another local government tidal CNo [Yes
area (but in no strategic port tidal area)

* — In two or more local government tidal areas but not starting in either local government tidal area CJNo Yes
¢ — One only strategic port tidal area CiNo LD Yes

e A tidal area that is not a strategic port tidal area or a local goverment tidal area (Jno Des

Note: The answers you provide above may affect who the Assessment Manager is for the application.

IPA schedule 8, part |. table 4 tem 5, IP Regulation schedule 2 table 2 tems 12 14 and 17 ¢P Reguiation schedule 1 part 3 table 4 stems 4A and 5: Coastal Protection and
Management Act 1995, seckon 104A (mild nver argas

 

 

 

 

Page 27

Page 20

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

 

4.11

 

Nein of the operational work proposed to be carried out within a coastal management district?

No Yes
If yes, is the proposed operational work for the following?
¢ Interfering with quarry material on State coastal tand above high-water mark (No (1) Yes
¢ Disposing of dredge spoil or other solid waste material in tidal water (No (Yes
« — Oraining or allowing drainage or flow water or other matter across State costal land above high- {No (Yes
water mark

¢ — Constructing or installing works in a watercourse where the works are not assessable under IPA, (Ono Yes
schedule 8, part t, table 4, items 3 or 4

¢ Reclaiming land under tidal watera OONo (Yes
* — Constructing an artificial waterway, other than acanal, associated with reconfiguring a lot Ono (Yes
* — Constructing an artificial waterway that is a canal, associated with reconfiguring a lota Ono (Yes

¢ — Constructing an artificial waterway not associated with reconfiguring a fot on land, other than State {No (1Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least
5,000m2

¢ — Constructing a bank or bund wail to establish a ponded pasture on land, other than State coastal CiNo [Yes
land, above high-water mark

¢ Removing or interfering with coastal dunes on tand, other than State coastal land, that is in an Ono (Yes
erosion prone area and above high-water mark

If yes to one or more, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is.nat the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency, If yes, above, to any shown-bold and marked
with the symbol 9, the application also requires assessment by Queensiand Transport (Marine Salety Qk) as Concurrence Agency.

Yes

If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005?

Yes - Unless the application is consistent with any property development plan applying to the fand, the Assessment Manager must refuse to
receive it (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as concurrence Agency. If yas, above, to any shawn bold and
marked wilh the symbol 8, the application also requires assessment by Queensland Transport (Marine Safety Qk) as Concurrence
Agency. Subject to the declaration for the relevant wild river area, the application also requires assessment for the purposes of the Wild
Rivers Act 2005,

oO No - An application for the operational work would be taken to-be not properly made and the Assessment Manager must refuse to receive it.

IPA schedule 8, part 1 lable 4 lam § IP Regulation schedule 2 tabie 2. tems 12 and 4 (P Reguiation schedule 1 oart 3 table 4. tems 44 and 5 Coastal Protection and Management
Act 1995 Act 1995, section 1044 (wil! aver araay, Wid Rivers Act 2005 section 134.

 

 

 

Page 28

Page 21

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

WATERWAY BARRIER WORKS; WILD RIVER AREA

4.12 4s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No C1 Yes

If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
(No
If no, is all of the operational work for constructing or raising waterway barrier works -
¢ _ intended to exist for no more than 28 days; and
© built or raised in freshwater; and
® no more than 20m in fength and no more than 3m in height from the lowest point on the stream bed?

0 Yes CINo

If no, is alt of the operational work for constructing or raising waterway barrier works -
© more than 100km from the coastline; and
inthe smallest unbranched tributary of a catchment or a stream into which that tributary flows

oO Yes oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.

 

Yes

If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?

) No - Uniess the application is consistent with any property development pian applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Os} This application requires assessment by the Department of Primary industries. and Fisheries (DP1&F}. and,
‘Subject lo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2008. if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

O Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse to receive it,

'PA, schedule 2, part 1. tabie 4 2m 6, IPA schedule 3 pad 2 labe 4 tem 2 iP Regulabon schedule 2 table 2 tem 28 iP Regulation. schedule t part J table 4. tem 6 Fishares Act
1994, section 76D {wild nver area), Wid Rivers Act 2005 section 43A

DECLARED FISH HABITAT AREA; WILD RIVER AREA

4.13 | ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 1994.

 

 

pee 0 Yes
yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)
* — The maintenance of existing structures, including for example the following structures, if the structures [_]No [} Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
« Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
+ Existing powerlines or associated powerline infrastructure

« — Educationat or research purposes relating to the fish habitat area EINo £) Yes

* Monitoring the impact of development on the declared fish habitat area (No (1 Yes

¢ — Other purposes [No (Yes
If yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wik
Rivers Act 2005?

oO No - (Compiete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI8F). If DPI&F is nokthe
Assessment Manager for the appication, the agency will have jurisdiction as Concurrence Agency.
U1 Yes

If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005?

Y@S - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and
assessment for the purposes of the Wild Rivers Act 2005. !f DPI&F is not the Assessment Manager for the application, the agency has
jusisdiction as Concurrence Agency.

(No

If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1. Part O2) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI&F
Js not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Y@S - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive
the application.

iA schedule 8 part | table 4 dem 7. IPA schedule 3 par 2 tine + sem 3 iP Regulation, senecul2 2 tanie 2 item 23. /P Reguiavon scheduie | part} tanad aem 7 Wild Rivers Act
20035 sections 424, Fisheries Act sechon 760C ; wid nver 237

 

 

 

 

 

Page 29

Page 22

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

 

4.14

 

Is gny of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
Ba No Yes

If yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box/es)

» The removal, destruction or damage of dead marine wood on unallocated State land, other than [JNo (1 Yes
in a wild river area, for trade or commerce

« — The maintenance of existing structures, including, for example, the following structures, if the [Ino (Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a

structure of that type —
« — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures
and weirs;

° — existing drainage structures;
« — existing powerlines or associated powerline infrastructure

¢ For educational or research purposes or for the monitoring the impact of development on marine no DYes
plants

« — Other purposes (ino ClvYes

Ht yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wild
River Act 2005?

oO No- (Complete Form 1, Part Oz) This appication requires assessment by the Department of Primary Industries and Fisheries (DPI&F). HOPIBF is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
0 Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 20057
Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must
refuse to receive it, (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries
and Fisheries (OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild
Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

CNo

If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?

oO Y@S - Unless the application is consistent with any property development pian applying to the land, the Assessment Manager must
refuse to receive it. (Complete For 1, Part Ox) This application requires assessment by the Department af Primary Industries
and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area. assessment for he purposes of the Wild
Rivers Act 2005. f DPI&F is not the Assessment Manager for the application, the agency has. jurisdiction as Concurrence
Agency.

oO No - An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse to
receive it.

IPA schedule 8 part { table 4, tem 8. ‘PA schedule 8 part 2 tabie 4 tem + -P Regulation schedule 2 table 2 vam 29, IP Regulation schedule ! part 3 ‘able ¢ .'em 8 Fishaues Act

 

 

1994, section 7608 (wid river area). Wild Rivers Act 2005, section 434.

 

Page 30

Page 23

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

WILD RIVER AREA
4.15 {Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
Neko O1Yes
Ifyes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
« — Agricuiturat activities as defined under the Wild Rivers Act 2005 CINo O Yes
¢ — Animal husbandry activities as defined under the Wild Rivers Act 2005 mn) Yes

If yes to either, is any part of the premises in the wild river high preservation area?

Oo Y@S - An application for the operationat work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CNo

If no, is the proposed use in retation to the production of 2 high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager must reluse to receive it.
Oo No - Untess the application is consistent with any property devetopment plan applying to the land, the Assessment Manager must refuse to

receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the

relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA schedule 8. part I. table 4. tem 10 1P Boguiation schedule 2 tanle 2 stern 37 Wed Rivers Act 2005 secuons 42 434

 

 

STATE-CONTROLLED ROAD
4.16 |Js gny part of the premises within 100m of a State-controlted road; or part of a future State-controlled road?
No Yes
If yes, is what the proposed operational work is associated with (Tick applicable box/es)
« — Amaterial change of use that is assessable under the planning scheme (No (ClYes

* — Reconfiguring a lot that does not increase the totat number of lots and does not increase the total Ono (Ces
number of lots abutting the State-controlled road

* Other No DYes

If yes to Other, and answers to questions in this section of the checklist indicate the proposed operational work is
assessable under IPA, schedule 8 - Answer (a) - (c) below.

(a) Is any of the proposed operational work associated with access to a State-controlled road?

oO No Yes - This application must be referred to the Department of Main Roads {DMR} as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
(J No Yes

If yes, is the operational work proposed in a future State-controlled road defined by route?
Oo No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
(1 Yes - this application must be referred to the DMR as Concurrence Agency.

(c) Ooes any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controiled road?
CINo 0 Yes

If yes, is the operationat work proposed in a future State-controlled road defined by route?
oO No - This application must be referred to the Department of Main Roads (OMR) as Advice Agency.

O Yes - This application must be relerred-to the DMR as Concurrence Agency.

IP Reguiation, schedule 2, lable 2. tem 3

 

 

 

 

Page 31

Page 24

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

$ ECTI O N 6 Section 6 must be completed for all application requiring completion of the IDAS Assessment Checklist. The
following questions relate to whether a referral agency response has been received prior to making an application.
PRE APPLICATION REFERRAL AGENCY RESPONSE

6.1 | Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application, which
Behe a statement that the referral agency does not require referrat of the application during the IDAS referral stage?

 

 

 

No
CD Yes - Complete Table A
TABLE A
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS —_| HAVE YOU SATISFI2D ANY CONDITIONS STATED
BEEN RECEIVED UNDER IPA S3.2.2 - fist a separate matter in each row IN THE RESPONSE?

 

1 Yes | C1 No | ( Noconditions

 

[CJ Yes | (2 No | © Noconditions

 

OJ Yes | CJ No | UJ Noconditions

 

O Yes | C1 No | ( Noconditions

 

O Yes | C1 No | C Noconditions

 

0 Yes | (No | (1 Noconditions

 

0 Yes | (1) No | CJ Nocontditions

 

 

 

 

 

 

ifyes for any of the referral matters listed in Table A - A referral for this matter is not required, and the relevant Part identified in the IDAS Assessment Checkiist is nol
required to be completed. A copy of the referrat agency response and evidence of how you have satisfied any
conditions stated in the response must be attached to your application.

tf no for any of tha referral matters listed in Table A - The relevant Part identified in the IDAS Assessment Checklist is required to be completed. The application must
be referred to the relevant referral agency, unless the referral agency is the Assessment Manager.

 

 

 

 

Page 35

Page 25

 

 

 

     
   

EXISTING TREES
Yellow Poinciana
Peltophorum pterocarpum

   
     
 
   
   
    

40No. lomandra ‘hystrix

MASS PLANTING
Lomandra hystrix

   

AR AK AW

NSA

AK ae Vk

VININGS

  

  
    

SECTION | Scale 1:50

50 mm COMPACTED 'DECO'
GRANITE. GEOTEXTILE WEED
MATTING UNDER
Finished to kerb jevel

   
  
     
   
 
 

     

MASS PLANTING
MULCHED BED

TIMBER EDGE

     
    
    

 

 

ESS eK

LSP
EX Ssh
a 6

a
RE

NNN

SY PS IN

 
  

 
    
     
 

40No. Lomandra ‘hystrix

    
 
 

  

PSSA |_|

40No Lomandra ‘hystrix

jlo. Lomandra ‘hystnx

PLAN VIEW J scale 1:25

 

 

  
 

141207] & | NSC OPERATIONAL WORKS APPROVAL

    
   
 

 - JNo Lomandra ‘hystrix

\" Lomandra ‘hystnx

 

 

1 ONo. Lomandra ‘hystrix

40No. Lomandra ‘hystrix

SETTLER'S COVE

CAPE BOUVARD SERENITY CLOSE
DEVELOPMENTS PTY. LTD NOOSA HEADS QLD. 4567

REFER DWG: SK/02

 

SERENITY CLOSE
STREETSCAPE IMPROVEMENT STRATEGY

An As Shown

= DEC. 2007 SG
BANKSIA AVENUE et A
PLAN Decomposed Granite ‘deco’ SS EE CAT

 
   

 

 

 

LOMANDRA hystrix

 

surface treatment

 

 

 

 

Page 26

PLANTING SCHEDULE : : _
| BOTANICAL NAME COMMON NAME - Sie | QUANTITY
LCALLISTEMON ‘Little Jon’ | Little John 140mm | 87

   
 
 
 
     

 

 

 

 

 

 

 

ISOLEPIS nodosa a Knobby Clubrush _ ] 2
LOMANDRA confertifolia - Litie Con
LOMANORA hystrix _| Mat Rust a

 

 

   

XANTHORRHOEA johnsoni Grass Tree

 

————— 40 No. LOMANDRA hystrix

15 No. LOMANDRA hystrix

 

 

ISOTD ALINGY9

A

ISOLEPSIS nodosa

   

3 no. Grass Trees

Xanthorrhoea johnsonii Granite Boulders

27 No's ISOLEPIS nodosa

NOTES

300mm deep Imported Garden Grade Topsoil
Minimum 50mm Deep Hoop Pine Much to all planting areas
Geotextile weed matting to be laid under gravel & ‘deco’

—_ 50 No's LOMANDRA hystrix surfaces

ARAAN

 

 

 

#

APSE

Existing Street Tree
Yellow Poinciana
Peltophorum pterocarpum

141207 A NSC OPERATIONAL WORKS APPROVAL SG

ee) ne eae Teena

 

= 40mm Mary River Gravel __
(Geotextile Weed Matting Under) Vee!

51 No's LOMANDRA confertifolia__ 56 Nos Cotistamon "Lite Jobrt SETTLER'S COVE

SETTLER'S COVE

 

CAPE BOUVARD SERENITY CLOSE
DEVELOPMENTS PTY. LTD NOOSA HEADS OLD. 4567

 

SERENITY CLOSE

BANksi, AVENUE ee

 

 

= *
DEC.2007- SG

 

 

SK/02 A
‘Coop oa age and serovar shame Dre ory CBE aa
SSS om aop ey mypey mr evan At
= = : was pormene SORE

Page 27

  
  
 
 
  
  

   
      
 
  

NOOSA DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier. Pleasgaietum to Admin Officer, Development)

APPLICATION AND GENERAL FEES BONDS - Bond Refund Detalls

  
 

Application Fees ° — Payee Name:
Road / Drainage Plan Exam O Address:
Road / Drainage Field inspecion | fee 23s | 52 |

 

 

Nv
0;

 

    
    
   
   

 

  
   

 

     
  

[LegalDocurentExaninaion CT YC
Sealing Fee - Survey Plans, Legal Documents [44
Sale of Documents, Pole Lit, Ws 68
Boning Adin Fee (Conibuions, uncompleted wars) | | 846 | Let Gateulation
[Closed Great TWinepecion PCC
[PrelodgenentMesingFee CT 7
CONTRIBUTIONS . " : : : | AMOUNT | RECEIPT TYPE | Plan Examination Calculation
| Developer Contibution—Landscaping | TO
[Developer Conbufon Road OherthanPSP_ TSC
Developer Conbulon~Oranage OherthanPSP_—| Ci Cd |
[Developer Conibuion =Pathway OterthanPSP____| | 888 | inspection Calculation :
one Cais sow tata PS Cong [fe eeetiencateniaton
[Developer Contibuion Otter Pas andConmuniy |_| 880 | ROADWORKS CONTRIBUTIONS ss
CS - Community Land (Not currently active) ; sti‘ 880 Catchment:
Sp PC ee eee
IOS Sewerage (FSP Coat ee
IOS ~ Sewerage ~ South Peregian (PSP Maraocty) | TT APPLICATION DETAILS _ :

ICS - Water Supply (PSP)

ICS - Sport and Recreation Land (PSP Parks)

CS - Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) If BA not entered then use 594
ICS — Pathway (PSP)

567
ST

Development Location:

 
 

Total of Fees Pald (Excluding Bonds)

    

CPI Date: Fe RECEIPT TYPE | File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond {| 51 (Cat 9)

=
[Total ofFees Paid nctuaing Bonds) |S G35. pateapeticatlon reperiy made aoe

 
 
 

P-fLand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

Mf 220/ su /

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0056 - Operational Works - Landscaping (Road Reserve) [As Published].pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.