INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
S ECT | O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41
Is any of the proposed operational work assessable under a planning scheme?
Oo No - Go to. Q4.2 ‘eS - (Complete Form 1, Part E) Answer Os4, 1.1 - 4.1.8 below.
STATE-CONTROLLED ROAD
441
SEN part of the premises within 100m of a State-controlled road; or part of a future State-controlled road?
No
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
ONo
(Yes
If yes, is all of the proposed operational work associated with the following?
* —Amaterial change of use that is assessable under the planning scheme (no (Yes
Reconfiguring a lot that does not increase the total number of lots and does. not increase the total CINo (1) Yes
number of lots abutting the State-controlled road
Oo Yes - This application must be referred to the Department af Main Roads.{DMR) as Concurrence Agency.
If no to either or both - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
No Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency,
(b) Is any of the proposed operational work for filling or excavation?
Kno §=6©. Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency
o Yes - This application must be referred to DMR as Concurrence Agency.
(c) oes any of the proposed aperational work invotve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-contratled road?
Kino = Yes
If yes, is the operational work proposed in a future State-controlled road defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Advice Agency.
oO Yes - This application must be referred to OMR as Concurrence Agency.
JP Regulation, schedule 2, table 3, tem 3, {P Regulation, schedule 2, table 3 tem 1(0)
ACID SULFATE SOILS
4.1.2
\s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development involving Acid Sulfate Soils?
RI No (Yes
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
No (Yes
If yes, does the proposed operational work involve the following?
« — Excavating more than 1,000m: of soil or sediment at or betow 5m AHD LNno fYes
Filling the premises with 1,000m? or more of material with an average depth of 0.5m on CINo (Yes
land, soil or sediment at or below 5m AHD
If yes to either or both - This application must to be referred to the Department of Natural Resources and Water (NRW) as Advice Agency
JP Regutation, schedule 2, table 3. tem 4; State Planning Policy 02 Planning and Managing Development invohing Acid Sullate Sous section 36
41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Cailiope, Catoundra, Cardwell, Carpentaria, Cook, Coaloola, Dougtas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroachy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.